Рет қаралды 1,198
www.newpig.com/lids-funnels - Learn how to install the PIG Latching Drum Lid to keep your drums and haz waste storage containers securely closed. The Fast-Latch Ring makes it fast and easy to stay in compliance with regs. They can even be opened and closed with one hand!
Looking for an easier way to comply with closed container regulations? Check out how easy it is to install the PIG Latching Drum Lid to your facility's drums.
Step-by-step description of the Latching Drum Lid installation:
1. Release lever handle to open fast-latch ring and slip ring over the rim of your drum.
2. Attach the drum lid by inserting the hinge pin. Insert the cotter pin.
3. Latch the drum lid by hooking the latch finger under latch bar and pushing the handle down.
That's it! That's how easy the PIG Latching Drum Lid makes it to keep your containers closed. bit.ly/lids-funnels
Shop: www.newpig.com/lids-funnels
Call us: 1-800-HOT-HOGS (468-4647)
Get Expert Advice: www.newpig.com/pig-expert-advice
Facebook: / newpigus
Instagram: / newpig_us
LinkedIn: / new-pig
#howtoinstall #latchinglid #newpig #hazwaste