I will try to make video but you can also calculate the current of the particular phase on which maximum load
@rakeshlearner2661 Жыл бұрын
Sir I have questions pless solve Jab hm load schedule banate h man le hamare room me 5 light 20 watt ka to Total load banata h hamraa 20*5 =100 watt Thik usi room me 16A 4 socket h Or 10 A Ke 4 socket h To hme ye pata karana h ki roome me Total Kitana load h watt Me Ya ampiar me
@harmindersinghsingj94812 жыл бұрын
Bhai j btao next video me ki Dubai me jo furrules lgate hai db dressing me wo kese pta chlta hai ki kis wire par Kon sa number furrule lagge ga or wo wire for kahan par lgge ga iss par full knowledge vali video bnao bhai
@EngineerTaj2 жыл бұрын
Load schedule dekh kar uske according ferrule lagate hai or breaker me connect karte hai
@naserkhan3132 жыл бұрын
Assalamualykum engineer Please make video on dewa drawing and load schedule submission online during design, execution and final inspection stage
@mepcotech Жыл бұрын
Hello Engr. How to calculate imax ?? Please reply
@EngineerTaj Жыл бұрын
Calculate the current of the phase which has the Maximum load
@Gilani9772 жыл бұрын
good job
@rakeshlearner2661 Жыл бұрын
Sir pless reply need to solve this problem
@subashans92852 жыл бұрын
Hello Eng.. which submittals are required to be submitted to Dewa like shop drawings, material submittals etc. Can we proceed to procure items based on consultant approval of shop drawings and materials. Or should we wait for dewa approval of shop drawings ? Please kindly clarify. Thanks..
@harmindersinghsingj94812 жыл бұрын
Bhai j bna huya aata hai ja for electrician ko Kam krne k baad me iss me details barni padti hai ja fir j schedule pehle bna huya aata or electrician ko iss ki details dekh kar karm krna hota hai? please reply krna
@EngineerTaj2 жыл бұрын
Electrician ko load schedule dekh kar db dressing karna hota hai, load schedule engineer banata hai
@harmindersinghsingj94812 жыл бұрын
@@EngineerTaj sir load schedule me likha hota hai ki kis wire pe kis number ka furrele lege ga or wo kis MCB, isolator par legega
@MajidAli-bv7iy Жыл бұрын
Nice
@EngineerTaj Жыл бұрын
Thanks
@KamalUddin-jq5lm2 жыл бұрын
👍🏻👍🏻
@sefatullah441 Жыл бұрын
designing load shedule is responsibility of design engineer not site engineer