How to prepare recovery schedule in P6 | Recovery Plan P6 Step by Step Complete Guide

  Рет қаралды 15,660

SoftEdemy

SoftEdemy

Күн бұрын

#softedemy,#Planningengineer,#primaverap6
In this video, I'll walk you through the steps of creating a recovery schedule in P6.
Time Stamps
00:10 - Introduction to Recovery Schedule
01:09 - At the End of the Video
02:34 - Project Statistics
06:32 - Remove Baseline
07:55 - Add any additional scope of Work
10:40 - Fix out of Sequence activities
12:10 - Fix activities without Predecessor
13:50 - Fix Finish Dates (Crashing Technique /Fast Tracking)
25:25 - Fix remaining Duration Decimal
28:01 - Change Duration for Completed Activities
29:36 - Change Dates for Completed Activities
30:40 - Change Duration for In Progress Activities
31:36 - Change Dates for In Progress Activities
33:02 - Create New Actual Start dates for In Progress Activities
38:15 - New actual Start Global Change
38:50 - New Actual Start = Actual Start
39:09 - Change Duration and Dates for InProgress Activities
39:28 - Summary of Recovery Schedule in P6
43:08 - Closing Out
ABOUT OUR CHANNEL
Project Controls & Engineering Software Academy Offers Accredited Courses and Resources on Project Management & Engineering Tools. Check Out our New Blog - Incorporating Articles on Projects.
Check out our channel here:
www.youtube.co...
Don’t forget to subscribe!
CHECK OUT OUR OTHER VIDEOS
How to fix out of sequence activities in P6 is finally revealed using an excel filter
• How to fix out of sequ...
FIND US AT
www.softedemy....
GET IN TOUCH
Contact us on info@softedemy.com
FOLLOW US ON SOCIAL
Get updates or reach out to Get updates on our Social Media Profiles!
Twitter: / faisalm15432091
Facebook: / softedemy
Instagram: / softedemy
LinkedIn: / softedemy
Telegram: t.me/SoftedemyP6
Contact Us
WhatsApp:wa.link/36dp7i
EV=PV revised schedule video
• PV=EV Revised Schedule...
Related or Similar Asked Questions related to the Video
How to prepare recovery schedule in P6
Recovery Plan P6
How to prepare recovery schedule in Primavera P6
How to make recovery Schedule in Primavera
Schedule Recovery techniques
Difference between revised schedule and recovery Schedule
What is recovery Schedule
How do I create a recovery Schedule
What is recovery plan in construction
How do I recover a project delay
What is meant by a project recovery
Project recovery Plan
How do you write a project recovery plan
How do create a recovery plan in primavera
How do you create a recovery plan?
What is a project recovery plan?
What is the purpose of a recovery plan
Recovery schedule example

Пікірлер: 36
@SoftEdemy
@SoftEdemy Жыл бұрын
EV=PV revised schedule video kzbin.info/www/bejne/n6jMfqyBlJ6Sm9E
@SoftEdemy
@SoftEdemy 2 жыл бұрын
To read the article visit at www.softedemy.com/how-to-prepare-recovery-schedule-in-p6/ Introduction Overview of Recovery Schedule Difference between Revised schedule and recovery Schedule. Recovery Schedule Revised Schedule What are the methods or techniques of schedule recovery? Crashing Technique Fast Tracking Technique What is Recovery Schedule? How to prepare recovery schedule in P6? Earned value management concept during prepare recovery schedule in P6 How Global change applies to activity types during recovery schedule in P6 Step-by-Step Guide to prepare recovery schedule in P6 practically Step-01. Remove the baseline if any assigned Step-02. Add any additional scope of work Step-03. Fix out of sequence activities Step-04. Fix unsatisfied relationships Step-05. Fix finish dates to existing dates or new approved dates Step-06. Fix remaining early start dates for in-progress activities to be = data date + 1 Step-07. Add or fix cost loading activities if any required Step-08. Fix remaining duration decimal if any required Step-09. Fix actual Start dates of in progress activities Step-10. Perform Global change for completed and In progress activities Three Ways To Fix The Issue With In-Progress Activities First Way Second Way Third Way Video demonstration of the whole article on how to prepare recovery schedule in P6 Conclusion
@SoftEdemy
@SoftEdemy Жыл бұрын
WhatsApp:wa.me/+923155537580 Website : www.softedemy.com For any query contact us on our email : info@softedemy.com
@lara4043
@lara4043 2 жыл бұрын
Thank you for this in depth explanation.
@SoftEdemy
@SoftEdemy 2 жыл бұрын
Welcome, Long time to see you. how is the work going on.
@SoftEdemy
@SoftEdemy 2 жыл бұрын
Welcome,your feedback is appreciated
@BedarBukhat
@BedarBukhat 2 ай бұрын
Hii Sir , When we getting approval of baseline from client/ Consulta nt then from this baseline we we prepare recovery plan and adding percentage of each activity and adding actual dates of each activity? Before adding actual dates and percentages we remove the assign baseline?
@SoftEdemy
@SoftEdemy 2 ай бұрын
@@BedarBukhat recovery baseline are prepared on update schedule not baseline schedule
@BedarBukhat
@BedarBukhat 2 ай бұрын
@@SoftEdemy we take copy of baseline and then we update the schedule ?
@SoftEdemy
@SoftEdemy 2 ай бұрын
@@BedarBukhat no use previous weekly and monthly updated schedule
@BedarBukhat
@BedarBukhat 2 ай бұрын
@@SoftEdemy if we don’t have previous updated schedule and if I am doing first time update the schedule then I can do this?
@SoftEdemy
@SoftEdemy 2 ай бұрын
@@BedarBukhat yes then you can do this. First update the schedule them recovery schedule
@NANYANG-ju3su
@NANYANG-ju3su 3 ай бұрын
Hi Sir , I 'd like to know how can I get that column named A-new start actual start Date ? It can be set by myself ?
@SoftEdemy
@SoftEdemy 3 ай бұрын
User defined field
@malikkhan7510
@malikkhan7510 2 жыл бұрын
Thank you
@SoftEdemy
@SoftEdemy 2 жыл бұрын
Welcome Malik Khan
@mohammedzeeshan4405
@mohammedzeeshan4405 Жыл бұрын
Sir, after removing baseline from the schedule my baseline finish date & finish date is not showing same. What should I do?
@SoftEdemy
@SoftEdemy Жыл бұрын
Contact to my WhatsApp number given at the end of video.thanks
@businessshout228
@businessshout228 11 ай бұрын
I dont have integer column, how i will have this column ?
@SoftEdemy
@SoftEdemy 11 ай бұрын
It's user defined field add from user defined field
@Juankuribe
@Juankuribe Жыл бұрын
Why are you changing the actual start dates? why this this change being performed? So now the schedule will show different actual dates different than the project records
@SoftEdemy
@SoftEdemy Жыл бұрын
Read the article pinned in the comments You will understand everything
@Juankuribe
@Juankuribe Жыл бұрын
@@SoftEdemy Thanks for the article. I
@SoftEdemy
@SoftEdemy Жыл бұрын
@@Juankuribe welcome
@muhammadsaad883
@muhammadsaad883 2 жыл бұрын
please , can you send me the file in this video?
@SoftEdemy
@SoftEdemy 2 жыл бұрын
Please get the downloadable file from the below link www.softedemy.com/product/recovery-schedule-july-2022/
@yuminxu4806
@yuminxu4806 Жыл бұрын
STEP 6 is not been explained
@SoftEdemy
@SoftEdemy Жыл бұрын
Read the article for detail .All the doubts and answers of questions have been given in it
@SoftEdemy
@SoftEdemy Жыл бұрын
See the end of the video ,their is other method to fix actual start date.thats also step6 . For more in detail .Read my article
@patrickpat9721
@patrickpat9721 11 ай бұрын
Ur all video is quite informatics. However, u need to improve ur since way of explanation
@SoftEdemy
@SoftEdemy 11 ай бұрын
Thanks for your feedback. I will improve. I like it.
@patrickpat9721
@patrickpat9721 11 ай бұрын
@@SoftEdemy Is is mandatory to assign cost in schedule to reflect the schedule %complete at wbs level
@SoftEdemy
@SoftEdemy 11 ай бұрын
@@patrickpat9721 yes
@patrickpat9721
@patrickpat9721 11 ай бұрын
@@SoftEdemy Does schedule %complete will reflect at wbs level if we assign only resource labor without price or anything.
@SoftEdemy
@SoftEdemy 11 ай бұрын
@@patrickpat9721 without cost no scedule and performance percent complete
The CUTEST flower girl on YouTube (2019-2024)
00:10
Hungry FAM
Рет қаралды 38 МЛН
王子原来是假正经#艾莎
00:39
在逃的公主
Рет қаралды 25 МЛН
Recovery Schedule | Tips | Tricks | Steps
10:00
Planning Engineer FZE.
Рет қаралды 10 М.
🔴 How to Create Recovery Schedule S-Curve
17:27
Ahmad Setayandeh
Рет қаралды 6 М.
PRIMAVERA P6 MADE EASY! Schedule Recovery in P6
13:28
ACE Consulting
Рет қаралды 4,4 М.
Critical Path Analysis in P6 - 5 Things I Wish I Knew Earlier
9:55
Plan Academy Inc.
Рет қаралды 202 М.
Introduction Lesson 01
7:00
Ali Katary
Рет қаралды 9 М.
The CUTEST flower girl on YouTube (2019-2024)
00:10
Hungry FAM
Рет қаралды 38 МЛН