Great job with the power supply cord behind the rack... Pro work.
@hanslozanofreitas9998 Жыл бұрын
Buen trabajo, felicitaciones Roberto. un saludo fraterno desde Perú.
@shawnphillips1220 Жыл бұрын
Very clean. I would gave used shorter jumper cables but you made it look clean with the wire manager. I have the same NVR, lol
@20DDan2 жыл бұрын
Brilliant! Color coded so you can easily know what cable goes where. Plus in case of failure easy to trace.
@whitneyeaton5585 Жыл бұрын
Neat, well done!
@clarissevlogs51782 жыл бұрын
Watching all the way from Dubai po
@teampascualgames2 жыл бұрын
Dami nmn sir buhol buhol na hehehe ingat po
@Oomtet2 жыл бұрын
Nice one
@frincezahgarcia85402 жыл бұрын
Ang hirap pala ng ginagawa mo napaka mabusisi.. Great job po.
@SwiatLinuksaАй бұрын
I love spaghetti 😂❤
@mind_eva_lution2 ай бұрын
Work is good but its quite messy. the patch panel work is quite unprofessional but really appreciate the patching work, The component you have used Rack is super fine @Roberto Basic
@robertobasic1012 ай бұрын
Thanks, It's been more than 2 years since i make this
@contructionidea9917 ай бұрын
verry good
@milesdyson52114 ай бұрын
Its 9.999 to the power of 2 is usually IT that makes the messes like this
@AdrianMartinezOK7 ай бұрын
Amazing Roberto, pls list the hardware and parts used if you can.
@robertobasic1016 ай бұрын
Data cabinet, patch cord, patch panel, cable organizer, PDU, tray
@timmaloney89262 жыл бұрын
I know it is an old video. But what about the cables still coiled up on the floor? Also punched between cabinet and wall. Best mounting is into studs not dry wall anchors.
@davidl6566 Жыл бұрын
The rack is mounted to a cement wall, channel is from Philippines, but it seems they (or at least that specific building) is european style and not american- cement/cinder blocks on inside walls instead of studs and drywall, those plugs will likely have a good chance at holding the cabinet with him sitting on top, not sure with the way he drilled though...
@bandar2970 Жыл бұрын
Perfect
@Pitoumotorsport Жыл бұрын
Donc chez vous on fixe la baie de brassage presque au sol ? c'est pratique pour dépanner ?
@AbebeEndebu Жыл бұрын
Its goog teaching
@qonib2 жыл бұрын
well done
@lawrencematos74934 ай бұрын
One thing I would of done was to put some fire retardant spray foam on that big opening, you’ll probably get excessive heat from the wall opening and dust and probably bugs if any ..
@cathyleishman6370 Жыл бұрын
What is the brand and model number of the data cabinet you used? Did you purchase it from Amazon?
@robertobasic101 Жыл бұрын
Local produce and local distributor only. 9u 45cm x 65cm.
@antoniomascia1039Ай бұрын
bravissimo come voglio fare a casa mia
@AlecSpence Жыл бұрын
Crikey!
@beimghadaw2 жыл бұрын
👍
@tts77862 жыл бұрын
Nice video - what size is this cabinet? Is it 9U?
@robertobasic1012 жыл бұрын
Yes, it is!
@gordarcher974810 ай бұрын
Can't say as I've ever built a network but A)Why not just use shorter patch cords and skip the need for cable management. Put the switch right under the patch panel and use 2-3 inch patch cord. B)Are patch cords packaged only individually? Frustrating and wasteful. I would have thought they'd be sold in packages of 1, 8, 16, 24
@robertobasic1019 ай бұрын
the patch cords are supplied by the company. i can only work on what available materials.
@gordarcher97489 ай бұрын
@@robertobasic101 That must irk somewhat. You probably want the right tools for the right job. Not acceptable tools for the right job.
@austinreeves52217 ай бұрын
I agree. Looks good in the glass but everything else looks terrible. Cable not dressed. all patch cords just shoved over the switch.
@watora_mari5 ай бұрын
For flexibility and scalability in many ways.
@AlexFlaherty-x6l28 күн бұрын
It depends on what the customer wants
@cwally1994 Жыл бұрын
What is the purpose of the device on your chin?
@francisadamtey9841 Жыл бұрын
Hi 😊
@robertobasic101 Жыл бұрын
hello
@Олександр-с3р3ь Жыл бұрын
Аre you an electrician? Why these spaces? It is necessary to place the equipment tightly. Thus, one month will be enough for a device with uninterrupted power supply. The cable must be laid in "pigtails"... Colored patch cords will not help when the work is done poorly. Of course, in the case when the customer knows how this work should look.