Thank you, Mr. Lamptey. You’re awesome. Great job.
@IshmealLamptey9 ай бұрын
Thank you very much 🙏
@rubybracewell23199 ай бұрын
Thank you so much Sir, Very clear and direct to the point
@IshmealLamptey9 ай бұрын
You're welcome
@JamesKale-c8n9 ай бұрын
Great job sir, very insightful... I trust the process.
@IshmealLamptey9 ай бұрын
Thank you
@samueletsiakoh63749 ай бұрын
Very insightful! Thanks for sharing.
@IshmealLamptey9 ай бұрын
Glad it was helpful!
@rubyamanda90099 ай бұрын
very Insightful! in feets please what is the land size for this project. please can you make a video on the cost break down?
@IshmealLamptey9 ай бұрын
Thank you. The plot size is 200x80 feet. I sure will make a video on the cost breakdown soon.
@israelpatawah42469 ай бұрын
helpful😊
@IshmealLamptey9 ай бұрын
Thank you
@okyeredoris24609 ай бұрын
Hello bro Ishmael please how many iron rods can you give as estimate for 2 bedroom self contained storey for the flow
@IshmealLamptey9 ай бұрын
Unfortunately I can't give quantity of iron rods needed without seeing the building plan.
@okyeredoris24609 ай бұрын
@@IshmealLamptey oh ok bro
@bhat_ysrael9 ай бұрын
In regards to the plumbing of the toilets, doesn’t one version have issues with bad smells versus the other? I can't remember which one, the S trap or the P trap. Do the toilets on the upper floors use a different trap than the ones on the ground floor?
@IshmealLamptey9 ай бұрын
You can use either S-Trap or P-Trap for any and it's fine. The smell may be as a result of improper sizing of vent pipe and not necessarily from the WC. Each of the Traps, whether P or S holds water to prevent back smell unless the WC wasn't designed well
@efeyaachaa48702 ай бұрын
Hello Ishmeal, after the decking, how many blocks can make 2 flats on the first floor? Any estimated idea, and how many days must it take to lay 3000 blocks and at what cost in labour? 😮😅
@IshmealLamptey2 ай бұрын
Hi, these information will be best determined by the engineer working on the project. 😀
@nestabruce-nanakeain6744 ай бұрын
Could you have skipped lintel and the 2 block work on top of it? What should be the implications if you had skipped lintel and directly had constructed the decking
@IshmealLamptey4 ай бұрын
We could have skipped lintle, but would have still required a beam before thr decking. Usually, the lintle also helps for more stability.
@charlottebotchway59987 ай бұрын
Hi please do you know where in Ghana I can buy driveway paving grids
@IshmealLamptey7 ай бұрын
You can get some in Accra please
@philipofori16929 ай бұрын
Impressive project. I am assuming that's 4 plots? Also do you happen to know the floor size? Of the house?
@IshmealLamptey9 ай бұрын
That's two plots instead. The area the building is covering is 2436 square feet
@isdic17329 ай бұрын
What is the total area?
@IshmealLamptey9 ай бұрын
2436 square feet
@alexsunkwa76299 ай бұрын
❤
@TheBelchersApprecitiveEye9 ай бұрын
Please are you available to provide your service as a project manager for beginning and ending of future homes? If so, we would love to communicate with you for your service.
@IshmealLamptey9 ай бұрын
My availability will depend on a couple of factors. Maybe we can discuss that via WhatsApp on +233547658523