Рет қаралды 491
CS Bio's Chief Operating Officer Jason Chang talks about working with Level 10 during the construction process of their new building in Menlo Park.
Project details:
New 35,000-sq.-ft.,three-story, cGMP peptide manufacturing facility, with laboratory, clean rooms, office and conference spaces.
The steel moment frame building was connected to an existing laboratory facility and separated by a seismic joint. The existing lab facility underwent exterior and interior renovation. Sitework included an equipment yard, roadways, landscaping and irrigation, bioswales and new utilities.
The facility is located in a cul-de-sac, which received new asphalt concrete and sidewalks in order to provide proper storm drainage and accessible paths of travel to the buildings.
Design-build MEPF, skin and exterior framing. LEED Gold.