Рет қаралды 5,520
An enormous number of logs are being piled up in the new Kuldipsingh harbour. Starting on August 10th, this wood is brought in daily from 6:00am to 6:00pm.
Then, 24 hours a day, the logs (10,000 cubic meters of wood in all!) are loaded into the hold of the 158 meter ship "Tien Fei". This is precise and accurate work, but no problem for the experienced Kuldipsingh drivers.