Lagan at Guernsey Airport - Excavator Pulls Out Trees at The West End

  Рет қаралды 834

MrBooojangles

MrBooojangles

7 жыл бұрын

Lagan Construction sub contractors, Bob Froome & Sons LTD, using a Hitachi Zaxis 180LCN, to pull out trees at the west end of Guernsey Airport on the 24th April 2012.
This area used to have two houses on it. They were demolished and the hedges and garden were cleared as part of the airport project. The trees being removed were part of the rear boundry of the properties and they were going to be turned into wood chippings afterwards.
AIRPORT HISTORY AND LAGAN CONSTRUCTION'S WORK
Guernsey Airport opened on the 5th May 1939, and today handles nearly a million travellers every year.
In 2002 the new airport terminal building, car park and surrounding area, was built by Hochtief and became operational on the 19th May 2004. Hochtief also demolished the old terminal building that dated from 1939.
Originally Guernsey Airport had four grass runways, but 1960 saw the construction of a new single tarmacked runway 4,800 ft (1,463 m) long.
In March 2012, Lagan Construction began work on a major programme of essential maintenance and improvements, representing probably the largest development at the airport in more than 70 years. The project was called Airport 2040 and the work that was done is expected to keep the airport going until the year 2040. The work which cost £80million (€93 million at the time) was due to last 22 months, but actually finished two months ahead of schedule.
The work included:
* Construction of an additional 120 metre runway section to the west.
* Create longer grass safety areas at both ends of the runway.
* Removing a long dip in the runway by building it up.
* Resurfacing of the whole runway.
* Resurface all the taxiways.
* Extend the existing taxiway to join up with the runway extension.
* Install a new surface water drainage system.
* Reconstruct all the concrete apron areas.
* Construct new apron areas where there were grass areas.
* Provide additional aircraft stands on the aprons.
* Install new ground lighting.
* Install new navigational aids.
* Move and replace all the runway approach lights.
Most of the work on the apron was done during the day, but the work on the runway was mainly carried out at night, while the airport was closed. The runway then had to be returned to a usable state prior to reopening at 6am each morning. That element of the project was expected to last around seven months. To carry out the work, Lagan Construction built a concrete batching plant on a field opposite the airport entrance, it built a village of portacabins near the Mallard Hotel to house it's staff, they built an office block built out of portacabins on a site at the back of the spectators car park at La Villiaze and they built a temporary dock at St. Sampsons Harbour.
This dock was where small cargo ships constantly delivered different grades of sand and aggregate for the project, which were then stored in huge heaps on the Longue Hougue reclamation site. The sand and aggregates were then transported using a fleet of large trucks and John Deere tractors and trailers from there to Guernsey Airport. All the plant machinery and trucks used for the project arrived on the local RoRo ferries, Commodore Goodwill and Commodore Clipper and were moved in convoy from St. Peter Port Harbour, to the airport overnight, when the roads were empty of traffic.
www.laganconstruction.com/laga...
theoldsite.gov.gg/CHttpHandler...
www.bbc.co.uk/news/world-europ...

Пікірлер
Lagan at Guernsey Airport - Excavator Loads ADT at The West End
6:25
Lagan Unloading Aggregate From Ships at St. Sampsons Harbour, Guernsey
11:15
Nutella bro sis family Challenge 😋
00:31
Mr. Clabik
Рет қаралды 11 МЛН
孩子多的烦恼?#火影忍者 #家庭 #佐助
00:31
火影忍者一家
Рет қаралды 46 МЛН
THE POLICE TAKES ME! feat @PANDAGIRLOFFICIAL #shorts
00:31
PANDA BOI
Рет қаралды 24 МЛН
TEN MILLION VIEWS - THANK YOU SO MUCH
6:02
MrBooojangles
Рет қаралды 994
Incredible.! Dump Trucks 5Ton Driver Fail- Safety Operator- Technique Skills Help By Two CraneTrucks
1:02:59
គ្រឿងចក្រ Power Machines
Рет қаралды 20 М.
Lagan at Guernsey Airport - Night Work on The Runway
16:18
MrBooojangles
Рет қаралды 235
Finally lol.... 🔊👌🏻
3:50
Thunder Child
Рет қаралды 25 М.
I dug this MASSIVE hole! | Expanding the Borrow Pit.
46:10
Diesel Creek
Рет қаралды 356 М.
Быков - об Арестовиче, Зеленском и когда все станет хорошо
2:21:48
Nutella bro sis family Challenge 😋
00:31
Mr. Clabik
Рет қаралды 11 МЛН