Thank you, your comments greatly appreciated. Dave.
@anthonyfindlay466 Жыл бұрын
Thank you Dave your videos are always very clear, informative and educational, thanks for sharing 🙏
@learnelectrics4402 Жыл бұрын
Very welcome Anthony, thanks.
@AndrewBaker-z9r Жыл бұрын
The best teacher there is.
@learnelectrics4402 Жыл бұрын
We normally only sign off our own work. We are liable for what we sign for. Same with EICRs, we sign for the inspection work we have done,
@drunkinpiper Жыл бұрын
Clearly explained video, keep them coming!
@learnelectrics4402 Жыл бұрын
Thanks, will do, keep watching, spread the word. Dave.
@andyfarmer85918 ай бұрын
Brilliant informative, keep it up, it's much appreciated.
@learnelectrics44028 ай бұрын
Will do Andy. thank you. Dave.
@danielteyehuago16333 ай бұрын
Wow! This video is very informative and the best video tutorial on the topic for me so far. I really appreciate it. Thanks for sharing it with us.
@learnelectrics44023 ай бұрын
Glad you enjoyed it, lots more on the way.
@danielteyehuago16333 ай бұрын
@@learnelectrics4402 welcome
@adnanidf94 Жыл бұрын
Another great video. I look forward to the next one.
@learnelectrics4402 Жыл бұрын
Lots more to come. Thanks for the feedback. Dave.
@THECARKUS Жыл бұрын
A class act again. Thank you!
@learnelectrics4402 Жыл бұрын
My pleasure and thanks for watching. Dave.
@ipmoroca2 ай бұрын
Very informative!
@learnelectrics44022 ай бұрын
Glad you think so and thank you.
@Roq-stone Жыл бұрын
Accurate and meaningful info
@learnelectrics4402 Жыл бұрын
Thanks Albert, much appreciated comments. Dave.
@josephobiero28042 ай бұрын
Well explained 👏
@learnelectrics44022 ай бұрын
Thank you, much appreciated.
@rajanvarghese2352 Жыл бұрын
Thanks for the videos, appreciated very much. ❤😊
@learnelectrics4402 Жыл бұрын
Thanks for watching. Lots more to come. Dave.
@bluetilly5468 Жыл бұрын
Your videos are so informative, I preach them to the apprentices I work with. I wish that you would do one covering solar panel installation or wind or hydro electric installs
@learnelectrics4402 Жыл бұрын
Good suggestion, its now on the list. Thanks for watching and thanks for spreading the word. Dave.
@crumdub12 Жыл бұрын
Fantastic video, thank you
@learnelectrics4402 Жыл бұрын
Glad you enjoyed it and thanks for watching.
@michaelcostello6991 Жыл бұрын
Very Helpful
@learnelectrics4402 Жыл бұрын
Glad it helped, lots more to come. Thanks. Dave.
@SamJ26.5 ай бұрын
Thanks for the videos
@learnelectrics44025 ай бұрын
Glad you like them, appreciated.
@brianhewitt8618 Жыл бұрын
Excellent 👌
@learnelectrics4402 Жыл бұрын
Thank you my friend. Dave.
@Jim804 Жыл бұрын
Hi Dave, Thanks for another informative piece. I heard recently about a case where a neutral was left out on a DB board and the main switch was turned on causing 400v to float across all 3 phases. I understand they are connected to the neutral at the source (delta/star) but not fully understanding how you can end up with 400v going through each individual phase & consequently damaging 230v equipment. If you ever have the chance to explain this, i & hopefully many would find it very educational. 👍
@learnelectrics4402 Жыл бұрын
What an excellent idea for a video. Its now on the list. Dave.
@krazylad8429 күн бұрын
Thanks alot very informative. How do we fed single phase from 3 phase ? what are the precautions and what is the maximum breaker available etc?
@learnelectrics440226 күн бұрын
Watch the video on the link below. Thanks for watching. Dave. kzbin.info/www/bejne/oKfNZIt_Zdx7fdU
@mikegmarshall Жыл бұрын
‘Linking three phases is noisy and produces a a very bright light’🤣🤣
@learnelectrics4402 Жыл бұрын
Oh yes! Thanks for watching. Dave.
@TitchgamerRG Жыл бұрын
Great video as always Dave! Personal gripe of mine which you never mentioned though is cable/conductor numbering. Nout worse than working in a highly populated board full of singles where the Neutrals and CPC's are mixed up and not in the correctly numbered terminals!!
@learnelectrics4402 Жыл бұрын
Good point Andy, and many an Anglo-Saxon expletive has escaped my lips when I've opened up a spaghetti board. Hope you're keeping well. Sami is over in France at the moment. Take care matey.
@TitchgamerRG Жыл бұрын
@@learnelectrics4402 same! In France eh? Alright for some ey!? Keeping well here, Hope you are to? :)
@learnelectrics4402 Жыл бұрын
Bostin, as they say. Catch you again Andy.
@diegoestrada53509 ай бұрын
Do you consider Load balancing when adding Single Phase circuits from a 3 phase board that al ready has a 3p Circuit Breaker? I have a medium printer that works on a 3 phase supply, 10 amp per phase, but i need to add a Single phase heater that consumes 15Amp, is there a way to avoid this imbalance?
@learnelectrics44029 ай бұрын
you can only balance it if you have other loads that can be switched to different phases to balance things. Look at the overall balance on the whole board with a clamp meter.
@THECARKUS Жыл бұрын
Dave. I wonder why the Earth has to pass through the same point as the Line and Neutral conductors in a metal board? Considering the board is bonded to Earth I cannot think of a reason... Any idea? Thanks again! Mark.
@Roq-stone Жыл бұрын
This is to ensure a zero sum current through the hole and no eddy currents n the casing. Remember that there is also the possibility of earth fault currents! Hence the reason for all five (5) conductors of the same circuit to pass through the same port.
@learnelectrics4402 Жыл бұрын
Thanks Albert, there is nothing that I can add. Thanks for the input. Dave.
@Yaki-2505 Жыл бұрын
Pls consider a possible overload of the N!. The return current of all 3 phases will be on one neutral.
@learnelectrics4402 Жыл бұрын
Thanks for watching. Have a look at this video, very useful. Dave. kzbin.info/www/bejne/sJ2rk6aKacebiJo
@Death8875810 ай бұрын
I still don't understand if single phase boards/consumer units supplied from a three phase board share the same main earth from the supply? Lets say i have 1 three phase board supplying 3 single phase boards,to measure Ze would only the main earthing from the distribution board need to be disconnected to measure Ze or you have to do this for the other 3 single phase boards(do they have different main earthing conductors?)
@learnelectrics440210 ай бұрын
Ze is measured at the point at which the supply enters the building. You will only need to disconnect the earth at the DB where you are testing. This video will help on this link. kzbin.info/www/bejne/m3qwYWCri9mJZqc
@Death8875810 ай бұрын
@@learnelectrics4402 Fantastic video,so for measuring Zdb you still disconnect earth at each subsequent consumer unit to get the measurement,thanks. Wish I could tip a coffee right now.
@roystonpereira2887 Жыл бұрын
Great video again 👏🏼
@learnelectrics4402 Жыл бұрын
Appreciate that, thanks for the feedback. Dave.
@danielteyehuago1633 Жыл бұрын
I'm here again
@learnelectrics4402 Жыл бұрын
Where have you been. We do notice these things. Thanks for watching. Dave.