Don’t underestimate these lectures super helpful in the way she explains it I was trying to understand OLR earlier and was having trouble she makes it easy. Thanks from a new OIT
@diyaazaghloul756 Жыл бұрын
Amazing video thank you for sharing this information
@basilaldoory42656 жыл бұрын
best KZbin for waste water...good job
@feedyourfaith73926 жыл бұрын
Good video on wastewater planet and equipment
@HadiAlAzawi5 жыл бұрын
Great video, but I have one comment for you: When you calculated the Weir loading rate (W), minute 40 of your video, the unit is not matching. the Weir loading rate units should be (Gal/day-ft), thus there is no need to multiply by 7.48 gal/ft3. Thanks
@donday35795 жыл бұрын
Thank you for comment Hadi, I was confused why the circumference was multiplied by 7.48 ft3. But also After multiplying by 7.48 ft3 would the answer be 530 ft2/day? Thanks for your video it is helping me understand the material a lot better than just reading.
@futuristic19866 жыл бұрын
Great video and very useful.
@iIiWARHEADiIi2 жыл бұрын
Is it good to mix mg/l*lb/ft, would produce meaningless result if would be used without conversion?
@omerali7047 Жыл бұрын
Very important lecture
@VikasSingh-mf8nc3 жыл бұрын
Pls. Tell me procedure to find out sludge % & TSS (totsl Suspended solids) in Vinasse / spent wash.
@dr.lokeshkumar31293 жыл бұрын
Good
@abin56992 жыл бұрын
wish you succeed!
@holycow82333 жыл бұрын
wonder if she ever figured out Davidson pie charts are what we really use in water and waste water treatment math?
@pascatl51754 жыл бұрын
thank you
@michaelferguson96756 жыл бұрын
Great video, very informative. Thank you for making this video. Can u please dumb down the math. Perhaps Davidson Pie