TCC-1200 Bridge Construction in Indiana

  Рет қаралды 651

Link-Belt Cranes

Link-Belt Cranes

Күн бұрын

Milestone Contractors of Columbus, Indiana position their Link-Belt Cranes 120-ton (110-mt) TCC-1200 telescopic crawler crane for bridge foundation work on Interstate 74 in Southern Indiana next to the Whitewater River. The TCC-1200 lifts concrete forms and rebar cages for bridge pier construction. The project includes replacing superstructures on both I-74 bridges. Overall completion date is June 2024, with an intermediate completion date for both bridges in fall 2023.

Пікірлер
TCC-800 Assembly
7:13
Link-Belt Cranes
Рет қаралды 4,7 М.
How to treat Acne💉
00:31
ISSEI / いっせい
Рет қаралды 108 МЛН
Cat mode and a glass of water #family #humor #fun
00:22
Kotiki_Z
Рет қаралды 42 МЛН
Don’t Choose The Wrong Box 😱
00:41
Topper Guild
Рет қаралды 62 МЛН
Cheerleader Transformation That Left Everyone Speechless! #shorts
00:27
Fabiosa Best Lifehacks
Рет қаралды 16 МЛН
Modern Bridge Construction Time Lapse Compilation
13:22
Cherry On Top TerraTech
Рет қаралды 808 М.
The Bridge That Changed the Map of Europe
16:58
The B1M
Рет қаралды 1,4 МЛН
1.5 Years of Heavy Construction in 1.5 Hours
1:36:35
Practical Engineering
Рет қаралды 593 М.
Liebherr Crane Mobile - Customer Days 2012 - large.wmv
2:09
Hutton Strader
Рет қаралды 8 МЛН
How a bridge is built over deep water | Suspension Bridge
4:00
3D Living Studio
Рет қаралды 3,3 МЛН
How Tower Cranes Build Themselves
10:50
Art of Engineering
Рет қаралды 7 МЛН
TCC-2500: See the Link-Belt Difference
4:49
Link-Belt Cranes
Рет қаралды 25 М.
THIS is Why Your Heat Bill is So High
18:21
Home RenoVision DIY
Рет қаралды 1,8 МЛН
How to treat Acne💉
00:31
ISSEI / いっせい
Рет қаралды 108 МЛН