Loco shed track choices?

  Рет қаралды 4,505

Wallsrail

Wallsrail

Жыл бұрын

Help me choose the track layout of the loco shed approaches
Option 1 Single lead
Option 2 Separate Arr/Dep lines
The outcome will be decided by you my viewers and will built next weekend 06/07 May 2023
#modelrailways
#scalemodel

Пікірлер: 35
@C2Vues-BricoTrain
@C2Vues-BricoTrain Жыл бұрын
Bonsoir, A mon avis, l'option 2 me paraît être la plus rationnelle pour une zone de travail. Bonne continuation. Cordialement. Fernando (France) ***************************$ Good evening, In my opinion, option 2 seems to me to be the most rational for a work area. Best wishes. Cordially. Fernando (France)
@dallasthomas9298
@dallasthomas9298 Жыл бұрын
Option 2 looks best to me
@little_britain
@little_britain Жыл бұрын
Definitely option 2, more running flexibility.
@PeachTube1968
@PeachTube1968 Жыл бұрын
Option 2 makes more sense to me...
@grahamallen1970
@grahamallen1970 Жыл бұрын
Your train set your decisions!
@albulastrasse3118
@albulastrasse3118 Жыл бұрын
Option 2 looks better, but I would say option 1 is more prototypical. For a small shed with a few roads such as this, there would be more likely to be fueling parallel to the storage roads. Also, there's no way I would think that complicated pointwork such as slips would be incorporated to a diesel shed - although my experience is ScR from the 80s onwards.
@gibbo675
@gibbo675 Жыл бұрын
Option 2, it will make life easier to operate if nothing else.
@AllSortsOfStuff58
@AllSortsOfStuff58 Жыл бұрын
Option 2 looks tidier...
@brucewoods9377
@brucewoods9377 Жыл бұрын
I like option 2
@leewakelin15
@leewakelin15 Жыл бұрын
Option 2 for me 👌
@petertate5741
@petertate5741 Жыл бұрын
Deffo option 2 👍
@the_failed_states
@the_failed_states Жыл бұрын
Option 2, but whenever I plan a railway, no matter what option I go with seems to be the least best.
@gordonbridges8261
@gordonbridges8261 Жыл бұрын
Option 2 looks better. I've had a similar dilemma trying to fit everything into the space available. Prototypical ness sometimes must take second place for aesthetic & practical. Also i think it will be more 'playable'. Love watching your videos. Thanks Wallsrail.
@stuartbailey2574
@stuartbailey2574 Жыл бұрын
Option 1 for me, looks more prototypical to my eye
@frananmar1
@frananmar1 Жыл бұрын
Option 2 , it gives you more scope for movements.
@SMModela
@SMModela Жыл бұрын
Option 2 .
@FormallyknownasE100
@FormallyknownasE100 Жыл бұрын
Option 2 is better operationally. That being said if there is any way a headshunt could be incorporated it could be hugely helpful!
@timsully8958
@timsully8958 Жыл бұрын
I think option 2 in principle is better as it allows a degree of flexibility and has a greater logic to it. I’d say though that from what I can see, option 1 looks better and neater. So I confess I’m undecided. What I would say is that if you could place a building between the entrance and exit roads it would make it look aesthetically better. I’d pop a hut in that vicinity for the shunters controlling the entrance and exit movements anyway in truth! But that’s just my opinion of course 😜
@richardsweeney197
@richardsweeney197 Жыл бұрын
I think option two separate arrivals and departure roads.
@thattadoomodelrailway8734
@thattadoomodelrailway8734 Жыл бұрын
Option 2 looks better
@TheJoyofSix
@TheJoyofSix Жыл бұрын
Single lead. The shed isn't big enough to justify separate roads; there are/were plenty of bigger sheds on Britain's railways that were single lead access.
@maestromanification
@maestromanification Жыл бұрын
Evening Nigel, I think option 2 is better but I would make both roads bi directional for flexibility. I've done something similar with my shed . If you want some pictures get my number off matt Smith. Cheers Russ
@1701_FyldeFlyer
@1701_FyldeFlyer Жыл бұрын
Single looks better to me.
@IrishModelRailway
@IrishModelRailway Жыл бұрын
Option 2 for me too ...
@paulhiggins1210
@paulhiggins1210 Жыл бұрын
Ask Dan Dan the signalman 😂😂😂
@Brinkly1000
@Brinkly1000 Жыл бұрын
I think the second option is the easier to operate. Takes the pressure off the choke point.
@maestromecanico597
@maestromecanico597 Жыл бұрын
Option 2. Rationale: When I did locomotive maintenance for a living you wanted the ability to lock a track out for safety. Option 2 appears to have the least likely chance for someone to run into your work area.
@daveoliver7590
@daveoliver7590 Жыл бұрын
Option 2 looks better..
@Cookie2k
@Cookie2k Жыл бұрын
Option 2 all the way
@ewoodrailway
@ewoodrailway Жыл бұрын
Option 2 all day long
@adventuresinmodelrailroading
@adventuresinmodelrailroading Жыл бұрын
My question is: What are you going after? A busy junction with constant arrivals and departures? Or are you looking for a sleepy way point that sees only 1 or two trains a day? If it is going to be busy, two tracks will keep arrivals and departures from fouling each other. One track will suffice for a sleepy little junction in the middle of nowhere.
@Drunkpilot
@Drunkpilot Жыл бұрын
Option 2 looks more operationally feasible
@robturner3117
@robturner3117 Жыл бұрын
Option 2 for me, that smalls8ding on option doesnt look right to me
@TanVasinTrains
@TanVasinTrains Жыл бұрын
Wallsrail junction is taking 100 years
@AllSortsOfStuff58
@AllSortsOfStuff58 Жыл бұрын
Got to have it right...
Shed 2
6:13
Wallsrail
Рет қаралды 3,7 М.
Derailments - common causes
8:48
Wallsrail
Рет қаралды 18 М.
A little girl was shy at her first ballet lesson #shorts
00:35
Fabiosa Animated
Рет қаралды 14 МЛН
Slow motion boy #shorts by Tsuriki Show
00:14
Tsuriki Show
Рет қаралды 9 МЛН
Smart Sigma Kid #funny #sigma #comedy
00:40
CRAZY GREAPA
Рет қаралды 8 МЛН
Double Stacked Pizza @Lionfield @ChefRush
00:33
albert_cancook
Рет қаралды 98 МЛН
Support Your Local Model Shop: The Locoshed Manchester
31:30
Well Chuffed Railways
Рет қаралды 34 М.
LMS Inspection Saloon MTK Kit
11:41
Wallsrail
Рет қаралды 3,7 М.
Don't let this happen to you!
6:30
St Blazey Model World
Рет қаралды 4,9 М.
Destroying Lego Towers
15:48
Brick Technology
Рет қаралды 1,1 МЛН
Customer States Compilation (Best of May & June 2024) | Just Rolled In
13:42
Australian Railways Are NUTS!
19:27
Southern Plains Railfan
Рет қаралды 766 М.
Leefield & Ashpeth 16 - Installing a Kato Turntable
10:39
Neil Oldie
Рет қаралды 26 М.
A Trip to Deansgate
26:14
LNWR Crook Street
Рет қаралды 6 М.
New Junction - Under  Closer Inspection: Dapol track cleaning wagon
23:38
Suburban Coach Conversion diagram 313 CL (Composite Lavatory)
14:03
A little girl was shy at her first ballet lesson #shorts
00:35
Fabiosa Animated
Рет қаралды 14 МЛН