Taking way too long to complete! 2031 until Bacoor? The project was launched in 2015.. People have been waiting their entire lives for this project. Many of the now seniors might not even be alive to see its completion. Indonesia put up around 800 km of rail tracks in the 8 years it has taken LRTA to complete just Phase 1 of this measly 12km project... 16 years to complete?? that's nothing to celebrate or be proud of..
@anonymoustvmedia3 ай бұрын
Congrats Paranaque and soon on Cavite! Those 2 places ease the traffic in that area.
@Lohn_Ad3 ай бұрын
Bakit bago pa mag pasko buksan na agad yan para sa ekonomiya ng bansa❤
@Lohn_Ad3 ай бұрын
Tama po b ung narinig ko 2032 pa ung phase2 OMG 😂😅
@noelgarcia80233 ай бұрын
2031 daw po yung phase 2. OMG talaga
@Lohn_Ad3 ай бұрын
@@noelgarcia8023 good luck on GDP growth
@Yeah4Life3 ай бұрын
Pwede ba akong maki-OMG kahit di naman ako apektado, taga-Mindanao po ako!
@anonymoustvmedia3 ай бұрын
Antagal pa, mauuna pa talaga mag open ang partial metro manila subway at mga stations sa Marikina at Pasig via MRT 7 spur line at MRT 4
@paulnicolaparua3003 ай бұрын
Nakakahiya ang bansa natin kung ganitong katagal bago matapos ang mga importanteng proyekto gayan ng tren.
@zinfradaily11473 ай бұрын
Sana meron din mrt going ptx para tipid ng incovenient talaga
@peterangelod.cardenas82203 ай бұрын
connected naman po ang LRT sa PITX! Pwede po sa PITX then EDSA BRT hehe
@jimboy-dy7bv2 ай бұрын
Myron po, papuntang PITX..
@zinfradaily11472 ай бұрын
@@jimboy-dy7bv pag galen po kasi mrt edsa need mo pa lumipat ng lrt sa taff para makapunta ng pitxt. Karamihan sa ng wowork is nasa along edsa ung sakay, pg na edsa carousel ka naman traffic pag dating ng pasay at hassle pa.
@sportsnetwork35093 ай бұрын
Phase 2 pa
@blackholesurfer696928 күн бұрын
"Government Project Always Delay" *(Gov't Project Do NOT Delay) lol
@user-lg7vn1ny9h2 ай бұрын
Till saan b sa caviti?
@Ronald-iu2cb2 ай бұрын
Hanggang niog lang
@JerryLuna-l3fАй бұрын
Sna ndi mn maganda ang exterior pagandahin nmn ang interior ng mga station..
@tenny_tenten3 ай бұрын
Kung tutuusin mukhang worst case scenario ang binibigay ng LRMC/DOTr, baka mas maaga pa yan ibukas kagaya noong tumakbo ang mga Gen 4 trains na reportedly sa Disyembre pero sa Hulyo lang pala naging operational
@jerrycarney41062 ай бұрын
2031 ang palugit para makalimutan ng mga tao na hanggan cavite dapat yan😅
@PherDones-xt2oo3 ай бұрын
PARANAQUE EXTENTION D CAVITE !! LOKO NYO KAMI EH DOTR MABUHAY KAYO SA PATINGI TINGI ??
@johnreton6963 ай бұрын
Panget ng design ng stations pang 80s pa din nubayan
@reydeanlasru59173 ай бұрын
As usual😂
@BenzRio21 күн бұрын
Kawawang Pilipinas walang sariling Bulletrain.😏
@FixMoto3 ай бұрын
After 38 years.
@louminamilana52723 ай бұрын
LRTA CLASS 14000 CRRC SIEMENS 5TH GENERATION TRAIN Doors: 5 Articulated Cars: 3 Similar To 1000 Class LED Destination Boards: 3 Air Conditioning Units: 3 LRV Fleets: 168 Trainsets: 56 Traction: IGBT-VVVF (SIEMENS EMU-BLE) Speed: 60Kph Bogies: 2 Jacob Bogies: 2 Gangways: 2 Pantograph: 1 Cars: 3 Axle: 8 Seats: 13 Wheel Chair Sign: 2 Handrails Doors: 16 Handrail Ceilings: 18 Handrail Handles: 108 Interior Route Maps: 2 Car Body: Stainless Steel Exterior Rectangle Red Lights: 10 Interior Circle Yellow Lights: 10 DOTR & LRTA Logos Exteriors: 4 DOTR & LRTA Logos Front & Rear: 2 Border Lines Color: Red Build At China Manufacturer: CRRC Siemens
@spongeotakuph3 ай бұрын
Werer did u get that? We need the primary source kasi 2ndary sources are pretty tricky in terms of validity.
@darkboy68182 ай бұрын
1 gen train 2-3 bagon gagawin daw 4 na bagon
@user-iy5dg3eb6z3 ай бұрын
D nga 22 o byan o joke lng
@balongride31693 ай бұрын
Tatak Aquino 👏👏😊💕
@FixMoto3 ай бұрын
Tatak pangako ni Aquino na hindi natupad hahaha
@eegt6283 ай бұрын
tatak delayed projects ng mga Aquino
@Paooo943 ай бұрын
Wag mo na lagyan ng presidente haha jica yan hahaha funded ng japan kahit sinong presidente pa yan iaaward talaga ng japan yan