Please: do you place the 2nd short track after the crossing or behind it?
@NicolaasWillemen10 ай бұрын
=can you make a version of this crossing that can be controlled by cs3 only. So with a decoder in it ? Or can i adapt this, my layout tis not big enough to get it working correct with contact rails. And on both sides there are turnouts.
@JimPerkins-md2qx Жыл бұрын
I have a lot of M Track. I'm starting a layout using a starter Digital Set. Can I still us my M track?
@thetrainloverdk Жыл бұрын
Yes you can
@paulbayne7742 жыл бұрын
Is it the same process for cutting the track on Z scale?
@carstenmoller22484 ай бұрын
No, because Z track is 2 rails, not 3 rail like Märklin