Manufacturing Work Cell Optimization: Design, Layout and Cycle Time Analysis

  Рет қаралды 149,868

Ian Johnson

Ian Johnson

12 жыл бұрын

www.driveyoursuccess.com This video provides insight into the three essentials of manufacturing work cell optimization, design & layout

Пікірлер: 53
@Driveyoursuccess
@Driveyoursuccess 11 жыл бұрын
Thank you very much for your feedback. If you have any topics you would like me to look into, just send me a quick email. I am always looking for new and interesting things to discuss.
@Bishop6841
@Bishop6841 4 жыл бұрын
How can I contact you?
@Jasont62
@Jasont62 8 жыл бұрын
Ian - great job, loving you're videos, please keep making them, really helpful.
@israbose89
@israbose89 11 жыл бұрын
You made to remember me which are important rules about to improve processes because we sometimes think about taking time cycle with cronometer and we don't consider what's the priotity about improve. Greetings from Mexico. I hope you make videos about more topics about lean manufacturing: line balancing, SMED, poka-yoke, Kan-Ban, VSM.
@orlandojonesphotography
@orlandojonesphotography 6 жыл бұрын
Thank you for sharing, much appreciated.
@Driveyoursuccess
@Driveyoursuccess 6 жыл бұрын
Thanks!
@AakashSawant001
@AakashSawant001 6 жыл бұрын
amazing thank you sir for sharing your knowledge
@yaniyani1234
@yaniyani1234 11 жыл бұрын
Great explanation! Make more videos, industrial engineer students appreciate it. Thanks!
@thelaw3536
@thelaw3536 7 жыл бұрын
Great video
@user-st5ui7vr5n
@user-st5ui7vr5n Ай бұрын
Thanks, Your videos are so informative. Can you put out a video on Machine hour rate calculation for a CNC shop?
@XaviBlaster
@XaviBlaster 5 жыл бұрын
Excellently explained, thanks
@beoptimistic5853
@beoptimistic5853 3 жыл бұрын
kzbin.info/www/bejne/joGmmHqKbqefqLM👍👍👍💐
@kingschannel8105
@kingschannel8105 5 жыл бұрын
Very well explained video, Ian! You’re an incredible instructor!!!
@Driveyoursuccess
@Driveyoursuccess 5 жыл бұрын
Thank you. I really appreciate that feedback.
@kingschannel8105
@kingschannel8105 5 жыл бұрын
You’re welcome! Ian!
@singhanil007
@singhanil007 5 жыл бұрын
Nicely explained Ion .. grt job would love to learn Quality tools if possible
@beoptimistic5853
@beoptimistic5853 3 жыл бұрын
https: //kzbin.info/www/bejne/joGmmHqKbqd8qLM👍👍👍💐
@carlosib4521
@carlosib4521 5 жыл бұрын
How do you quantify the loss time ?? How do u know those down time I guess you need to quantify by Good pieces ...
@ManufacturingAmerica1
@ManufacturingAmerica1 8 жыл бұрын
Minimize and simplify are the easy parts. Having enough room in shops for the functionality portion can be an issue, as most shops square footage is barley enough. At least in the northeast, where real estate costs are high.
@Driveyoursuccess
@Driveyoursuccess 8 жыл бұрын
Great point. To be honest with you, a lot of the stuff looks great on paper. But, there is so much involved in optimization that at the end of the day it really comes down to how well trained your employees are.
@ManufacturingAmerica1
@ManufacturingAmerica1 8 жыл бұрын
Agree
@ratapia7812
@ratapia7812 7 жыл бұрын
Good point!! and let me tell you I want to convert a traditional line to lean line, but I had some doubt about what kind of training I need to provide to team members (operators), in what way I can change their thoughts about share operations, would you please share knowledge about that...
@zeglash
@zeglash 7 жыл бұрын
Would it be possible to make a video addressing how to adapt lean manufacturing principles to high mix low volume environments?
@Driveyoursuccess
@Driveyoursuccess 7 жыл бұрын
Hi Zack - yes - I will do that - I worked in such an environment in Satcom - we had to be as lead as possible - not easy with a vast product line.
@AdventureSworn
@AdventureSworn 8 жыл бұрын
Excellent
@Driveyoursuccess
@Driveyoursuccess 8 жыл бұрын
+Adventure Sworn Thanks a bunch.
@dullvoicereader
@dullvoicereader Жыл бұрын
Great video, Ian. Have you ever encountered the S-shaped cell in practice? I am having a hard time imagining it having a benefit over a double-U-shaped cell unless you're working around fixed obstacles. Can you inform me of the potential unique benefits of that layout?
@Driveyoursuccess
@Driveyoursuccess Жыл бұрын
Hi Brian - I have not seen many - but most of the ones I've come across or used were because of a pillar, post, or other obstruction that cannot be moved. There are applications where the S-Shaped Cell works very efficiently, but it's sometimes industry-specific.
@l_t_truth_seeker
@l_t_truth_seeker 3 жыл бұрын
Thank You Sir
@beoptimistic5853
@beoptimistic5853 3 жыл бұрын
kzbin.info/www/bejne/joGmmHqKbqefqLM👍👍👍👍💐
@linkxue201
@linkxue201 Жыл бұрын
Should the productivity you mentioned and calculated in the video considered as availability?
@sofia9127
@sofia9127 4 жыл бұрын
Hi there Ian, Do you mind helping me figure out how the design of process layout and service layout are similar?
@beoptimistic5853
@beoptimistic5853 3 жыл бұрын
kzbin.info/www/bejne/joGmmHqKbqefqLM👍👍💐
@adeliahjacobs
@adeliahjacobs 4 жыл бұрын
What would be the best layout for a production floor with no continuous lines...no two jobs are the same / all orders are custom designed
@Driveyoursuccess
@Driveyoursuccess 4 жыл бұрын
Oooh - Levi - that's a great question. I should do a video on that. Ultimately, even when doing customized work, there has to be some basic commonality when manufacturing a product - meaning that there must be some basic operations. You just gave me a great idea for a video.
@comicsans6330
@comicsans6330 8 жыл бұрын
C.C.O.M.W.I.P. understand what that means. the elimination of MUDA give you what this gentlemen is generalizing on. This is a slimmed down version of the Toyota Production System. Keep up the good work.
@Driveyoursuccess
@Driveyoursuccess 8 жыл бұрын
+Comic Sans I think you'll find that 90% of the viewers here aren't aware of MUDA and the seven wastes. The reality is that not every company has linear and constant demand for the same products day-in-day-out. Automotive manufacturers have 5-8 models of cars and make millions of the same car yearly - from a fixed bill of materials. However, the vast majority of companies do not have this luxury - they deal with infrequent demand, cyclical markets and floating product lines. Waste is waste - and it's baby steps that matter - not a full on adoption of TPS when it's not viable, needed or applicable for 90% of the companies out there.
@comicsans6330
@comicsans6330 8 жыл бұрын
+Ian Johnson this is true, to qualify where i come from i work for Toyota, Lexus in particular and have been studying and using the TPS system in real time for quite a few years. I would teach it if Toyota didn't treat me so well.. what you are briefly over viewing above there actually a tool called Standardize Process Chart which calibrates the process to its optimal efficiency. Its really a simple but powerful tool -ergonomically too. interesting stuff. after designing lines at work i feel as though i could walk into any company and instantly save them 10's of thousands upon thousands within the first months. Also reducing WSIB or safety/med visits efficiency and ergo go hand in hand. It blows my mind engineers and industry specialists have no understanding of this. It doesn't matter if you're a 5 billion a qtr or 50k a year profit its all the same WASTE IS WASTE. Accomplishing as much as possible by doing as little a possible, or the least amount of effort. (S.M.A.R.T.) Im sure you know this very well. I will say though I worked for a guy pre Toyota/Lexus who taught the TPS system but never ever actually worked for toyota or learned it and used it everyday from GPC a consultant, a real "know it all" he was brought in to "save the company" but after having first rate experience of actually using and understanding the mindset, that boy was full of it, way off in his thoughts and understanding etc. Keep up the good work though. Stay focused on the cores. theres 1000's of "ideas and concepts" none have been refined and stayed effective as the TPS mindset. Big business or small, Production or Office. I mean no slant to you btw. i will edit my first response seems a little harsh
@Driveyoursuccess
@Driveyoursuccess 8 жыл бұрын
+Comic Sans Don't worry - I didn't take offense. It's just that far too many companies are intimidated by lean approaches and strategies. They think all the calculations, analytics, statistics and methodologies can't apply to them because of the market they operate in and the products they sell. Most just need to get started and not worry about full adoption of all possible approaches. Taking action is what matters. Take care.
@maximilianshakal7936
@maximilianshakal7936 7 жыл бұрын
As an intern, the industrial engineer I worked with said the exact same thing - the company will always insist that their market is "not applicable". Frustrating to get the buy-in needed!
@Cokoladni
@Cokoladni 6 жыл бұрын
Hey can u suggest some books on this topic (production line design)?
@Driveyoursuccess
@Driveyoursuccess 6 жыл бұрын
Hi - look up lean manufacturing - there are plenty of excellent resources. I would start with APICS - American Productivity and Inventory Control Society.
@Mohdsalman-qi1zb
@Mohdsalman-qi1zb 3 жыл бұрын
Minimize transit time. Simplify work flow. Functionality.
@jerryocrow1
@jerryocrow1 4 жыл бұрын
Thank you But, repetition, repetition, repetition is like maximizing transit time between each idea instead of minimizing transition time.
@beoptimistic5853
@beoptimistic5853 3 жыл бұрын
kzbin.info/www/bejne/joGmmHqKbqefqLM👍👍👍💐
@yudhistiraperwirakristiant1294
@yudhistiraperwirakristiant1294 4 жыл бұрын
Thanks for information f👌 btw siapa yang disini gara gara tugas hayo
@IAN-ek5ni
@IAN-ek5ni 4 жыл бұрын
aku cuk
@beoptimistic5853
@beoptimistic5853 3 жыл бұрын
kzbin.info/www/bejne/joGmmHqKbqefqLM👍👍👍💐
@dmoreno2092
@dmoreno2092 8 жыл бұрын
He made a mistake calculating the productivity. Its a 8hr shift the lunch-break hour doesnt count. Eg 7am pucn in 11am punch out for lunch 12pm punch in and 4pm punch out
@Jallandhara
@Jallandhara 9 ай бұрын
I'm not picking up how 204 units emerge from the cell in 255 minutes if the flow of the product through the cell is dependent on the accumulated efforts of all steps prior to the last. The last workstation of the cell is performing its task at a rate of 5. 5 minutes is that workstation's cycle time. Only 51 parts are leaving that cell in 255 minutes.
@RCasey100
@RCasey100 9 ай бұрын
Correct - given the arrows he implies it is a serial process with 4 stations, however he then explains it as being a process with 4 stations working in parallel.
Manufacturer Price Sheet: Material, Labor, Overhead & Profit
7:42
Modified Product Layout and Assembly Line Balancing Example
11:35
Ramesh Soni
Рет қаралды 249 М.
Stay on your way 🛤️✨
00:34
A4
Рет қаралды 8 МЛН
Slow motion boy #shorts by Tsuriki Show
00:14
Tsuriki Show
Рет қаралды 8 МЛН
A clash of kindness and indifference #shorts
00:17
Fabiosa Best Lifehacks
Рет қаралды 119 МЛН
Kan Ban Manufacturing Layout: Lean Principles
7:05
Ian Johnson
Рет қаралды 58 М.
Takt Time, Cycle Time, Lead Time
13:50
OpsExcellence
Рет қаралды 606 М.
Lean Manufacturing - Lean Factory Tour - FastCap
13:41
FastCapLLC
Рет қаралды 768 М.
How to design a Lean Layout/Obeyaka? The Lean Manufacturing Guide
15:21
Lean Manufacturing: MIND-BLOWING Factory Tour! (Behind The Scenes)
35:19
Ryan Tierney - Lean Made Simple
Рет қаралды 79 М.
10 Rules of Lean Assembly Cell Design
4:15
Worksmart Systems
Рет қаралды 134 М.
BSS042 3 Basic Layout Types
25:44
Bilal Qayum
Рет қаралды 4,2 М.
Stay on your way 🛤️✨
00:34
A4
Рет қаралды 8 МЛН