No video

Maryland's Purple Line Reaches Major Milestone as LRVs Arrive

  Рет қаралды 20,572

Maryland Purple Line

Maryland Purple Line

Күн бұрын

A pivotal moment for the Purple Line as the latest light rail vehicle (LRV) departs from New York and is securely transported to the Operations and Maintenance Facility (OMF) on Veterans Highway using specialized trailers. This cutting-edge facility will accommodate the Purple Line Operational Control Center, equipped with advanced train control and monitoring systems.
Key Features of the LRVs
Length: 140 feet
Seating Capacity: 80 Total Passengers
Capacity: 400 people
Storage: 8 bikes
The Purple Line will extend from New Carrollton in Prince George’s County to Bethesda in Montgomery County, providing direct connections to the Metro Red, Green and Orange lines at Bethesda, Silver Spring, College Park, and New Carrollton, as well as links to MARC, Amtrak and local bus services.
Stay tuned for more exciting updates and milestones in the Purple Line's progress! Building momentum, one track at a time. #PurpleLineProgress #ConnectingCommunities #MDOTcares

Пікірлер: 46
@buildintotrains
@buildintotrains Ай бұрын
lovely to see some physical rolling stock - now onsite!
@295g295
@295g295 Ай бұрын
1:44 - hmm .. . onsite -- where is this?
@Domthe2st
@Domthe2st 19 күн бұрын
Glenridge in Maryland the railcars came from nyc ​@295g295
@user-ut3hz1nz8r
@user-ut3hz1nz8r Ай бұрын
WOW..... The day has finally come!! FYI - Most if NOT all of the credit is owed to the tireless work of those during the re-solicitation and with the DB2 contractor afterward AND who are NO longer working on the PL program for the PMO because they were cast aside by the poor decisions of multiple TSO & MTA Pinheads who either acted alone or were directed to by the Governor's Office to remove those staff, to Mark the territory on behalf of the new administration. You know who you are and should be recognized!!👍💪🤜 Thank you for being so dedicated to doing a GREAT job!😊
@Seltyk
@Seltyk Ай бұрын
There's something uniquely funny about transporting a railcar by truck across an interstate highway.
@295g295
@295g295 Ай бұрын
0:33 - Yes it is sad that new rail-vehicles are delivered by road-truck, and not over the railways. There are rules for things running on the railroad -- new and untested.
@SandBoxJohn
@SandBoxJohn Ай бұрын
@@295g295 The special handling requirements make it highly expensive as they would need to shipped loaded aboard flatcars. They can not be moved on their wheel on the common carrier railroad network because their limited buffer strength.
@moroteseoinage
@moroteseoinage Ай бұрын
Yeah wtf
@icosthop9998
@icosthop9998 18 күн бұрын
Seems like another *"**#Ultra_STUPiD**"* law given to the world via idiot Politicians. 🤦🏼
@TheRandCrews
@TheRandCrews Ай бұрын
ooh CAF LRVs! nice Calgary in Canada also slated to get the same vehicles too for their Green line 🤝
@teh5thh
@teh5thh 11 күн бұрын
I for one speak for all of us Montgomery county residents when I say TRAINS TRAINS TRAINS
@christopherjackson2629
@christopherjackson2629 10 күн бұрын
Speak for yourself do not speak for everybody in Montgomery County
@NikonF5user
@NikonF5user 13 күн бұрын
I foolishly was unaware that the purple line is separate from Metro. Hoping they at least coordinate...
@purplelinemd
@purplelinemd 11 күн бұрын
yes! there will be transit hubs providing direct connections to the Metro Red, Green and Orange lines at Bethesda, Silver Spring, College Park, and New Carrollton, as well as links to MARC, Amtrak and local bus services.
@CrabMan2539
@CrabMan2539 Ай бұрын
Not sure if questions are answered here or not but is there any plans between now and 2027 when the line opens for people to be able to explore these light rail vehicles? Like a day where people can come and see the inside and get a feel of what they're like in person.
@sammymarrco47
@sammymarrco47 Ай бұрын
Yes, love to see that, like when Wmata put the 8ks on the mall in April.
@2002altima
@2002altima 6 күн бұрын
Let's hurry up and get this done. I'm sick and tired of driving through University boulevard, and Riverdale rd with all this traffic backed up with all this construction work.
@safuu202
@safuu202 Ай бұрын
Make sure these “new” cars are actually upgraded and have LCD (NOT LED) screens and digital wayfinding before you put them into service. I guarantee these things were designed and built in the 2010s. Imagine how out of date they’ll be by 2027.
@currytigre
@currytigre Ай бұрын
Very excited, just wish the trains didn't look so dated. That design is straight out of 2010.
@cooltwittertag
@cooltwittertag Ай бұрын
but why do they look so outdated? Surely you couldve gone for something nicer like muni?
@295g295
@295g295 Ай бұрын
1:28 -- What road-bridge is this?
@ainonainpg3d799
@ainonainpg3d799 Ай бұрын
What country is that?
@sbanner428
@sbanner428 Ай бұрын
Vermont
@ainonainpg3d799
@ainonainpg3d799 Ай бұрын
@@sbanner428 is that in france? Pls tell me the country
@dyarous
@dyarous Ай бұрын
@@ainonainpg3d799usa bruh
@ainonainpg3d799
@ainonainpg3d799 Ай бұрын
@@dyarous then why the f doesn’t he say usa but some random fcking village name. Nobody knows that sh!t But thanks for telling me
@GobbiExists
@GobbiExists Ай бұрын
It’s not the state of Vermont, it’s in the state of Maryland, where it will be built to connect many Washington DC metro lines in the suburbs, as its metro is very radial and it desperately needs a East-West connector line in the north or a loop line in general.
@christopherjackson6149
@christopherjackson6149 Ай бұрын
Who is going to operate this train? WMATA?
@christopherjackson6149
@christopherjackson6149 Ай бұрын
@marcushag8641 MTA is going to build division and bring employee's vs contract it out??? That's unbelievable.
@grahamcracker659
@grahamcracker659 16 күн бұрын
this is very scare, my cat sad
@mthompsondc
@mthompsondc Ай бұрын
Hard to believe this is posted in such low-rez.
@benjamincolumbus
@benjamincolumbus Ай бұрын
1080p not good enough?
@mthompsondc
@mthompsondc Ай бұрын
@@benjamincolumbus It wasn't 1080p earlier today, but looks better now!
@stephenshaw7593
@stephenshaw7593 Ай бұрын
Why not save on fuel and deliver them by train? This just furthers the perception that trains are a gimmick that rely on trucks
@car_tar3882
@car_tar3882 Ай бұрын
Oh no! The trains that will spend likely upwards of 30 years traveling near emission free went on a truck once?!?!?
@andy41417
@andy41417 Ай бұрын
@@car_tar3882Hydro dams on Susquehanna powered Amtrak NE corridor. Wonder what will generate electric for these? Same issue with all EVs. Saw a Tesla with WV plates COALPWR.
@claytonbrown7100
@claytonbrown7100 Ай бұрын
Most likely cheaper and less wear-and-tear than shipping by rail plus you’re assuming railroad tracks are readily accessible at the pick-up and delivery point.
@illhaveawtrplz
@illhaveawtrplz Ай бұрын
@@claytonbrown7100 Right, we don't have a robust manufacturing sector built around rail anymore, so it's likely that the company that won the bid to build the stock just didn't have a viable rail connection to the delivery site. It's a chicken and egg problem, but you have to get more trains out there to get the economy of scale working in their favor again.
@icosthop9998
@icosthop9998 18 күн бұрын
​@@illhaveawtrplz best answer 👍👏👏👏
@cjones3710
@cjones3710 Ай бұрын
We don't need this. There are homeless problems that need addressing, and CRIME issues too. So Moore pushes for another train. Not needed.
@newdirectionconsulting8744
@newdirectionconsulting8744 Ай бұрын
No we need this good job by Moore
@cjones3710
@cjones3710 Ай бұрын
@@newdirectionconsulting8744 Not sure why. But I have homeless junkies and social services that does nothing.
@Zzzz...7
@Zzzz...7 Ай бұрын
Yay! My tax money 💰 🤑 💸 at work! _Way-way_ over budget (estimated final cost of *_10 billion, 4.4 billion_* over the original estimated cost of 5.6 billion dollars) and _way-way_ behind schedule (was _supposed_ to open in *2022* 😮)! Hooray! Now we just need to be patient and wait until (hopefully) winter time in 2027 for it to start opening up! Woo-hoo! Plus we got a new nice and shiny rail car! Wow! Now we just have to wait for the rails to put it on! Talk about Progress!
@illhaveawtrplz
@illhaveawtrplz Ай бұрын
It's Hogan's fault that this happened, not some inherent and mysterious flaw with public transport and government projects. He and his team let the contract with the construction company lapse knowing full well that it would cost more in the long run. I liked some things he did as governor but he really, really botched this one and left the taxpayers holding the bag.
Purple Line Progress Video Spring 2024
3:46
Maryland Purple Line
Рет қаралды 10 М.
He secretly changed this freeway sign, helped millions of drivers
9:30
МЕБЕЛЬ ВЫДАСТ СОТРУДНИКАМ ПОЛИЦИИ ТАБЕЛЬНУЮ МЕБЕЛЬ
00:20
GTA 5 vs GTA San Andreas Doctors🥼🚑
00:57
Xzit Thamer
Рет қаралды 25 МЛН
Caltrain’s NEW ELECTRIC Trains
18:29
Trains Are Awesome
Рет қаралды 62 М.
What's inside of the Gateway Arch? (St. Louis, Missouri)
15:36
Jared Owen
Рет қаралды 1,9 МЛН
WEIRDEST New Locomotive?
10:11
V12 Productions
Рет қаралды 261 М.
Underwater Constructions | How do Engineers Make Them?
9:16
Lesics
Рет қаралды 9 МЛН
All 50 STATES in AMERICA Ranked WORST to BEST
19:05
From Here to There
Рет қаралды 6 МЛН
Metro Board discusses rail expansion proposals | NBC4 Washington
2:23
NBC4 Washington
Рет қаралды 15 М.
Orbital Light Rail - the Hottest Trend in Transit?
12:45
RMTransit
Рет қаралды 120 М.
The Train Crash That Exposed Japan’s Toxic Work Culture
13:14
Worlds In Motion
Рет қаралды 2 МЛН
The Purple Line - LA's $9.5BN New Metro
8:41
The Impossible Build
Рет қаралды 297 М.
Why does DC have so much abandoned railway electrification?
25:52
Trains Are Awesome
Рет қаралды 76 М.