Meet Crossrail's giant tunnelling machines

  Рет қаралды 5,358,175

Crossrail Project

Crossrail Project

Күн бұрын

Crossrail will use eight tunnel boring machines (TBMs) to construct the new tunnels under London. These huge machines will work 24 hours a day beneath the streets of London, excavating large volumes of ground and erecting the concrete tunnel lining.
Each machine has a rotating cutter head at the front, and a series of trailers behind, housing all the mechanical and electrical equipment required for the excavation of material.
To construct the 42km of tunnel required for Crossrail the tunnel boring machines will undertake ten individual tunnel drives to construct the 6.2m diameter rail tunnels.
Each TBM weighs approximately 1000 tonnes and will be up to 140m in length with an external diameter of 7.1m. This allows for an inside tunnel diameter of 6.2m once the concrete tunnel segments are in place.
Each TBM will be operated by a 'tunnel gang' comprising of around twenty people - twelve people on the TBM itself and eight people working from the rear of the machine to above ground.
To find out more about our tunnel boring machines visit:
www.crossrail.c...
Video released in 2012

Пікірлер
How The Channel Tunnel Works
20:12
Practical Engineering
Рет қаралды 1,6 МЛН
Eppenberg SBB Railway Tunnel - From installation to the breakthrough
20:02
If people acted like cats 🙀😹 LeoNata family #shorts
00:22
LeoNata Family
Рет қаралды 23 МЛН
FOREVER BUNNY
00:14
Natan por Aí
Рет қаралды 31 МЛН
Large Diameter EPB Shield
13:08
Herrenknecht AG
Рет қаралды 111 М.
150 The Most Amazing Heavy Machinery In The World ▶ 100
31:58
Smart Tech
Рет қаралды 5 МЛН
How does Starlink Satellite Internet Work?📡☄🖥
28:09
Branch Education
Рет қаралды 7 МЛН
How Do You Steer a Drill Below The Earth?
14:53
Practical Engineering
Рет қаралды 4,2 МЛН
MEGA TUNNEL MACHINES - Drilling, Digging & Blasting | Full Documentary
48:48
WELT Documentary
Рет қаралды 1,7 МЛН
IT TOOK ME 3 YEARS TO DIG.......
2:30:35
colinfurze
Рет қаралды 22 МЛН