Heads Up: Between 15:00 and 17:15 I noticed a typo in the Zn squared equation, the first summation (furthest left) between n=1 to k, should be outside the first set of parenthesis, next to the 2/N term.
@xianaoW2 ай бұрын
Author, I recently read an article that sounds quite similar to what you discussed. Its title is NICER Timing of the X-ray Thermal Isolated Neutron Star RX J0806.4-4123. Could it be that you wrote it? Also, what software are you using? I'd like to learn it as well, as I’m currently a master’s student studying how to conduct pulsar timing. Incidentally, I’m also working with NICER data.
@nspace-cowboy2 ай бұрын
No, I didn't write that paper you are referencing. I'm using custom software I've written to do the timing work. All the data preparation/reduction was done with the tools in HEASoft and the cli pipeline wrappers I wrote and referenced in the video.