How much repetitions can i get out of it and what is its maintenance cost per sqf and how the bulk concrete structure will react in summers where temperature touches around 45°C in most areas of India??
@navdeeshbharati90875 жыл бұрын
Can u send the excel sheet?
@aakash55214 жыл бұрын
Labour analysis
@aakash55214 жыл бұрын
Mivan shuttering labour analysis
@aakash55214 жыл бұрын
Mivan shuttering labour analysis
@bhagirathipani23144 жыл бұрын
Very useful information. Main lacuna in the concept; No contractor can work with one set of materials. Hence, investment will be doubled.
@jagritchandna5205 жыл бұрын
Very nice video and good explanation for costing
@muhammedmohsin25932 жыл бұрын
Thanks for the great information
@Busyguy1119 Жыл бұрын
sir plzzzz reply, ye jo 543rs/sqm ka cost mila he usko 750 se multiply karna hoga final cost k liye ya fir 2100 se reply plzz
@pradipbhumbre7845 жыл бұрын
Sir Building area 1000 Sq fit how to calculate Required Carpenter and Fitter and slab completed up to 15 days..(Conventional slab) please sir share information...
@sujeetmahato25773 жыл бұрын
sir structure ka cost kya aata he each floor ka per sqft as per slab cover area basis
@civiltechlearn5 жыл бұрын
1.How to study the drawing sheet of Mivan shuttering work? 2.how to start the fixing way of shuttering work?/how to execute the work? 3.how to calculate the required shuttering formwark in Mivan construction work? 4. Responsibility of Mivan formwark as a site supervisor and a site engineer? Please sir tell me those point. Very helpful for us.
@FactualCivilEngineering5 жыл бұрын
Ok, i will upload soon
@navalmalpani76285 жыл бұрын
what is the costing difference between mivan and RCC ?
@harshvardhankamble77853 жыл бұрын
Steel used in conventional method and mivan system for square foot???
@miteshparmar20153 жыл бұрын
Narayan Bless 🙏 You
@rajarshibaksi51972 жыл бұрын
How to consider floorwise lifting in Rate Analysis
@anandjamdade91562 жыл бұрын
nice information Sir
@vikramjeetsingh10915 жыл бұрын
Thanks sir, apka sath mila kuch sikhne nd knowledge lene k liye , bhut acha km kr rahe hai aap... Sir mix design pe bhi bna dijiye...
@FactualCivilEngineering5 жыл бұрын
Already banaya hua h, video list main check karlo
@vikramjeetsingh10915 жыл бұрын
@@FactualCivilEngineering thnx sir..
@Yasir33145 жыл бұрын
Thank you for making this video
@sack3693 жыл бұрын
You can consider salvage value of aluform so that material cost will come down and rate will be more competitive. Although it's good information
Dear sir Your cost analysis is very helpful, but I have some doubt. Labour cost you have explained is RS 543,is it in sq.metre or in sq.ft. I want to know about sq.ft rate for labour work without material
@nitinarora46343 жыл бұрын
labour cost taken is 150 per sqm
@sharadtawde68464 жыл бұрын
Sir, nice concept.
@krmchary79422 жыл бұрын
Can we get this Excel copy
@MOHAMMADSAIF-nm9vd5 жыл бұрын
any reference for the point b). factor for formwork area?
@rupeshsurve003 жыл бұрын
nice video
@arthamwarshubham51174 жыл бұрын
Prepare a video on aluminium windows costing and their sections used in building please
@ggyasu63013 жыл бұрын
Ms material ka weight kese nikale Mivan shuttering me?
@niranjanarmani94034 жыл бұрын
Nice video. We require Mivan workers for Shuttering/Fitting and Concreting in PUNE. Reply asap
@sushantjadhav77663 жыл бұрын
Which is company
@pannagarajmk25703 жыл бұрын
Well explained. Good , thank you
@ashujain2065 жыл бұрын
Please explain Rate analysis for wooden table and pannel door .
@pareshpatil13364 жыл бұрын
Thank you for your support, Could you please share this working Excel file?
@ANKURKUMAR-me5uf4 жыл бұрын
Awesome yrr
@joydeepmitra235810 ай бұрын
Per sq ft labour rate share kijiye
@mohammed-ly1pp5 жыл бұрын
Hello, your work and effort is highly appreciated. can u please share this excel sheet download link that will be very useful for us. Thanks
@PhysicWorld98474 жыл бұрын
HELLO SIR PLEASE MAKE A VIDEO ON EARTHCRUST LAYER AND HOW TO FIND DIFFERENT LAYERS USED IN ROAD WORK LIKE BM BC WMM AND GSB QUANTITY LAYERS WISE AND THEIR RATE ANALYSIS BASED ON MARKET AND DSR .
@rathod31764 жыл бұрын
Best
@azamali36582 жыл бұрын
Sir how it is possible Rate analysis of plywood shuttering - 550 sqm Rate analysis of mivan shuttering- 543 sqm
@Busyguy1119 Жыл бұрын
no. of repetitions are more in mivan
@vss42883 жыл бұрын
Please post clear video.this table form see blurred.
@sadhanbala2224 жыл бұрын
How to become a foreman in mivan Construction line
@tejanagasai37004 жыл бұрын
How much quantity of shuttering can be completed in one day with one labour
@vimaldwivedi10943 жыл бұрын
In mivan shuttering 1carpenter 1helper completed in one day(8hours) = 7sqm to 8 SQM. Approx.
@Mixxeddtube3 жыл бұрын
how to calculate floor plate area? is it construction area or built up area (built up area which excludes- open terrace area, lift & lift lobby, staircase, club house, swimming pool) u should hv explained this 1st during start of your video.
@vivekjha42183 жыл бұрын
Mivan Shuttering ka labor charge 150/Sqmt? Mai mere project me aapko 700/Sqmt/BUA deta hu. Karoge?
@manojbist270Ай бұрын
I want this sheet
@sagargor97024 жыл бұрын
sir,nice vedio but please share pdf of same.
@sadhanbala2224 жыл бұрын
Foreman kase bane
@mrimpossible52464 жыл бұрын
Maimon sating Lines level ki videos banaya
@sumantchauhan16325 жыл бұрын
Area nikalana mivan setting k
@alammasroor16294 жыл бұрын
Air video thora detail me dinara se banaye kuchch samajh me aaya kuchch nahi aaya.
@rajnikanthrajnikanth34175 жыл бұрын
10000 sq.ft kitna Paisa lagta
@habeebmohi93124 жыл бұрын
If construction is in Hyderabad Call on this number 8977793062
@anillohan21263 жыл бұрын
Excel sheet pl
@nileshbhale39503 жыл бұрын
Send excel sheet
@innocenthumans37212 жыл бұрын
Clear nahin hua
@chetanmohadikar21174 жыл бұрын
Please Call
@ravikiranyadav13594 жыл бұрын
Hello, your work and effort is highly appreciated. can u please share this excel sheet download link that will be very useful for us. Thanks
@Mixxeddtube3 жыл бұрын
how to calculate floor plate area? is it construction area or built up area (built up area which excludes- open terrace area, lift & lift lobby, staircase, club house, swimming pool) u should hv explained this 1st during start of your video.