Model Railroad Layout Update Video 16

  Рет қаралды 57,820

The Bennett Model Railroad

The Bennett Model Railroad

Күн бұрын

Пікірлер: 83
@dennisvonkrallski4639
@dennisvonkrallski4639 4 жыл бұрын
I have watched every episode at least twice. I look forward to viewing each new episode... sometimes waiting is hard to handle. It is now times of isolation in the year 2020 and i hope you progress alot thru these times. I came back to watch these as a reminder of how far you have come. Exceptional build from then to now. Thank you for sharing this entire journey. We are all captivated. And surely impressed with the attention to detail.
@douglaskirk2543
@douglaskirk2543 6 жыл бұрын
Your complete rebuild of your layout is quite involved. Thank you for the Situations I will have to be aware of with mine. Still haven't gotten a place for my layout yet, still getting ideas for my planning. Thank you for your time and explainations, learning with every video I watch. Thank you for your service to us all.
@n-scaleunionpacificevansto6569
@n-scaleunionpacificevansto6569 9 жыл бұрын
Stephen, I've watched all of your video updates from 1 to 16, and I find myself hoping there will be more to come. I really enjoyed the videos and really appreciate your thorough explanation of the steps you have taken, or are taking, to build a beautiful model railroad. Although I model in N-scale, your work is a real inspiration for me. ...Roy Smith
@rpm750
@rpm750 9 жыл бұрын
Thank you for your military service!! Much appreciated! I built all my turnouts using a paper template from Fast Tracks but I did purchase their Stock Rail and Frog filling gigs. A must have if you're building your own.
@lionellance
@lionellance 8 жыл бұрын
Wow.. Great update ! Thanks for sharing and keep up the great work... Lance 🚂
@daviddurbin808
@daviddurbin808 9 жыл бұрын
Amazing layout! Love all the neatness and quality of work you put into it, it shows. You have a very keen eye for detail. Keep up the awesome job and looking forward to your next video!
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thank You!
@markduncan6690
@markduncan6690 9 жыл бұрын
Spectacular!!!!! The structure (mountains) is fantastic!!!
@csxmodeller1
@csxmodeller1 9 жыл бұрын
Really like what your doing with your layout, look forward to seeing more updates as you progress.
@roadjdr4678
@roadjdr4678 9 жыл бұрын
great layout you are doing a great job on it. Cant wait to see the long trains running on it
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thanks
@TRIGGERHAPPY45CAL
@TRIGGERHAPPY45CAL 9 жыл бұрын
Thanks for all the info and lay out ideals. That's going to same me a lot of time. Also it looks really great...
@Bruno.Trains
@Bruno.Trains 9 жыл бұрын
Absolutely fantastic!
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Glad you like the layout so far, thanks!
@FishplateFilms
@FishplateFilms 9 жыл бұрын
Nice work Stephen! Lots of work there and well built. Will check out your channel. Cheers Gregg
@davidbouwman4528
@davidbouwman4528 9 жыл бұрын
Great layout! Going to have some awesome operating sessions there i can tell already!
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Yea I think so too! Thanks for the comment!
@TheSteamChannel
@TheSteamChannel 9 жыл бұрын
Great video, I look forward to future updates. Your switches look beautiful!
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thank You!
@WickedRCAdventures
@WickedRCAdventures 9 жыл бұрын
Some dedication here. Nice work.
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thank You!
@BNSF9382
@BNSF9382 9 жыл бұрын
Great update! Love your work…
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thank You
@centraljerseyconrailinnsca5676
@centraljerseyconrailinnsca5676 9 жыл бұрын
Everything looks great, keep up the great work. Love the channel. As for an industry for the spot in the intermodal yard, how 'bout a truck to rail transfer area (bulk plastic or liquid asphalt). You could transfer plastic from hopper car to bulk hopper semi-trucks or liquid asphalt from tank cars to tanker semi-trucks. And it can be attached to the intermodal yard.
@rvooyen
@rvooyen 9 жыл бұрын
Following. Awesome stuff. Robert
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thanks!
@chrisshoulders4066
@chrisshoulders4066 9 жыл бұрын
Awesome layout, keep up the good work my friend.
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thanks, will do!
@tanzj
@tanzj 9 жыл бұрын
Nice layout and a great explanation of what you are doing.
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thank You
@Calvertfilm
@Calvertfilm 9 жыл бұрын
Great layout, and great excuse for chicken wings :-) Laurie
@SeaboardCentral
@SeaboardCentral 9 жыл бұрын
Hi! Just found your channel and subscribed. I'm an NS Locomotive Engineer and Railroad Modeler. Regarding your spur off your Intermodal Ramp track. Personally I'd leave it out because it is not prototypical. One of my pet peeves when looking at layouts is most like you said, most folks try to cram a track on every piece of vacant real estate they have. And leave out options for nice scenery elements to make the layout more interesting and plausible. With that being said, if you are intent on keeping it then my suggestion would be to use it for an Automotive vehicle unloading ramp. You have a nice set up. Love the Fast Track turnouts! Thanks for sharing! Tim
@robbennett1965
@robbennett1965 9 жыл бұрын
Thanks Tim, and appreciate the thoughts. I am still mulling it over...but as I think the more I am leaning towards leaving it out, as I agree it just wouldn't fit neatly. The temptation to add track is like a siren song- but...must....not...give in! Thanks for watching and be safe out on the real RR.
@vettebecker1
@vettebecker1 9 жыл бұрын
Nice setup. On the program track, to get more room can you take a strip of cork roadbed and break it in half to give an extra strip on the side of the yard pad? This way you should get the clearance your looking for and make your spur longer.An idea for the end of intermodal yard track, what about a car servicing facility of just use it to store empty well cars?
@GoViaorgohome
@GoViaorgohome 9 жыл бұрын
Hey Stephen happy new years. The layout looks great. I would love to see an Ethanol plant. You dont see them too often and they are one of my fav's. Once I move and Im able to expand then I hope to but mine to use.. Walthers has an Ethanol line. Great kits.
@daletrongale2606
@daletrongale2606 9 жыл бұрын
Stephen, I am a first time viewer of your layout and I must say what I see is very impressive so far. I am not sure what year this video was made (#16 update) but in it you mentioned adding an unplanned switch on the intermodal facility tracks and that you weren't sure what you would do with that spur. I am not an expert in the field of intermodal BUT, I did think of two options you might consider for that spur. 1 Is a spur for a set of engines (GP's or SD's 38's, 40's, 40-2's, etc) that would be used to shuttle the intermodal cars around the yard before, during and after loading. Option #2 would be a RIP track for intermodal cars. I am sure that those cars also suffer some sort of maintenance problems and this spur could be used for that purpose. Hope this helps in your decision making, IF it hasn't already been decided. Good to contact another Air Guard member (I am retired ID ANG-36years!). Keep the updates coming as they are very interesting. Dale
@Berubium
@Berubium 9 жыл бұрын
Great update. Your layout is coming along really nicely. I love that German Talent set; I was considering getting one myself as I had also been on one in Germany. There is even a North American prototype for those as Ottawa's transit system uses one. I'd like to get an undecorated one (not sure if they even do that) & custom paint it.
@jbkiddmv
@jbkiddmv 9 жыл бұрын
I think that you are doing a great job--track work neat! Electronics- I lose it-but enjoy you explaining it.
@SvenFrankModelbuilder
@SvenFrankModelbuilder 9 жыл бұрын
As an idea for the extra track in the intermodal yard. Train to Truck container unloading via Forklift truck instead the large overhead cranes. Kibri i think makes the large container forklifts. Cheers from germany.
@trainman0771
@trainman0771 9 жыл бұрын
On the extra switch, you have, and were asking about suggestions. That would make a nice RIP Track. Set up s I'm me TTX vehicles, maybe a small 4 post shed a little work area. Just a Thought. Very nice layout!
@garykcs5532
@garykcs5532 9 жыл бұрын
great job with this vid, cant wait to see more,,,,,i did sub you everything looks good
@MrLocomechanic
@MrLocomechanic 3 жыл бұрын
What thickness cork did you use and where did you get it? Did you buy it in rolls? Thanks
@timothyrr6222
@timothyrr6222 9 жыл бұрын
absolutely fascinating.
@MattVinnyShaw
@MattVinnyShaw 9 жыл бұрын
Hey Stephen, I think that it would be cool if you added a single track engine shed for a switching locomotive on that that siding you aren't sure what you are gonna put and would switch the intermodal yard.
@SeaToby11
@SeaToby11 9 жыл бұрын
I see you have one of those O Trains, commuter trains from Ottawa. They are very nice commuter trains.
@arthurhouston3
@arthurhouston3 9 жыл бұрын
Nice track work, sorry to see the not easy DCC.
@johnredinger5537
@johnredinger5537 9 жыл бұрын
How would you wire your signal bridge? I am planning on getting one for my HO layout. Would you wire it to the main bus? I run on digitrax DCC. Thanks. Great layout by the way!
@robbennett1965
@robbennett1965 9 жыл бұрын
It will be connected to the SMINI output- each signal head color (red/yellow/green) will be run back to the SMINI. The program will then "control" the signal by grounding (thus lighting) the appropriate LED for the indication called for, based on dispatcher settings, block occupancy, etc. The way we are doing it the signal system is totally separate from the DCC system. The signals are just individual LEDs, so there are many ways to control them.
@jeffwardlow4626
@jeffwardlow4626 4 жыл бұрын
I love your backgrounds where did you get them from?
@19scamps92
@19scamps92 9 жыл бұрын
Hello Mr Bennett 1. your videos are pretty cool! 2. i work for the Swiss federal railways, i noticed you bought an Re6/6 in green in one of your videos. The funny thing is i totaallyyy love US-railroads and you seem to be collect and like european stuff as well. if you ever have any question please write me and ask me! i would like to help you with european specially swiss railway stuff :)
@bearcatftball61
@bearcatftball61 9 жыл бұрын
That extra track in the intermodal yard could be used for coil cars.
@mhbpodnk
@mhbpodnk 9 жыл бұрын
really great job
@THEBENNETTRAILROAD
@THEBENNETTRAILROAD 9 жыл бұрын
Thanks
@duncanaitken6284
@duncanaitken6284 9 жыл бұрын
I don't know if you will get this idea, but I am watching all you videos from the start. I don't know if you have any in the State in your area but in the UK on my line in the TMD there is a wash station. You may be able to work this into your layout. This is the track that is to the left hand side of you main controller.
@tdluvs
@tdluvs 9 жыл бұрын
On the track you are asking for suggestions for you could do a transloading facility or a spot for bad orders to be fixed
@Mumbles19852007
@Mumbles19852007 5 жыл бұрын
How about a concrete powder plant? Short cars and a couple sidings.
@jlking8935
@jlking8935 9 жыл бұрын
Try to pick an industry to model from around your area and any rails also. I would use a faller car system also for the area due to all the space you have.
@gregoryharris4903
@gregoryharris4903 8 жыл бұрын
I'm starting a new layout 8x4 just a starter ive never seen anyone put power to it so I'm asking how do you connect power to the line from one side to the outher side without stopping halve way greg
@brocklanders6172
@brocklanders6172 8 жыл бұрын
Excellent craftsmanship. One thing; your backdrop looks like it may be out of scale.
@hudiksvallfranluften3729
@hudiksvallfranluften3729 9 жыл бұрын
Just a note, at 14 minutes, that's not a Swedish freight train, it's a Swiss freight train.
@robbennett1965
@robbennett1965 9 жыл бұрын
Hudiksvall från luften Oh my- you are correct and I apologize for my mistake. No disrespect intended for any of our Swiss or Swedish viewers!
@normanmaletta4218
@normanmaletta4218 7 жыл бұрын
How about a engine service facility for that extra space you have
@jonathanjones35
@jonathanjones35 9 жыл бұрын
Nice work. Question: How are you doing your signaling with EasyDCC? My understanding was that this couldn't be done. Or is it just that you can't use EasyDCC with a computer?
@robbennett1965
@robbennett1965 9 жыл бұрын
The signals will be independent of the EasyDCC system. They will be powered off the 5 volt bus, and the individual lines will go to the outputs of the SMINI. They will be controlled by the software. The EasyDCC can certainly be connected to a computer, and I am looking into this and the use of the JMRI Decoder Pro for setting CV's.
@jonathanjones35
@jonathanjones35 9 жыл бұрын
Rob Bennett That's great Rob, and thanks for your reply. My DCC system preference is EasyDCC, but from reading the chat lines and such I got the impression that it wasn't suitable for signaling or hooking up to a computer. But now I see that is not true. Thanks again and keep up your good work. The layout is looking really good. I am doing an N-scale switching layout based on the CNJ in Newark, NJ.
@trackspike64
@trackspike64 9 жыл бұрын
wow very nice so far whats your easy dcc system amps ....and are the turnouts number 8 and how long does it take to make one ...is it worth building them or buying them and can I buy the jigs in code 100 ?? I will be following your progress I live in greenbay wis Home of the foot ball team that lost the playoff game in 5 min LOLOL
@robbennett1965
@robbennett1965 9 жыл бұрын
Lets see...we have three boosters (three power districts) and each is rated up to 7 amps. Turnouts are #8, except for the programming track spur, the shelf in the workshop and those that will eventually be in the transformer factory. Buy vs. build is a personal choice- there is a substantial upfront investment in jigs and tooling, then all the time it takes to build. But you have more control over the final product. Buying certainly will get your track work done faster. Cost is likely higher for the build route, depending on how many jigs/tooling you buy. But, the more you build the cost per turnout decreases. I haven't calculated a "break-even" point, when the cost per turnout is the same for build vs. buy. And finally, you can get the jigs and tooling for Code 100. Too bad about the Packers- I was routing for them. To me Seattle didn't win that game, the Packers lost it.
@chrsmcwtrs
@chrsmcwtrs 9 жыл бұрын
can you help me out... at 1400 on this video you have some patterens of switches... where can i get a set of these.. who makes them?? thanks
@chrsmcwtrs
@chrsmcwtrs 9 жыл бұрын
chrsmcwtrs oh and where do you get your scratch build train material and who makes that product
@roadjdr4678
@roadjdr4678 9 жыл бұрын
srry i forgot to ask this on my last comment The track in your yard and intermodal yard is it code 100 if so have you thought for the intermodal yard use Shinohara Double-Guard Rail 39-3/8" 1m Long since you said you are paving over the track in the intermodal yard i don't know how you are doing it if you are using plaster then the Double-Guard Rail 39-3/8" 1m Long is perfect you just put a string between the rail and guard after your done plastering the road over the track just pull the string out and now you have clearance for your flanges on your cars and locomotive
@robbennett1965
@robbennett1965 9 жыл бұрын
The track is code 83, as is the entire layout actually. We will be "paving" over the track, not sure yet if we will go concrete or asphalt. Thank you for the comment- it is a good idea!
@BigDieselMan100
@BigDieselMan100 9 жыл бұрын
thank you very helpful, Hooah
@larrymonske8086
@larrymonske8086 7 жыл бұрын
Need edge barrier to save a train from falling on the floor rather have an accident or derail and keep it all on the layout.
@ItsNicholasPerry
@ItsNicholasPerry 9 жыл бұрын
You should consider using Triple Crown!
@robbennett1965
@robbennett1965 9 жыл бұрын
Roadrailers...I didn't even think of that. Very interesting. Let me mull that over- and thanks for the idea!
@jimbo57109
@jimbo57109 7 жыл бұрын
just found your channel nice layout thinking about your problem i would leave it too
@allanlevitt8761
@allanlevitt8761 Жыл бұрын
Do a lumber yard there
@larrymonske8086
@larrymonske8086 7 жыл бұрын
High speed rail................>>>>>
@larrymonske8086
@larrymonske8086 7 жыл бұрын
im gonna try a banked rail maybe 5 degrees if I can a dedicated hi speed rail.
@leiafoxtv
@leiafoxtv 9 жыл бұрын
I dont understand what you're saying
Model Railroad Layout Update Video 6
28:40
The Bennett Model Railroad
Рет қаралды 16 М.
Model Railroad Layout Update Video 18- PSX breaker, C/MRI Electronics, DCCOD Testing
19:52
VAMPIRE DESTROYED GIRL???? 😱
00:56
INO
Рет қаралды 8 МЛН
REAL 3D brush can draw grass Life Hack #shorts #lifehacks
00:42
MrMaximus
Рет қаралды 11 МЛН
What's in the clown's bag? #clown #angel #bunnypolice
00:19
超人夫妇
Рет қаралды 21 МЛН
Model Railroad Update 64- Layout Tour
29:44
The Bennett Model Railroad
Рет қаралды 51 М.
2014 "Maumee Express" cab ride entire layout
17:05
Tim Moran
Рет қаралды 11 М.
Model Railroad Layout Update Video 17- Power Supply, Wiring, Track updates
16:44
The Bennett Model Railroad
Рет қаралды 17 М.
Model Railroad Update Video 37 - C/MRI Hardware & Signal Installation
17:16
The Bennett Model Railroad
Рет қаралды 8 М.
Cab Ride around the Bennett Railroad
17:13
The Bennett Model Railroad
Рет қаралды 18 М.
Tour of Don Irace's Providence and Worcester HO Layout
20:52
IN FULL: Trump makes top Democrats laugh during charity dinner roast
28:16
Sky News Australia
Рет қаралды 1,8 МЛН
Model Railroad Layout Update Video 7
17:05
The Bennett Model Railroad
Рет қаралды 14 М.
Model Railroad Layout Update Video 9
18:11
The Bennett Model Railroad
Рет қаралды 13 М.
VAMPIRE DESTROYED GIRL???? 😱
00:56
INO
Рет қаралды 8 МЛН