No video

Model Railroad Update 103 - Building Hell Gate 1 (Progress Update)

  Рет қаралды 3,265

Otter Creek & Rio Grande

Otter Creek & Rio Grande

Күн бұрын

I enjoyed a long holiday weekend and did a few things on the layout like got started on Hell Gate and Hell Gate Pass. I promise I won't get bogged down operating the layout without moving forward!
You can support me at www.buymeacoff...
www.facebook.c...

Пікірлер: 40
@thecnwmondovilinepaulscota7304
@thecnwmondovilinepaulscota7304 Ай бұрын
Looking good, Dennis. Remember, layouts don't give us problems, only challenges and opportunities. Or something like that. 😀😀
@OtterCreek
@OtterCreek Ай бұрын
@@thecnwmondovilinepaulscota7304 True words Paul.
@jessenoklahoma
@jessenoklahoma Ай бұрын
Amazing layout, love the olden days appeal, thanks for sharing
@OtterCreek
@OtterCreek Ай бұрын
Thanks for watching! Great to see a fellow Oklahoman visit the channel!
@bernardc2553
@bernardc2553 Ай бұрын
Wow Dennis gezz your just kicking butt on your Masterpiece, Oh that overhang Id just cut furring strips to make the facial come out right hope to see you Saturday my friend awesome work as usual❤
@OtterCreek
@OtterCreek Ай бұрын
@@bernardc2553 Thanks Bernard, yeah I’m not worried about the fascia at this point I’ll get it figured out one way or another.
@bernardc2553
@bernardc2553 Ай бұрын
@OtterCreek Oh I sure you will buddy lol
@lynnmccurdythehdmmrc2561
@lynnmccurdythehdmmrc2561 Ай бұрын
Dennis, wife and family watching, while having dinner
@OtterCreek
@OtterCreek Ай бұрын
Thanks for tuning in Lynn!
@vincenthuying98
@vincenthuying98 Ай бұрын
Dear Dennis, on the bowing wall behind the time saver section; maybe it seems a bit more work, but why not change out those lateral stringers with ones which alleviate for the bow in the wall and make the front of your fascia completely straight. Think you’re right on track with the hell gate base lowered at about 2”. Just from the viewing angle in the vid such a lower approach will indeed help tie the sections together in a more smooth way. Love the temporary spline configuration, those curves definitely look great, can only imagine what they will look like when fully sceniced. Surely, such an alignment will create a great deal of visual interest. Looking forward to seeing your progress in next episodes. Cheerio
@OtterCreek
@OtterCreek Ай бұрын
Thanks Vincent! I'll figure out something for the fascia when the time comes to make the decision.
@stxhtic
@stxhtic Ай бұрын
Can't wait to play with the complete setup
@OtterCreek
@OtterCreek Ай бұрын
I'm glad you enjoyed the op sessions!
@derekalexander4030
@derekalexander4030 Ай бұрын
Hi Dennis, I’m sure that you built your benchwork square and the wall is forcing the problems at the front, so I think the easiest and most practical way to fix it is to shim the back where it meets the wall. The other issue could be resolved by joining the two types of track before it goes under the top. I’m sure that you will figure it out. The only suggestion you ever took of mine was the numbering of the towns to number the trains, so we know it will be thought through by you and you will come up with the perfect solution. I’m really enjoying your build and look forward to what you decide.
@OtterCreek
@OtterCreek Ай бұрын
Thanks Derek! Finding solutions on my own is one of my favorite part of the hobby. I've already built one of two dual gauge turnouts that will fix the routing of the standard gauge (I hope). I'll address the fascia when I'm ready. Shims seem the easiest solution.
@geraldstewart
@geraldstewart Ай бұрын
Dennis, couldn't you shim the benchwork under the timesaver from the wall with some 1X4 blocks, to give you space to make facia even? Great update video. Looking Great. Keeping a functional dual gauge track would be ideal. 3 rail looks so cool.
@OtterCreek
@OtterCreek Ай бұрын
I'm sure there will be more than one way to deal with it. I'll figure something out, I'd like it to appear seamless, but still be removable. Thanks Gerald!
@mysticrailroad
@mysticrailroad Ай бұрын
interesting vid Dennis, enjoyed it :)
@OtterCreek
@OtterCreek Ай бұрын
Glad you enjoyed it John!
@sierge1
@sierge1 Ай бұрын
Hi Dennis. Wow, I had to watch this video several times to fully digest your problem with the Timesaver and Hell Gate I agree with extending the dual gauge track because what you already have laid on the Timesaver does not look abandoned but in daily use. What really concerns me is the area between the Timesaver and Hell Gate. It is a little hard to see just how long that area is in the video but it appears to be somewhat short. I am concerned about how are you going to be able to do the scenery transition between them. Other wise another great video.😄
@OtterCreek
@OtterCreek Ай бұрын
There are so many options to consider. Scenery doesn't concern me at all. An option I didn't discuss is merging the two. I could connect both the narrow and standard with a turnout. (original track plan did this). Then peel the standard gauge off toward the wall with another turnout that's hidden. As I mentioned in the video, nothing I do there to keep the standard gauge as a usable option will be easy. Thanks Sierge
@sierge1
@sierge1 Ай бұрын
@@OtterCreek Dennis I believe what ever you come up with it will work.
@kyguy-s9x
@kyguy-s9x Ай бұрын
For the section of 3 rail your wanting to hide Instead of making a tumble why not build a fake tunnel portal out of some model wood or popsicle sticks and paint/weather them to make them look old and similar to an old mine entrance. Then to kinda of hide it add overgrown trees/brush and detail the tracks closer to the tunnel overgrown and in disuse
@OtterCreek
@OtterCreek Ай бұрын
I could do that. I will first see how easily I can continue the track as a staging yard which would be my preference if feasible. There are a few options I'm looking at with the three rail.
@BoxcarJerry
@BoxcarJerry Ай бұрын
Hey Dennis things are looking good. It would be nice if you did something to run your standard HO otherwise what would you do with them ?
@OtterCreek
@OtterCreek Ай бұрын
Exactly! Yeah, I’m working up a way to incorporate a couple of staging Tracks.
@lynnmccurdythehdmmrc2561
@lynnmccurdythehdmmrc2561 Ай бұрын
Battery isn’t dead yet, but soon
@OtterCreek
@OtterCreek Ай бұрын
Hope to see you in chat on Saturday!
@locolorenzo
@locolorenzo Ай бұрын
Hey Dennis, would it work to merge the low-line and the dual gauge before entering a single tunnel, and then split them again under the mountain? ..and change the narrative to suit?🤔 That way you could still have the dual gauge staging track(s) and a runaround track coming back from the same turntable, all under cover of the scenery - no one would ever know🤗 ('cause we wouldn't tell 'em!). . . . . . 🚂Lawrence?
@OtterCreek
@OtterCreek Ай бұрын
That is what my original track plan did. At one time I had a wye in this corner with dual gauge throughout and the standard gauge could turn on the wye. The size of the Silver gulch loops kinda ruined that idea. So yes, I have considered that and it is on the top of my list of things to think about as I deal with the various elements of this corner of the Layout. Every decision will effect other decision... so which do I make first??? LOL I love the problem solving aspect of the Hobby! Thanks Lawrence!
@locolorenzo
@locolorenzo Ай бұрын
@@OtterCreek Yes, gotta love it! We await your decision with 'bated breath (poetically speaking).
@OtterCreek
@OtterCreek Ай бұрын
@@locolorenzo Dual gauge turnouts loading….
@locolorenzo
@locolorenzo Ай бұрын
@@OtterCreek 😃👍❤🤗 Go Dennis!!!
@StephanWershoven
@StephanWershoven Ай бұрын
if the dual gauge start to go downhill just after the timesaver could it duck under the narrow gauge before getting to the far side of hell gate? guess it would be close but you at least don't need room for double stack containers. have the narrow gauge on a embankment and the dual gauge in front with the terrain sloping down could look nice
@OtterCreek
@OtterCreek Ай бұрын
That would be about a 4.5" drop of elevation in less than 8'. I don't think a 4.5% grade is a good idea. The whole staged train would mostly be on a grade, making uncoupling an adventure. Thanks Stephan, I'll work out what I'm going to do when I'm ready.
@StephanWershoven
@StephanWershoven Ай бұрын
@@OtterCreek yeah, 4.5% is to steep
@OtterCreek
@OtterCreek Ай бұрын
Dual gauge turnouts loading….
@StephanWershoven
@StephanWershoven Ай бұрын
@@OtterCreek just had another idea can the staging for the dual / standard gauge fit on the other side of the timesaver ? then you could model the dualgauge track towards hell gate as under construction would give a nice scene with some ties stacked up, some rail pieces ready and maybe construction of the tunnel started but only a few feet into the hill
@tczephyr3665
@tczephyr3665 Ай бұрын
You have every woodworking tool known to mankind. Why couldn’t you plane the board down flush at the offending end?
@OtterCreek
@OtterCreek Ай бұрын
Don't think there would be much of a board left after that. I'd be more inclined to shim out the stringer on the wall or at the fascia. No worries, I'll work something out. Thanks TC.
Model Railroad Update 96_ Maroon Creek 5 (Almost There)
28:26
Otter Creek & Rio Grande
Рет қаралды 11 М.
Gli occhiali da sole non mi hanno coperto! 😎
00:13
Senza Limiti
Рет қаралды 17 МЛН
Magic? 😨
00:14
Andrey Grechka
Рет қаралды 13 МЛН
Zombie Boy Saved My Life 💚
00:29
Alan Chikin Chow
Рет қаралды 10 МЛН
This First Layout was a Mistake!!
18:34
Classic Model Trains
Рет қаралды 20 М.
N Scale Layout on a Door Ideas
10:14
Steve's Trains
Рет қаралды 18 М.
Moose Creek Logging Co.
8:28
Tales of the Magic Skagit
Рет қаралды 9 М.
Unreachable! I Found WHAT Inside These Inaccessible Caves??
13:17
The Trek Planner
Рет қаралды 51 М.
On18 Locomotive Build | Calico Mountain 14
30:00
ThunderMesaStudio
Рет қаралды 14 М.
Tour of the £600,000 Train Room Part 1
18:22
Cheshire RailCraft
Рет қаралды 45 М.
Model a Stamp Mill in HO (Structure Build 17.1)
44:10
Otter Creek & Rio Grande
Рет қаралды 1,2 М.
Märklin vs Fleischmann - Let's compare!
23:33
The 3rd Rail
Рет қаралды 20 М.
Model Railway Update - Trees, Tunnels and Scenery #10
28:39
Horsehay Railway Modeller
Рет қаралды 8 М.
Model Railroad Update 100 (Maroon Creek 9)  Staging Lights and Final Track Work.
30:49
Otter Creek & Rio Grande
Рет қаралды 1,3 М.
Gli occhiali da sole non mi hanno coperto! 😎
00:13
Senza Limiti
Рет қаралды 17 МЛН