Model Railroading 101 Informal Operations with Car Cards MR101

  Рет қаралды 19,928

TSG Multimedia

TSG Multimedia

Күн бұрын

Пікірлер: 42
@BlackWolfessUSCM
@BlackWolfessUSCM 5 жыл бұрын
My blackwilf mountain freight train has one job on our club layout. Run as an unscheduled extra and be a pain for operators to deal with. I totally enjoy doing that
@25mfd
@25mfd Жыл бұрын
@ 10:04... "... you don't get yelled at..." ... i had to chuckle a when he said that because i worked as a switchman for chicago and northwestern and i can tell for sure there was a LOT of yelling every now and then LOL... trainmaster yelling, yardmaster yelling, foreman yelling... even the dispatchers were yelling... everybody yelling lol
@briansmall3051
@briansmall3051 Жыл бұрын
It would be good to see how the car cards are changed when a car reaches an industry.
@splitrock323
@splitrock323 5 жыл бұрын
Well done. Some very well spoken club members explained their system very well. Operations are a lot of fun. I hope you get to operate on more layouts and see all the different styles. From TT&TO to CTC, Switchlist, tab on car, car cards to JMRI computer driven car forwarding. Good luck at your next session and thank you for sharing.
@erict.8190
@erict.8190 5 жыл бұрын
Thanks for the operations video its good to know how it all works
@gulflines1960
@gulflines1960 4 жыл бұрын
Good video, but it doesn't actually show how the CC&WB system is used to manage the movement of cars. Can you please do another video showing the operation of a local freight, and showing how cars move according to their waybill instructions.
@tsgmultimedia
@tsgmultimedia 4 жыл бұрын
This sounds like it could be an interesting show idea. I can tell you from my experience running at CMRS that the easy jobs simply have cards handed to the operator by the yard master and those cards have destinations on them. In my case, I had some for an intermediate yard then picked more cars up at that yard and took them to the yard at the end of the line. It's pretty simple.
@beeble2003
@beeble2003 3 жыл бұрын
I agree. Liam Hart's comments just repeat what was said in the earlier video with Seth Neumann -- that's fine for making the video self-contained, but it doesn't give any information that wasn't already in the general ops video. Then the train shown, a manifest freight between two yards is a poor choice, because its only interaction with the CC&WB system is that the engineer is given a wad of cards, which he hands to the Sacramento yardmaster when he arrives there. To show the working of the system, you need to show either a yard job, starting from the point when an incoming train arrives, or a local freight setting off and picking up cars at industries along the line.
@dacuzzz
@dacuzzz 5 жыл бұрын
awesome layout ... great run & explanation of what was going on..thx for sharing.. vinny/cuz
@TrashMan2008
@TrashMan2008 5 жыл бұрын
John, this was just FANTASTIC it was so good seeing just one side of the ins and outs of operations. I have always been a fan of operations but have yet participated in one. Is it at all possible to see a local run with pick ups and drops off. I know it’s asking a lot but this will just help the viewers see in more detail what else really happens. Also I believe the club also have a N scale layout. Do they do operations on the N scale layout as well. If you tell me that was the N scale layout you might just give me a heart attack because the level of detail is amazing and the sounds if the engines as well. I will wait to hear back from you. Peace be with you, and thank you so much for all you have done?
@tsgmultimedia
@tsgmultimedia 5 жыл бұрын
I have some plans to do a video like what you described in the future. That is, "what do railroads actually do?" and it will demonstrate in more detail the kind of job a local turn does.
@googlypal
@googlypal 2 жыл бұрын
20 staff? Sounds like a small FREMO meeting.😉
@SGTGhost
@SGTGhost 5 жыл бұрын
Now I know about cars operation Thanks John
@stevenswett2268
@stevenswett2268 5 жыл бұрын
Great Info! Makes it Fun Thanks!
@JoeG-firehousewhiskey
@JoeG-firehousewhiskey 5 жыл бұрын
Great video, I think the car cards system, is great especially once you get the hang of it. thanks for the video
@peterjhillier7659
@peterjhillier7659 5 жыл бұрын
Thank you John for a really informative Video and this System of Woking certainly adds realism to a model Railway's Operations, great.Thank all the Lads at the Society.
@miguelChivasFan17
@miguelChivasFan17 5 жыл бұрын
I got a good idea for MR101. Signals. But not just on how to install and use on a layout signals but also on what all the signal mean
@tsgmultimedia
@tsgmultimedia 5 жыл бұрын
I love the idea, Miguel. This has been on the list for quite some time. It's a tricky topic, though, because signals vary quite a bit from railroad to railroad. I can tell you something about the way Union Pacific signals work in the western states I've visited, but the east coast railroads have some differences. The same goes for signals on model layouts. I'll get around to this program at some point but I have a lot to learn about the differences! Maybe there are some experts out there willing to provide some info? Anyone?
@miguelChivasFan17
@miguelChivasFan17 5 жыл бұрын
@@tsgmultimedia I understand signals are different between railroads like UP BNSF And NS but knowing what signals are saying will be helpfull while chasing trains
@tsgmultimedia
@tsgmultimedia 5 жыл бұрын
Yes, knowing how to read signals can help a lot.
@chrisschanbacher9061
@chrisschanbacher9061 5 жыл бұрын
John, I'd be willing to help with signals if you wanted more information.
@tsgmultimedia
@tsgmultimedia 5 жыл бұрын
@@chrisschanbacher9061 That would be great. You're always welcome to forward info to me. You can find the email for that in my "about" section.
@davidoickle1778
@davidoickle1778 3 жыл бұрын
"Passenger trains have priority" on the layout? Not very realistic is it? LOL it's the way it should be though!
@bigbake132
@bigbake132 3 жыл бұрын
Amtrak trains hardly ever have priority because they usually run on freight track from other companies.
@GRUBEDGAM1
@GRUBEDGAM1 5 жыл бұрын
How keep they the track clean? I'ts a very large layout with open Space!
@rjl110919581
@rjl110919581 3 жыл бұрын
thank you for detailed video operation
@miguelChivasFan17
@miguelChivasFan17 5 жыл бұрын
Thats good advice about OPS Sessions and Car cards but what about people like me who just a have a simple 4x8 N scale layout. What kind OPS is there for small layouts
@tsgmultimedia
@tsgmultimedia 5 жыл бұрын
Small layouts are almost always designed for switching. You could easily make up switch lists to instruct the operator where to place which equipment.
@miguelChivasFan17
@miguelChivasFan17 5 жыл бұрын
@@tsgmultimedia my layout is a 4x8 double loop track with a small railyard and its DC powered. Maybe someday there could be a MR101 episode about OPS for small layouts
@CreativeRails
@CreativeRails 5 жыл бұрын
Another great video John! Really clear and well explained. Sweet layout too!
@tsgmultimedia
@tsgmultimedia 5 жыл бұрын
Thanks, Ben. Just workin' it. I think a lot of people are intimidated by ops but it can be a whole lot of fun and it doesn't have to be overly complicated.
@bneagleriversubdivision6224
@bneagleriversubdivision6224 5 жыл бұрын
Slow down on the train moves.
@nathandelay
@nathandelay 5 жыл бұрын
Cool and awesome
@a1919akelbo
@a1919akelbo 5 жыл бұрын
An LPS right brhind the 4 engines, 3 LPS's right infront of the caboose. 4 power for something that needs 2. Also a caboose on a modern train. God i love foamers.
@tsgmultimedia
@tsgmultimedia 5 жыл бұрын
Someone sure sounds like a foamer!
@charlierumsfeld6626
@charlierumsfeld6626 5 жыл бұрын
Canadian railway demands caboose?
@chrisschanbacher9061
@chrisschanbacher9061 5 жыл бұрын
Who says it's a load? If it's an empty LPG it's fine with only 2 spacers. In fact it's still fine with only one. In any case, it's not real world anyway! Their railroad, their rules!
@a1919akelbo
@a1919akelbo 5 жыл бұрын
@@chrisschanbacher9061 LPS stands for "Load Prone to Shift" sadly you don't learn this in youtube videos since its only part of CROR training. Anyways a load prone to shift is anything that is a load and can shift... So pipes, equipment on flats, lumber, etc. And cannot be marshaled beside any special dangerous, ERAP, or crew/passenger carrying car/piece of equipment. In Canada you only need 1 buffer car between any of these but in the US it requires 5.
@a1919akelbo
@a1919akelbo 5 жыл бұрын
@@tsgmultimedia I wish i could play trains all day in a heated house but sadly i have to play trains outside in a yard.
Model Railroading 101 Passenger Cars For Beginners
40:27
TSG Multimedia
Рет қаралды 97 М.
How To Get Married:   #short
00:22
Jin and Hattie
Рет қаралды 24 МЛН
11) Car Card / Waybill System in Action
14:51
Kevin Brown
Рет қаралды 7 М.
Model Railroading 101 All About Standards For Beginners MR101
37:36
TSG Multimedia
Рет қаралды 47 М.
Model Railroading 101 Diesel Locomotives For Beginners Pt 1
30:07
TSG Multimedia
Рет қаралды 100 М.
Model Railroading 101 Freight Cars For Beginners
34:51
TSG Multimedia
Рет қаралды 114 М.
Model Railroading 101 Using JMRI With NCE MR101
25:10
TSG Multimedia
Рет қаралды 22 М.
Hotrak Big red madness at the sept layout
10:25
Bubs031
Рет қаралды 413
Model Railroading 101 Diesel Locomotives For Beginners Part 3
43:32
TSG Multimedia
Рет қаралды 79 М.
Glendale Model Railroad Club with Desert Charley
15:23
Desert Charley Videos
Рет қаралды 5 М.