No video

INITIAL SETTING TIME OF CEMENT

  Рет қаралды 69,536

Mohan A

Mohan A

Күн бұрын

Пікірлер: 30
@rameshgadidesi4625
@rameshgadidesi4625 3 жыл бұрын
Finally you not showing initial setting time value . actually initial setting time before 30 min naa.
@rajaram-pu2tn
@rajaram-pu2tn 3 жыл бұрын
Don't give half half information 1)when ur add water timer should starts 2) for make penidation should need 2differnt diameter needle 3)use for determine initial setting time for 3mm needle 4)use for final setting time smaller mean 1mm 5)waterquantity=0.85×standard consists ofwater(like 0.32)×weight of cement (may you take 250 gram)
@sanjeeviglesias6293
@sanjeeviglesias6293 4 жыл бұрын
The cement weighing 300g is taken and it is mixed with Percentage of water as determined in consistency test. The cement paste is filled in the vicat mould. The square needle of cross section 1mm× 1mm is attached to the moving rod of the vicat apparatus. The needle is quickly released and it allowed to penetrate the cement paste in tge begging the needle penetrate completely.it is then taken out and dropped at a fresh place the procedure is repeated at regular intervals till the needle does not penetrate completely the needle should penetrate upto about 5 mm measured from bottom. The initial settings time is the interval between the addition of water to cement and the stage when needle cease to penetrate completely.thia time should be about 30 minutes for opc
@thirunavukarasu0079
@thirunavukarasu0079 Жыл бұрын
👌
@mandanmishra5660
@mandanmishra5660 3 жыл бұрын
No better performance by you, 1)you don't obey the gauging rule. 2)you don't obey the time period. 3)I don't understand how you use gauging trowel by one hand. 4)pouring water is too slow.
@gopalakrishnapodilapu7599
@gopalakrishnapodilapu7599 3 жыл бұрын
Thank you sir
@SoudagerAamer
@SoudagerAamer 4 жыл бұрын
0:22 That's needle isn't it?
@Right_ToServe
@Right_ToServe 4 жыл бұрын
Sir I think u r added again some of water... 🤔🤔
@samarthanreddy4117
@samarthanreddy4117 5 жыл бұрын
0.85×32% equals 0.272 sir.. how did u get 68ml? Could u please explain that
@yasamnaresh5634
@yasamnaresh5634 5 жыл бұрын
In serial no 3 the percentage of water taken is 32% i.e 80ml..at 32%we obtained standard consistency.so for IST we have to take 0.85*80=68ml..
@rohitgooner878
@rohitgooner878 4 жыл бұрын
The Weight of cement taken in this case is 250g. So, 32% of 250 = 80ml 0.85 * 80 = 68ml
@ashwinichinu2681
@ashwinichinu2681 4 жыл бұрын
Tq u sir
@janninoenecio78
@janninoenecio78 3 жыл бұрын
@@rohitgooner878 where did 0.85 came from?
@shantharam2699
@shantharam2699 Жыл бұрын
Actually just 24% water is enough of cement weight bro
@mdshahbaz8054
@mdshahbaz8054 5 жыл бұрын
Thank you sir.
@civilengineeringbykrishans9406
@civilengineeringbykrishans9406 4 жыл бұрын
Good video
@mohana3983
@mohana3983 4 жыл бұрын
thnks
@ravipatel9316
@ravipatel9316 5 жыл бұрын
But, lastly you not showing what is exect initial setting time...
@mgmwgl
@mgmwgl 5 жыл бұрын
@Ravi Patel.. its 35 minutes
@vishnuvardhan7135
@vishnuvardhan7135 5 жыл бұрын
@@mgmwgl but our Is standard initial setting time of cement is 30. But , experimentaly you get 35. Could you please tell us sir
@thetechnicalaspirants357
@thetechnicalaspirants357 4 жыл бұрын
Thank u sir
@omkarutekar8950
@omkarutekar8950 4 жыл бұрын
take 400 gm of cement hame to aisa bata yaa hai
@moomin013
@moomin013 4 жыл бұрын
Correct one
@bhagatuttam1452
@bhagatuttam1452 3 жыл бұрын
Good knowledge sir ,
@badalkumar6603
@badalkumar6603 3 жыл бұрын
Galat testing kiya hai.
@uwiringiymanajohn2352
@uwiringiymanajohn2352 3 жыл бұрын
E
@gautamkadam4067
@gautamkadam4067 4 жыл бұрын
सब गलत कर रहे हो.
@sanjeeviglesias6293
@sanjeeviglesias6293 4 жыл бұрын
The cement weighing 300g is taken and it is mixed with Percentage of water as determined in consistency test. The cement paste is filled in the vicat mould. The square needle of cross section 1mm× 1mm is attached to the moving rod of the vicat apparatus. The needle is quickly released and it allowed to penetrate the cement paste in tge begging the needle penetrate completely.it is then taken out and dropped at a fresh place the procedure is repeated at regular intervals till the needle does not penetrate completely the needle should penetrate upto about 5 mm measured from bottom. The initial settings time is the interval between the addition of water to cement and the stage when needle cease to penetrate completely.thia time should be about 30 minutes for opc
@arunkumar2929
@arunkumar2929 3 жыл бұрын
👎👎👎👎
@cockerala1633
@cockerala1633 4 жыл бұрын
Thank you sir
NORMAL CONSISTENCY OF CEMENT
12:52
Mohan A
Рет қаралды 98 М.
Initial and final setting time of cement test procedure in Hindi
16:17
Concrete Engineers
Рет қаралды 5 М.
🩷🩵VS👿
00:38
ISSEI / いっせい
Рет қаралды 27 МЛН
Schoolboy Runaway в реальной жизни🤣@onLI_gAmeS
00:31
МишАня
Рет қаралды 4 МЛН
OMG what happened??😳 filaretiki family✨ #social
01:00
Filaretiki
Рет қаралды 13 МЛН
FOUNDATION MARKING IN TAMIL
9:38
Mohan A
Рет қаралды 158 М.
Initial & Final Setting Time Test Of Cement With Consistancy Test In Hindi
14:57
DETERMINATION OF INITIAL AND FINAL SETTING TIME OF CEMENT
20:38
HIGHWAY GUIDE
Рет қаралды 57 М.
Normal consistency of cement
11:49
Civil engineering Institute
Рет қаралды 24 М.
How to Determine the Initial & Final Setting Time of the Cement || Cement Test #2 ||
3:19
Anime_Edu - Civil Engineering Videos
Рет қаралды 118 М.
🩷🩵VS👿
00:38
ISSEI / いっせい
Рет қаралды 27 МЛН