Monaco land extension : the amazing installation of the protective belt made of 18 caissons

  Рет қаралды 36,636

Mareterra

Mareterra

4 жыл бұрын

In September 2018, the 18 reinforced concrete caissons began to be assembled in Monaco. It's been an amazing work ended in July 2019. Caissons act as a bulwark against the effects of swell by absorbing the waves that hit the new coastline in damping chambers.
Trapezoidal in shape, each caisson is 28 metres wide, 27 metres high, weighs 10,000 tonnes and requires more than 3,800m3 of concrete for its construction.
The final approach manoeuvre to the designated location is carried out with two multicat vessels placed at the front and rear of the caisson.
These ships have azimuthal propellers that rotate 360°. They are therefore extremely manoeuvrable, which allows to manually adjust the positioning of the caisson, and offers both stability and manoeuvrability. This is decisive for adjusting its position to the nearest centimetre. This is how the caisson is brought to its installation area, practically to its final location.
At this stage, the caisson undergoes a first ballasting to bring it less than one metre above the backfill.
The final installation is managed by six hydraulic winches placed on the caisson. Six people are on board to deploy six cables all around the caisson to be immersed, which are then docked on the adjacent caisson already laid.
The caisson is equipped with topographic monitoring equipment. Like the driver and co-driver in a rally car, the topographical manager reads the data and gives, in real time, the position of the caisson to the operations manager who moves it by managing the tension of the cables. Once the caisson is definitively stabilised, balanced 50cm above its final position, it is completely ballasted to make it descend onto the backfill. In the event of a difference between the target position and the actual position, as the ballasting is liquid, all it takes is to discharge the ballast water from the caisson to return it to float and resume the operation.
When the installation is validated, the water is replaced by 0/20 grain sand to make the caisson even more stable. This is the solid ballasting phase. To limit the risk of turbidity, the water is pumped out as solid ballasting progresses, respec- ting settling times to discharge clear water into the sea. After this operation, the final weight of the caisson is about 24,000 tonnes.
So now you have all the explanation : let's watch the short movie !!!
Copyright Bouygues TP MC

Пікірлер
Monaco s'est lancé dans un chantier pharaonique d’extension sur la mer, le plus grand d’Europe
13:28
Monaco Extends over the Sea: a €2BN Megaproject
14:06
Looking 4 (En)
Рет қаралды 477 М.
🤔Какой Орган самый длинный ? #shorts
00:42
DAD LEFT HIS OLD SOCKS ON THE COUCH…😱😂
00:24
JULI_PROETO
Рет қаралды 14 МЛН
Nastya and SeanDoesMagic
00:16
Nastya
Рет қаралды 10 МЛН
Monaco Travel Guide 2024 : Explore Luxury & Glamour
8:50
NicRob Travel
Рет қаралды 878
The Magnificent Seven First Fight (Rose Creek Battle)
8:04
How LUXURY Rolls-Royce Cars Are Made ? (Mega Factories Video)
18:07
Engineering World
Рет қаралды 15 МЛН
10 Biggest Heavy Lift Ships In The World
12:05
Aquatical
Рет қаралды 279 М.
How Singapore Conquers Land That Doesn't Exist
8:44
Versed
Рет қаралды 346 М.
The land reclamation of Monaco 🇲🇨
5:26
DocoMonde
Рет қаралды 10 М.
Самые крутые школьные гаджеты
0:49
СТРАШНЫЙ ВИРУС НА МАКБУК
0:39
Кринжовый чел
Рет қаралды 1,5 МЛН
Это - iPhone 16 и вот что надо знать...
17:20
Overtake lab
Рет қаралды 104 М.
Лазер против камеры смартфона
1:01
NEWTONLABS
Рет қаралды 242 М.
Сколько реально стоит ПК Величайшего?
0:37
Samsung laughing on iPhone #techbyakram
0:12
Tech by Akram
Рет қаралды 671 М.