Fairmont Tamper Leveling New Track RailRoad Work Union Pacific

  Рет қаралды 5,250

mossman381

mossman381

Күн бұрын

Пікірлер: 13
@UnitCrane514
@UnitCrane514 9 жыл бұрын
Those machines are so amazing with how they function and do so many different things at the same time!
@mossman381
@mossman381 9 жыл бұрын
UnitCrane514 The railroad has many specialized machines. I am sure it took awhile to get this machine to work right.
@gangesexcavating
@gangesexcavating 9 жыл бұрын
This is the machine that will bank the curve for the track layout. Those are laser targets on the buggy.
@mossman381
@mossman381 9 жыл бұрын
Tax me I'm Canadian I saw the laser levels on the front. I also saw that they could work one side at a time. I didn't know they banked the curves.
@gangesexcavating
@gangesexcavating 9 жыл бұрын
mossman381 lifts the track, tamps ballast and sets the banked curve according to plan from the lasers.
@KStewart-th4sk
@KStewart-th4sk 7 жыл бұрын
Not sure what you mean by laser targets on buggy. Those are infra-red projectors on buggy which shine a beam of light to receivers on back of machine--two receivers for surface and one for lining. The buggy does appear to have a laser attachment but does not appear being used here as cover is still on control panel. This operator is doing a terrible job of operating this machine. Clamp frame is not set up properly---hooks do not need to be going all the way out, clamp hooks should be grabbing rail just below the head of rail. Why he is constantly moving the workheads all the way out, I do not know. This Mk IV Tamper should be indexing from tie to tie at a fast rate. Either the operator has not been properly trained or if he was he should be taken off of it. In his or her hands, it is a terrible demonstration of what this machine is capable of doing.
@UnitCrane514
@UnitCrane514 9 жыл бұрын
I wonder how long it took the designers to figure out how to make that thing work!?
@sureman13
@sureman13 6 жыл бұрын
adjust your clamp frame limit switches or toggle them up ,amatuer
@orenthalwalden6843
@orenthalwalden6843 7 жыл бұрын
I'm a operator of a machine like this one,I do about two miles a day, he is crapping along with it
@daviddave7392
@daviddave7392 6 жыл бұрын
Maybe he was new and he got to go over and over 30' of rail until it was right.
@WOAAuser
@WOAAuser 8 жыл бұрын
Too bad the operator isn't paying attention to what he is doing. Missed raising most of the ties.
@farmboy30117
@farmboy30117 9 жыл бұрын
Cool machine, but what a boring job!
@mossman381
@mossman381 9 жыл бұрын
farmboy30117 I bet it wouldn't be so boring when you get the paycheck those guys get :)
TRRS 547: Railroad Rail Replacement
26:19
Thornapple River Rail Series
Рет қаралды 2,1 МЛН
Drone Tamper NS
5:50
RAILMEX rail
Рет қаралды 2,3 М.
人是不能做到吗?#火影忍者 #家人  #佐助
00:20
火影忍者一家
Рет қаралды 20 МЛН
Cheerleader Transformation That Left Everyone Speechless! #shorts
00:27
Fabiosa Best Lifehacks
Рет қаралды 16 МЛН
Cat mode and a glass of water #family #humor #fun
00:22
Kotiki_Z
Рет қаралды 42 МЛН
WORKSHOP WEDNESDAY: Panzer IV vs T-34 Driving Experience!
18:22
The Australian Armour & Artillery Museum
Рет қаралды 1,4 МЛН
Inside the V3 Nazi Super Gun
19:52
Blue Paw Print
Рет қаралды 2,4 МЛН
A quick tour of the 'worst place on earth' aka, BaoGang Steel Mill
10:29
TheMcThirstyBrothers
Рет қаралды 6 МЛН
The Smart Tricks Inside Telescopic Machines
11:40
Know Art
Рет қаралды 747 М.
The Reason Train Design Changed After 1948
13:05
Joe Scott
Рет қаралды 1,8 МЛН
Spin Gravity Compared
12:12
The Overview Effekt
Рет қаралды 1,3 МЛН
The LARGEST Thing We've Machined in 60 years (It's Too Big For The MEGABORE!)
28:48
HAL Heavy Duty Machining Australia
Рет қаралды 235 М.
Loram ballast cleaner SBC-35 in action
12:13
Khang Lu
Рет қаралды 84 М.
CSX Replacing Railroad Ties on the CE&D sub
22:42
Grainexpress
Рет қаралды 1,1 МЛН