No video

Loram ballast cleaner SBC-35 in action

  Рет қаралды 82,020

Khang Lu

Khang Lu

4 жыл бұрын

6/5/20
On a beautiful summer day, I stumbled upon a Loram Shoulder Ballast Cleaner: SBC-35. These machines are quite complex, and work to remove dirt from the shoulders of the track. The large digging wheels pick up the ballast from the shoulder, and the conveyor belts move it to the screen. The screen shakes out the ballast from the dirt by separating them based on particle size, with the dirt being sent away from the track using another conveyor. The plows are then used to reshape the track profile. Though these machines are slow, they are very mesmerizing to watch! The first scene shows the machine moving towards the Detroit Lakes Subdivison on the Paynesville Subdivision, while the rest show the machine working in Vergas, Minnesota. Also included is a CP ballast train passing through Vergas with three GMD SD40-2s. More on that to come.

Пікірлер: 48
@carrollcameron7472
@carrollcameron7472 2 жыл бұрын
How could anyone think-up and build, that set of machinery, is beyond me. The same with the rail grinder and it's 862 grinders, each with a different angle to grind (I may have exaggerated the 862 grinders, it just seems that way with all the sparks and smoke lol). Anyway, thank you for posting this. I had never saw a ballast cleaner in action before.
@baminibaum1301
@baminibaum1301 2 жыл бұрын
I think the same thing. Who in the hell conceives the machinery. I watched a machine come along the rail line the first part pulled spike out of the timbers, then almost at the same instance latched on to the old timber vibrated it out, and vibrated another one in and replaced the spikes securing the new rail timber into place. then it moved on to the next old timber that was marked and repeated the process. It was almost an instantaneous operation.
@kleetus92
@kleetus92 2 жыл бұрын
What I was surprised with in the first clip is how much material was being discarded vs the amount of ballast going back in. Maybe the lighting was making it look less, but I'd swear that 75% of the material picked up was being discarded, whereas on the second mainline clip, it looked a whole lot better only discarding maybe 10% of material. Great video!
@wrandowc
@wrandowc Жыл бұрын
Depends on the track some rock is dirty
@ocsrc
@ocsrc 2 жыл бұрын
The ballast is cleaned to provide for drainage. If you have a coal line, all the coal dust clogs the ballast and the ties rot because they can't drain away the water
@jessiemcfarland3666
@jessiemcfarland3666 2 жыл бұрын
@ocsrc that makes sense. I couldn't imagine why they were cleaning rocks.
@stephenrice4554
@stephenrice4554 2 жыл бұрын
Puts me in mind of the cleaning jobs we had on the mainline , ballast cleaner , with a rake of spoil wagons on the next road , then a stone train and a tamper to finish it off . Long job but saved a lot of shovel bashing . 👍🇬🇧
@dennisb-trains23
@dennisb-trains23 2 жыл бұрын
Ahhhhhh look like a beautiful hot summer day. Cool video.
@ratdog3055
@ratdog3055 2 жыл бұрын
Interesting to watch, but someone telling the why and how the equipment works would be a great help in understanding the operation
@roberthenry9319
@roberthenry9319 2 жыл бұрын
Absolutely.
@kleetus92
@kleetus92 2 жыл бұрын
The how isn't super complicated, it's a screening system that separates finer, lighter material away from the track ballast, much like you'd have at any gravel quarry. The why is to extend the life of the track and ties... by removing the fine material that invariably fall from other hopper cars traveling the line, it allows water to better drain from the roadbed so the ties do not rot. This also helps in keeping mud from forming which along with rotting the wood ties, can also cause the roadbed to get soft and not maintain a level surface for the train to travel over. This reduces the flex on the rail and prevents rail cracks and defects. Also by eliminating undue flexing like that, higher speeds can be ran to deliver product faster. What's missing from this particular system is ballast cleaning from between the rails and ties. That process is a lot slower and requires a lot more work. This is a good first or interim step before doing major track refurbishment.
@markg.2501
@markg.2501 2 жыл бұрын
@@kleetus92 Thank you very much....I appreciate your explanation.
@digitalmoviedv
@digitalmoviedv 2 жыл бұрын
Interesting and complete report! Great scene and camera work. Greetings from Italy. Ciao, Stefano.
@nancylynch6045
@nancylynch6045 2 жыл бұрын
Those poor guys working with all that dust! I hope they had masks on. Amazing machine.
@dafterite
@dafterite 2 жыл бұрын
2:05 - Those two guys in front must be showing it where to go. 😁
@pureblood8427
@pureblood8427 2 жыл бұрын
Using that porta shitter while moving has to be an experience.
@chrisstromberg6527
@chrisstromberg6527 6 күн бұрын
Yes the workers are human, who would have guessed.😒
@kkoch666
@kkoch666 4 жыл бұрын
Looks like a maintenance nightmare
@KhangLuRailVideos
@KhangLuRailVideos 4 жыл бұрын
I actually worked on a machine like this last summer, SBC-17. It wasn't bad at all!
@floodedcar123
@floodedcar123 Жыл бұрын
Pretty cool
@brandonharrischannel7516
@brandonharrischannel7516 2 жыл бұрын
Never seen those before
@geneva760
@geneva760 2 жыл бұрын
HA - who would have thought that watching stones get 'cleaned' was so enjoyable - HA - a great find indeed - probably a 'once in a lifetime' rail watching experience - thanks for sharing. Just a thought for the workers though - they should have proper dust masks on - I am sure that there is a high risk of silicosis of the lungs from that type of dust. Forgive my ignorance - but why do they "clean" the ballast//stones? HA - did anyone notice the dragonfly entering the view at around 10:58? Have a safe and nice day all. This was a NEATO video - thanks again. CHEERS from AUSTRALIA.
@davep6977
@davep6977 2 жыл бұрын
they clean the stone for better drainage. Stone stone with sand and dirt holds water and rots the ties + dirt can't handle the weight of the trains
@user-jh5gg1dz8n
@user-jh5gg1dz8n 8 ай бұрын
Frecherylb 24❤❤❤❤❤❤❤❤happy
@brandonharrischannel7516
@brandonharrischannel7516 2 жыл бұрын
That’s fast
@CosgroveNotts
@CosgroveNotts 3 жыл бұрын
No dust suppression?
@donl3248
@donl3248 2 жыл бұрын
Where do you go for parts when there’s a breakdown? It not like there’s a NAPA in every town for track maintenance machines.
@madtrucker0983
@madtrucker0983 2 жыл бұрын
I assume they keep many spares of the parts in store that need servicing the most often.
@tigerofviolet
@tigerofviolet 4 жыл бұрын
That’s baby lol. It’s my fiancé’s machine 😊
@mikekline7299
@mikekline7299 3 жыл бұрын
Who’s your fiancé, cuz it ain’t old balding
@tigerofviolet
@tigerofviolet 3 жыл бұрын
Nope his name is Nick.
@mikekline7299
@mikekline7299 3 жыл бұрын
Not nick, I always thought he was gay! He would always try to cuddle me in my room. Huh who knew.
@tigerofviolet
@tigerofviolet 3 жыл бұрын
Lmfao desperate times call for desperate measures I guess 😂
@mikekline7299
@mikekline7299 3 жыл бұрын
Tell my butt hole that
@saintswillwin1013
@saintswillwin1013 2 жыл бұрын
Around the 9:00 mark the left broom isn't down.
@chrisstromberg6527
@chrisstromberg6527 6 күн бұрын
They were about to cross a grad3 crossing at that point.
@Steinstra-vj7wl
@Steinstra-vj7wl 2 жыл бұрын
Those man walk all day in that dust without masks - terrible.
@thomascrowell3835
@thomascrowell3835 2 жыл бұрын
Why clean ballast?
@volvotgb9999
@volvotgb9999 2 жыл бұрын
Dirt, debris etc. reduce the stability (interlocking) of the ballast. See here a German one with explanations (use subtitle). kzbin.info/www/bejne/aZXHmqqhqNWLrqc
@madtrucker0983
@madtrucker0983 2 жыл бұрын
It separates the gravel from dirt mostly from coal trains to improve drainage. If they don't the railroad will become waterlogged.
@jonnie2bad
@jonnie2bad 2 жыл бұрын
a machine that cleans dirt ........ why is this a thing?
@richardholte1859
@richardholte1859 2 жыл бұрын
Taking movie in the shadow! Bad
@bendover9411
@bendover9411 2 жыл бұрын
Why clean rocks lmao 😂
@residivisblongkiri
@residivisblongkiri Жыл бұрын
🙄
@trappenweisseguy27
@trappenweisseguy27 2 жыл бұрын
A solution in search of a problem.
@Andrew-vo9ev
@Andrew-vo9ev 2 жыл бұрын
LORAM COMPANY SUCKS 👎
@williambryan9087
@williambryan9087 Жыл бұрын
so do you, cupcake
Plasser American Ballast cleaner in action on BNSF mainline
16:10
Pacific NW Railfan
Рет қаралды 3,4 М.
Jumping off balcony pulls her tooth! 🫣🦷
01:00
Justin Flom
Рет қаралды 35 МЛН
Box jumping challenge, who stepped on the trap? #FunnyFamily #PartyGames
00:31
Family Games Media
Рет қаралды 30 МЛН
Look at two different videos 😁 @karina-kola
00:11
Andrey Grechka
Рет қаралды 13 МЛН
When A Gang Leader Confronted Muhammad Ali
11:43
Boxing After Dark
Рет қаралды 7 МЛН
Pittsburgh's Rolling Ingot Steam Locomotives
30:18
Railroad Street
Рет қаралды 71 М.
Loram High Performance Shoulder Ballast Cleaner
4:31
Loram Maintenance of Way, Inc.
Рет қаралды 100 М.
Disaster at Drewton - They buried the longest tunnel :(
35:19
ALW Research Team
Рет қаралды 108 М.
UP Big Boy 4014 helps a stalled freight train in Blair Ne.
17:48
bnwohlers
Рет қаралды 4,2 МЛН
CSX Replacing Railroad Ties on the CE&D sub
22:42
Grainexpress
Рет қаралды 1 МЛН
LORAM Ballast Cleaner SBC-2401 Chase! Up Close Look at How it Works
13:57
Worlds largest track layer in 2011 - Plasser & Theurer SVM1000 Infranord at Haparandabanan, Sweden
17:51