Lagan at Guernsey Airport - Night Work on The Runway

  Рет қаралды 235

MrBooojangles

MrBooojangles

Күн бұрын

This video shows the work being done at night by Lagan Construction, on Guernsey's Airport runway on the 24th and 31st July 2012. Lagan's work on the runway started in March 2012 and continued every night for 12 months between 9.30pm and 5.30am. The runway work had to be finished in time to allow it to be operational again by 6.00am every morning, ready for the first aircraft of the day to arrive.
At the east end is an excavator digging a trench for part of the new drainage system which goes the whole length of the runway and at the west end there are various machinery filling in and raising a long dip in the runway, which took 10 months alone to complete. This had to be done, as pilots in aircraft waiting at one end of the runway, could not see if aircraft at the other end had left the runway or not and this was deemed unsafe in 2012. The runway at the east end is actually on top of a hill and sloped off downwards roughly halfway along, then flattened out again towards the west end.
AIRPORT HISTORY AND LAGAN CONSTRUCTION'S WORK
Guernsey Airport opened on the 5th May 1939, and today handles nearly a million travellers every year.
In 2002 the new airport terminal building, car park and surrounding area, was built by Hochtief and became operational on the 19th May 2004. Hochtief also demolished the old terminal building that dated from 1939.
Originally Guernsey Airport had four grass runways, but 1960 saw the construction of a new single tarmacked runway 4,800 ft (1,463 m) long.
In March 2012, Lagan Construction began work on a major programme of essential maintenance and improvements, representing probably the largest development at the airport in more than 70 years. The project was called Airport 2040 and the work that was done is expected to keep the airport going until the year 2040. The work which cost £80million (€93 million at the time) was due to last 22 months, but actually finished two months ahead of schedule.
The work included:
* Construction of an additional 120 metre runway section to the west.
* Create longer grass safety areas at both ends of the runway.
* Removing a long dip in the runway by building it up.
* Resurfacing of the whole runway.
* Resurface all the taxiways.
* Extend the existing taxiway to join up with the runway extension.
* Install a new surface water drainage system.
* Reconstruct all the concrete apron areas.
* Construct new apron areas where there were grass areas.
* Provide additional aircraft stands on the aprons.
* Install new ground lighting.
* Install new navigational aids.
* Move and replace all the runway approach lights.
Most of the work on the apron was done during the day, but the work on the runway was mainly carried out at night, while the airport was closed. The runway then had to be returned to a usable state prior to reopening at 6am each morning. That element of the project was expected to last around seven months. To carry out the work, Lagan Construction built a concrete batching plant on a field opposite the airport entrance, it built a village of portacabins near the Mallard Hotel to house it's staff, they built an office block built out of portacabins on a site at the back of the spectators car park at La Villiaze and they built a temporary dock at St. Sampsons Harbour.
This dock was where small cargo ships constantly delivered different grades of sand and aggregate for the project, which were then stored in huge heaps on the Longue Hougue reclamation site. The sand and aggregates were then transported using a fleet of large trucks and John Deere tractors and trailers from there to Guernsey Airport. All the plant machinery and trucks used for the project arrived on the local RoRo ferries, Commodore Goodwill and Commodore Clipper and were moved in convoy from St. Peter Port Harbour, to the airport overnight, when the roads were empty of traffic.
www.laganconstruction.com/laga...
theoldsite.gov.gg/CHttpHandler...
www.bbc.co.uk/news/world-europ...

Пікірлер: 1
@carmelalantelme7163
@carmelalantelme7163 Жыл бұрын
😩 Pᵣₒmₒˢᵐ
Lagan Unloading Aggregate From Ships at St. Sampsons Harbour, Guernsey
11:15
This Pilot BREAKS the RULES - But Saves 418 Lives | Terror on Board
17:11
Incredible magic 🤯✨
00:53
America's Got Talent
Рет қаралды 80 МЛН
孩子多的烦恼?#火影忍者 #家庭 #佐助
00:31
火影忍者一家
Рет қаралды 51 МЛН
New model rc bird unboxing and testing
00:10
Ruhul Shorts
Рет қаралды 21 МЛН
TEN MILLION VIEWS - THANK YOU SO MUCH
6:02
MrBooojangles
Рет қаралды 1 М.
Egypt Is Building A $9.7BN Artificial River In The Desert
9:51
Global Mega Marvels
Рет қаралды 2,5 М.
How Grain is Sold at the Elevator
28:39
Farmer Grayce
Рет қаралды 119 М.
Diamond T Life Ep 6 - Winch Installation
11:10
Auto Addict Steve
Рет қаралды 142
BUMBLEBEE Ferry Arrives and Leaves Guernsey
3:35
MrBooojangles
Рет қаралды 720
Oshkosh Heavies/Large Aircraft! EAA AirVenture Oshkosh 2023
23:32
AirshowStuffVideos
Рет қаралды 26 М.
Incredible magic 🤯✨
00:53
America's Got Talent
Рет қаралды 80 МЛН