Mumbai-Ahmedabad high speed rail aims to cut travel time by up to two-thirds

  Рет қаралды 33,326

CNBC International TV

CNBC International TV

26 күн бұрын

The project, which was approved in 2014, faced several setbacks.

Пікірлер: 253
@Boldtruths
@Boldtruths 23 күн бұрын
People who are comparing Indian Bullet train project with Indonesia... Must Understand... In Indonesia Chinese workers and Chinese machines are doing the majority of work with Indonesian workers. **But in India L and T(an Indian company) is doing the construction.** **Electrical overhead wiring work will also be done by L and T** Machines are also built and operated by Indian engineers. Only Chief engineer comes once a while from Japan to see progress and modifications. **So technically India is learning how to make bullet train project** **Just like we learned how to make world class Metro infrastructure** And also JAPAN'S bullet trains are safest and best in the world. "So asking for help again n again in future from Japan is not what India is thinking." That's why it is taking time. Additional info -- Indonesia's route length is 142 km with 4 stations. **India's route length is 508 km (476 km elevated on pillars, including 21 km undersea tunnel) with 12 stations.** "Also, Undersea tunnel will be made by AFCONS which is also an Indian Company. So, it will take time. *Source-Wikipedia.
@tanveerahmad72
@tanveerahmad72 22 күн бұрын
Afcon is the French company. Google it.
@aburetik4866
@aburetik4866 21 күн бұрын
lndonesian bullet train project finished on schedule and now is in full operation, but how many times has the lndian project been delayed and can it finish before 2100? 😅 No one should ever employ lndian construction company
@Boldtruths
@Boldtruths 21 күн бұрын
@@aburetik4866 That same company Built... *world's tallest statue. *World's biggest cricket stadium. *World's highest railway bridge. *India's first Undersea Road tunnel. *India's longest sea bridge of length 21 km. *Rocket for chandrayaan 3 mission which made India to reach on moon's south pole for the first time. *It is worth more than 20 billion dollars and it operates in more than 45 countries.* *Metro in more than 12 cities of India. So before using fingers use brain cells. 142 km
@Someone-wh8hi
@Someone-wh8hi 20 күн бұрын
and they are building it very fast. of course europe/us has other standards as well as high environmental hurdles, but high speed rail takes for ever in these countries.
@udhayakumarMN
@udhayakumarMN 20 күн бұрын
But Time is money
@moonbalancedd
@moonbalancedd 23 күн бұрын
Missing key details: It's the shinkansen bullet train being built from Japan which has an impeccable record at 320kmph. Japan is also financing 90% of the costs as a 0.1% interest 50 year loan with a 15 year moratorium at the start. Practically free transfer of technology and project.
@daipayanbhowal8914
@daipayanbhowal8914 23 күн бұрын
Japan is financing but majority of technology is being developed in-house by L&T even new construction methods and also Vande Bharat based Bullet trains will made by RCF & BEML
@moonbalancedd
@moonbalancedd 23 күн бұрын
@daipayanbhowal8914 that is correct. Manufacturing is local, only technological expertise is obtained. Which is crucial because bullet train is a completely different challenge than even vande bharat trains. The smallest of things like vibrations and movement of the tracks, inclination, declination, curve, air pressure is strictly controlled. The tracks are specially constructed. India does not yet know how to do this but learning from Japan which has perfected this, it will make it's own in house bullet trains in the future.
@minalkumari9556
@minalkumari9556 23 күн бұрын
No bro, its 108000 crore and japan is giving about 80000 crore rest by states and centre ​@@wretfsfvd
@xcel5203
@xcel5203 22 күн бұрын
Japanese bullet train technology is the costliest; it has not been used anywhere else. As for cost the Japanese are in it for profits and are not doing a social service. As for technology they will never transfer the most sophisticated proprietary technology to any other country ; you're kidding yourself if you believe it .
@aryaman05
@aryaman05 22 күн бұрын
Most 'expert analysts' seem to miss this point, i.e.: this project is essentially a gift from Japan.
@Anonymous-dy2zu
@Anonymous-dy2zu 21 күн бұрын
Indonesians incoming by comparing their 160km of hsr with 500km of hsr completely built by our indian companies with strong Japanese assistance, rather than chinese contractor who are wholly constructing the whole project with their equipments and workers with very less technology transfer Edit: I am not comparing both countries bullet train technology as Japan and China both countries mastered the HSR technology, infact china has the most hsr train network of more than 45000+ km
@cardano5122
@cardano5122 18 күн бұрын
You dont even have 1 hsr in jr country lol , why do they even bother to compare with urs . If u got one then talk after that
@Anonymous-dy2zu
@Anonymous-dy2zu 18 күн бұрын
@@cardano5122 bruh, Its your people on KZbin who always yapping about how your train is superior than Japanese technology, Mocking India by saying that our HSR is so delayed, Is China is selling propoganda with projects now 🤡
@asepsyaepudinfirdaus1456
@asepsyaepudinfirdaus1456 17 күн бұрын
@@cardano5122 wkwkw nice one
@kuldeeprana1908
@kuldeeprana1908 16 күн бұрын
​@@cardano5122please cry harder...lol 142km bullet train track 😂🤣🤣
@mrknownothing2470
@mrknownothing2470 23 күн бұрын
For the God sake bring local reporters who can pronounce proper name of cities and provide correct information.
@nps7742
@nps7742 20 күн бұрын
Ita a US channel why would they do that at least he is from indian heritage. They don't have broadcast here
@carstarsarstenstesenn
@carstarsarstenstesenn 18 күн бұрын
easier said than done. they're not gonna hire a local for one little story when they can just have an employee do it
@jerrysingh9152
@jerrysingh9152 16 күн бұрын
Indian reporter speaks in 2 languages at the same time, listening from USA how can I understand
@zanjeer7827
@zanjeer7827 23 күн бұрын
so you will report some baseless accusation by opposition in the news?
@kamadotanjiro3118
@kamadotanjiro3118 21 күн бұрын
I mean they are the news so they should report it, people can choose to look at it if it's true or not.
@zanjeer7827
@zanjeer7827 21 күн бұрын
@@kamadotanjiro3118 Everything is in the news. It's just an accusation, so the report should also say it's an accusation by the opposition. It should not be reported as a fact. And that is the game plan of lefties.
@gopikrishna2043
@gopikrishna2043 22 күн бұрын
BJP for next 3 decades, INDIA will be best place to live.❤
@deeplife9654
@deeplife9654 6 күн бұрын
Lolz.
@anshumansarkar3206
@anshumansarkar3206 11 сағат бұрын
​@@deeplife9654cry hard... we will kick you ass
@Usb-ls5rq
@Usb-ls5rq 19 күн бұрын
2:42 as it was expected from an US news outlet you didn't forget to peddle disinformation, All the contract are given via process of public tender whichever company bids for the lowest and fulfills all the required criterias gets the contract.
@jimmylam9846
@jimmylam9846 18 күн бұрын
Modi gave AFCON $500 M contract in Maldives in which the company has no experience building a sea bridge.
@Usb-ls5rq
@Usb-ls5rq 18 күн бұрын
@@jimmylam9846 are you an idiot or what? nothing is granted to anyone whichever company wins the tender for a project with their plans and bid gets to work on it.
@Usb-ls5rq
@Usb-ls5rq 18 күн бұрын
@@jimmylam9846 don't use stupid logics, the company which won the tender by their plan and bidding got the contract.
@kuldeeprana1908
@kuldeeprana1908 16 күн бұрын
​@@jimmylam9846 you really have low iq.. Afcons is not Indian company.. Why would modi give a project in maldives to afcons.. He would have given to Adani Or ambani... Afcon won the tender because of low bidding.. Do you even know how tenders are given in India?
@TheKenzhang
@TheKenzhang 17 күн бұрын
India need to step up in the high speed railsconstruction,10 years for 500 kilometer high speed rail is too slow, China has already had 45000 kilometer high speed rail With current speed they need at least 1000 years to catch up with China
@bismayparida2115
@bismayparida2115 16 күн бұрын
There are other routes coming after this.... It is not the only HSR route
@RoRZoro
@RoRZoro 19 күн бұрын
Why are these Indonesians coming here and are bashing Japan and India while praising China? Don't compare the 500+ KM rail with the 140 KM Indonatian HSR. Indonesia just opened a small part of their HSR and is mocking India for "slow construction". If you want to compare, then compare it with the full 600 Km section up to Surabaiya or at least up to Madiun. It will take decades for Indonesia to finish it up to Surabaiya while India will run 500+ KM in the next 2 or 3 years.
@ZweiZwolf
@ZweiZwolf 18 күн бұрын
Indonesia finished the first segment and is operating today. India hasn't finished anything in a decade.
@jimmylam9846
@jimmylam9846 18 күн бұрын
..........then you could even laugh louder at Vietnamese HSR Japanese project 1500 KM completion dated 2045.
@atharvatar
@atharvatar 18 күн бұрын
​@@ZweiZwolf we have already completed viaduct that is longer than indonesia. Its still in construction so we can't open it do you have even the tiniest amount of sense in your head 😂
@ZweiZwolf
@ZweiZwolf 18 күн бұрын
@@atharvatar "It's still in construction so we can't open it". Doesn't count then. Make a noise when it's actually working.
@atharvatar
@atharvatar 18 күн бұрын
@@ZweiZwolf but this channel isnt even indian and the topic isnt about indonesians. Youre free to not watch and comment. Thank you.
@special.force.underneath
@special.force.underneath 19 күн бұрын
❤❤❤ India is a timeless Adventure ❤❤❤.
@Aron_justin
@Aron_justin 14 күн бұрын
Your country is waste
@huanghermann5207
@huanghermann5207 18 күн бұрын
When this HSR will be open?
@thakuromkarsingh2096
@thakuromkarsingh2096 17 күн бұрын
2026
@anujsethi7845
@anujsethi7845 18 күн бұрын
In India work is very slow The government just loves headlines.
@basant0077
@basant0077 16 күн бұрын
4 saal to rok kar rakha project ko udhav sarkar ne warna 2024 mein hi complete hojata ab 2026-27 mein hoga.
@darshan5726
@darshan5726 16 күн бұрын
COVID and maharashtra govt stalled this project
@jerrysingh9152
@jerrysingh9152 16 күн бұрын
Indian roads are the most dangerous in the world 😮
@easwaransanthakumar297
@easwaransanthakumar297 15 күн бұрын
As an patriotic Indian I support your statement.
@Aron_justin
@Aron_justin 14 күн бұрын
What about your country 😂 with no roads atleast we have
@Aron_justin
@Aron_justin 14 күн бұрын
​@@easwaransanthakumar297 don't support u
@TheMaverickanupam
@TheMaverickanupam 18 күн бұрын
Mumbai needs to invest first in intra-city and inter-city travel before interstate because the trains are jam-packed, unsafe and uncomfortable. This is a vanity project that ignores the ground reality.
@MatthewShane
@MatthewShane 14 күн бұрын
meanwhile indonesia is already planning an extension to its second major city surabaya, in total it'll be 900km. I think its better if india work together with china instead for future hsr projects
@Aron_justin
@Aron_justin 14 күн бұрын
No body can trust Chinese technology for long term Japanese technology is reliable and much more safe
@allied42
@allied42 23 күн бұрын
Our railways should also explore push and pull technology for Mumbai ahemdabad route and other such routes around india .....cos ppl who can't afford bullet tickets can atleast experience on time and faster travel by our Indian railways at affordable rates
@iXpress
@iXpress 19 күн бұрын
Need between Bangalore - Mysore - Chennai
@parikshitsharda4377
@parikshitsharda4377 19 күн бұрын
Not possible with DMK in Tamil Naddu and Kongress in Karnataka, they will create hurdles in land acquisition like Maha Aghadi did in Maharashtra. Kerala has been building the silver line our what in the air for two decades now. Only BJP can implement projects.
@alileevil
@alileevil 18 күн бұрын
@@parikshitsharda4377 Typical nonsense sprouted by an misinformed BJP supporter. The Vande Bharat trains, UPI scheme, GST, the Bangalore-Mysuru Expressway, the Metro rail project in Delhi and even the Mumbai-Ahmedabad high speed rail corridor, were budgeted and initiated during congress rule. These project take time to implement. Modi is taking credit for things he has not done. What exactly have the BJP Govt done in Karnataka since they took power? Did they improve the infrastructure? No. Did they improve sanitation? No. Did they cut down on corruption? No. All they did was raise electricity prices. Thank goodness for Congress who has made bus travel and electricity free. At least our tax money is used for the benefit of people and not going into the hands of Ambanis and Adanis.
@mihirpatel6162
@mihirpatel6162 18 күн бұрын
​@@alileevil so called "Well informed" Khangressi supporter !!! 😅😂
@alileevil
@alileevil 18 күн бұрын
@@mihirpatel6162 Mr Patel please do your research before believing WhatsApp posts by BJP IT cell dept. India and Japan signed a MoU to undertake a joint feasibility study of the Mumbai-Ahmedabad route in New Delhi in September 2013. This is before the Modi Govt came to power.
@Nmax
@Nmax 16 күн бұрын
​@@alileevilCongress Party makes big sky high promises then does nothing but play divide and rule and lines the Congressi politicians pockets The BJP has vision and gets things done.
@iheights
@iheights 19 күн бұрын
What about existing railway system in shattered position where lakhs of people travel every day So called vande Bharat and other costly trains are running late every day upto 3 hours Why railway is not trying for punctuality ??
@parikshitsharda4377
@parikshitsharda4377 19 күн бұрын
Bhai, itna bhi generalize mat karo. Kongress had made railways inefficient, stinking, dirty, never on time. Lagta hai acchi cheez pachti nahin tumko. I have caught several trains from delhi over the past few years, all were bang on time. Stop spreading lies. India could not develop because kongress had bred a whole community of pessimists like you over the 55 years that they ruled. Na to khud kucch accha karenge, aur koi aur kare to uski taang kheenchenge.
@iheights
@iheights 19 күн бұрын
@@parikshitsharda4377 you can check the status of 22477 of last 2 month You will get to know my point
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
1. brics vs g7!!!!!!!!!
@keithsnider1958
@keithsnider1958 20 күн бұрын
With over 1 billion people living in extreme poverty India needs to tackle that first
@devamjani8041
@devamjani8041 20 күн бұрын
Get educated
@keithsnider1958
@keithsnider1958 20 күн бұрын
@@devamjani8041 yes they need education also
@NirajKumar-wb5hg
@NirajKumar-wb5hg 20 күн бұрын
​@@keithsnider1958why u need to concern?
@keithsnider1958
@keithsnider1958 20 күн бұрын
@@NirajKumar-wb5hg I’m not. Just stating facts.
@zga3020
@zga3020 20 күн бұрын
Outdated data
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
1. trash duty 2. laundry 3. floors and 4. the circuit breaker!!!!!!!!!!!wd 40 lightbulbs and smoke detector!!!!!!!!!!!!!!
@showsnooker9285
@showsnooker9285 18 күн бұрын
talk,talk ,talk
@deeplife9654
@deeplife9654 6 күн бұрын
This project will cost 💲 two times more than originally estimated due to huge corruption 😂😂😂😂, not delay.
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
1. trash duty 2. laundry 3. floors and 4. the circuit breaker!!!!!!!!!!!!1
@jkardez4794
@jkardez4794 16 күн бұрын
India has got the worst road accident rate in the world. Biggest rail system but again terrible safety record with accidents taking place regularly . Politicians only brag about GDP without talking about standard of living ; consequently millions of Indians are deserting the country and going to USA,UK,EU etc. PM loves visiting foreign countries and giving "Jadu ka Jappi " to everyone but not giving same treatment to poor Indian citizens . Bullet train is only for PM's friends in the state while ordinary Indian citizens have to travel in terrible conditions . 2,00,000 crores is wasted on one sector while rest of India doesn't have basic infrastructure for rail travel .
@kalpeshwani8520
@kalpeshwani8520 20 күн бұрын
Cut travel time?..........how? Even bullet train aren't on state path route..,
@rmgeneral8554
@rmgeneral8554 19 күн бұрын
Bhai you don't have any work to do with big cities doesn't means anybody else don't have work there.
@parikshitsharda4377
@parikshitsharda4377 19 күн бұрын
Chinese opium kha ke aye ho kya. Believe in your own capacity also. Don't trash everything. State path or straight path? Could not understand. Arre kahna kya chahte ho?
@Advaith..
@Advaith.. 21 күн бұрын
Jai BJP!! Jai Modi!! 🚩
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
i have 9 accrods with roommates 6 5 accords with mom three accrods with the hoa and four chores!!!!!!!!trash duty laundry floors cirucit breaker!!!!!!!!!!!!!!!!!
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
8 pills a day until may 31 then four pills a day until july 4!!!!!!!!!!!!!
@huanghermann5207
@huanghermann5207 18 күн бұрын
Let us all watch whether it will be open by 2026 as promised. It has been delayed for decades now.
@zzgreyhat3886
@zzgreyhat3886 20 күн бұрын
china built 40,000 km high speed rail in the same period
@KishanKumar-qz1kt
@KishanKumar-qz1kt 19 күн бұрын
Only to know that it doesn't required
@parikshitsharda4377
@parikshitsharda4377 19 күн бұрын
Yes, they built most routes for the sake of it. It is incurring huge losses now. Not to mention ghost cities that they built, well jut to show off. Bet not even 10,000 km of the routes are viable. Chinese have this madness to overdo everything just to show off.
@zzgreyhat3886
@zzgreyhat3886 19 күн бұрын
@@parikshitsharda4377 china debt to gdp ratio is much lower than india
@ZweiZwolf
@ZweiZwolf 18 күн бұрын
@@parikshitsharda4377 Chinese HSR generates 8% ROI, so it's a good, viable investment. Same with prebuilding cities to avoid Indian-style slums. 45,000 km HSR is not yet enough, and China currently plans expansion to 70,000 km HSR by 2035. What's shocking is how many countries with big urban corridors still lack HSR to connect them.
@MohitKumar-nj8ms
@MohitKumar-nj8ms 18 күн бұрын
@@zzgreyhat3886 its actually much higher..China debt to gdp ratio is 287% while India has only 82%..stop reading from Twitter University 😂
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
1. one child policy 2. one party state 3. asian development model and 4. the keiretsu system!!!!!!!!!!!!1
@Oceansta
@Oceansta 20 күн бұрын
It's going to be a white elephant.
@KishanKumar-qz1kt
@KishanKumar-qz1kt 19 күн бұрын
No it will not. Per capita income of Gujarat and Maharashtra is more than national average and it is increasing fast. If it extended upto delhi than almost 100 million urban population will be connected like delhi ncr 30 million. Mumbai metropolitan 25 million. Ahmadabad surat vadadora 25 million. Jaipur udaipur Ajmer 10 million around
@Oceansta
@Oceansta 19 күн бұрын
@@KishanKumar-qz1kt check the ticket price of Shinkansen for 500 kms (Tokyo to Osaka). It's the same distance from Mumbai to Ahmedabad. Next, for the sake of the argument let's say the ticket will be half the cost ( even though it won't coz Japan already recovered their investment on capital a long time ago and we haven't even started). I've traveled by Shinkansen in Japan for 1 month. Even normal Japanese people don't use it there. It's extremely expensive even for Japanese standards. Only Japanese businessmen use it. Next , who will pay 5,000 for a Bullet train when flights are available for 2-3K. Nothing about this project makes any sense other than that Modi has been friends with Shinzo. It will eventually run in losses = public of India will be subsiding travel for a fraction of one percent of the population. If you are thinking that it will be used as a local train and 100 million potential ridership, you're dreaming. It will be a white elephant. Mark my words.
@prathamsoni4424
@prathamsoni4424 19 күн бұрын
@@Oceanstaur not getting the points it will motivate gonna use by every person but people who handles business in this city their employees they will use this trains n which will reduce the traffic from local trains n flights also it will create good revenue for gov to build more
@Oceansta
@Oceansta 19 күн бұрын
@@prathamsoni4424 this comment will be here even 10 years from now. Let's revisit and see who is right .
@prathamsoni4424
@prathamsoni4424 18 күн бұрын
@@Oceansta challenge accepted 🐅🐅🐅
@anantchhabra8407
@anantchhabra8407 22 күн бұрын
ANOTHER REASON TO VOTE FOR BJP ❤❤
@chinmaykamalapurkar16
@chinmaykamalapurkar16 16 күн бұрын
Lolz one more prapoganda news😂😂😂
@celebrityrog
@celebrityrog 20 күн бұрын
The more I see India the more I do not want to visit.
@KishanKumar-qz1kt
@KishanKumar-qz1kt 19 күн бұрын
No body is inviting you either. Don't bother about india
@parikshitsharda4377
@parikshitsharda4377 19 күн бұрын
As if we are dying to have you here, stay where you are.
@gauravmandal951
@gauravmandal951 19 күн бұрын
Get a job first
@jasonchu6304
@jasonchu6304 18 күн бұрын
Thinking about Garbage India made me 🤢
@jerrysingh9152
@jerrysingh9152 16 күн бұрын
Nobody cares 😮
@wwerfjk
@wwerfjk 19 күн бұрын
its vanity project , west of money . People don't have water to drink.
@jerrysingh9152
@jerrysingh9152 16 күн бұрын
U live in a cave😮
@xcel5203
@xcel5203 22 күн бұрын
Japanese bullet trains are the costliest trains- why wasn't a tender floated in the first case ? The travel costs too will be high ; ordinary people will find it difficult to afford it . The trains operating in other sectors going to the north and east are overcrowded, in terrible shape and in dirty condition . Why aren't these trains improved ? Ahmedabad and Mumbai are connected by plenty of buses, trains and flights ; there is absolutely no necessity of a bullet train on this sector except for local prestige . Indian railways safety record is abysmal ; instead of investing in vanity projects they should first invest in latest safety equipment.
@henrystevens3993
@henrystevens3993 22 күн бұрын
Which ordinary people will find difficult to travel and expensive?? Here the flight cost between AHD and Mumbai is 5k, if a train is running in 4k and reaching faster automatically people will opt for bullet train. Plus both the cities and the states are high income. So your claims are baseless. And yes Japanese trains are expensive but they are also transferring most of the technologies unlike cheaper Chinese counterparts. So it's mostly one time expense. Again your claims are baseless
@rkwsia
@rkwsia 22 күн бұрын
because this is an opportunity to learn and absorb tech after which we will develop our own hsr and other systems thst it requires at a cheaper rate. Chinese arent ready to do this. Instead they want to build everything and not transfer knowledge.
@xcel5203
@xcel5203 21 күн бұрын
@@henrystevens3993 Henry boy , Japan doesn't transfer shinkansen technology; it's protected and the manufacturing is in Japan itself . As for the journey plane will take ½ the time the train will take . Vande Bharat is not the success that the railways said ; they are not running faster than 90 kmph . Who exactly is baseless?
@cannibalronny7314
@cannibalronny7314 21 күн бұрын
What is the need for buying a car then u should travel in a bus with u r family,it is a future economic corridor joker,we are building infrastructure which leads to growth,infrastructure is created around services,learn some basic economic lessons chhapri
@strawhat9319
@strawhat9319 21 күн бұрын
Because they provided 80000 cr soft loan.
@xuxu-ql3ho
@xuxu-ql3ho 13 күн бұрын
中国人民向印度人民致以崇高敬意
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
1. trash duty 2. laundry 3. floors and 4. the circuit breaker!!!!!!!!!!!wd 40 lightbulbs and smoke detector!!!!!!!!!!!!!!
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
1. one child policy 2. one party state 3. asian development model and 4. the keiretsu system!!!!!!!!!!!!1
@jarrodyuki7081
@jarrodyuki7081 20 күн бұрын
1. trash duty 2. laundry 3. floors and 4. the circuit breaker!!!!!!!!!!!wd 40 lightbulbs and smoke detector!!!!!!!!!!!!!!
Can Amtrak Finally Bring High-Speed Rail To Texas?
15:09
Why Indonesia’s NEW high-speed train surprised me!
13:43
Superalbs Travels
Рет қаралды 161 М.
How to bring sweets anywhere 😋🍰🍫
00:32
TooTool
Рет қаралды 33 МЛН
WHY IS A CAR MORE EXPENSIVE THAN A GIRL?
00:37
Levsob
Рет қаралды 20 МЛН
Each found a feeling.#Short #Officer Rabbit #angel
00:17
兔子警官
Рет қаралды 6 МЛН
Bullet Train India Progress Update (May 2024)
6:00
NHSRCL INDIA
Рет қаралды 63 М.
56 High Speed Rail Links We Should've Built Already
18:35
CityNerd
Рет қаралды 252 М.
Why India Built This Impossible Railway Line
12:33
Lastly
Рет қаралды 917 М.
Inside America’s First High Speed Rail
8:30
More Perfect Union
Рет қаралды 245 М.
Mumbai: India's Transforming MEGACITY
14:11
TDC
Рет қаралды 1,3 МЛН