Рет қаралды 33,108
Viaduct Shipping's grain barge Loach, loaded with 200 tonne of wheat travels from the Steam Gathering at Acton Bridge back to Runcorn to finish unloading the rest of the 300 tonne load.
Powered by a Kelvin T6, the 100 ft long barge struggles for depth down the Weaver Navigation, which no longer sees large traffic like this.