Nambi Sir, There are many videos on the 4th line, but without any doubt your videos are the best. Most informative. I always enjoy watching your videos and always wait for your updates.
@NambiValavanАй бұрын
Thanks
@s.v.kumarkumar5204Ай бұрын
Very excellent fast improvements in the Construction of 4th Line and MRTS Tracks. If this same speed is maintained the work will be over by October 24. Let us all pray for the speedy completion of this project. You have given an excellent update. Your narrative very super and informative. Fully loved and enjoyed this Digital travel with you. All the Best. Take care.
@NambiValavanАй бұрын
@@s.v.kumarkumar5204 Thanks
@srirambalakrishnan8625Ай бұрын
Soon we may see Beach- ST Mount MRTS services.
@mohammedmeerangani3753Ай бұрын
அருமையான காணொளி மிக்க நன்றி
@NambiValavanАй бұрын
@@mohammedmeerangani3753 நன்றி
@manis6418Ай бұрын
இரண்டு நாளைக்கு முன்பு தான் உங்களை கேட்டிருந்தேன் வீடியோ போட்டு விட்டீர்கள் நன்றி நன்றாக இருந்தது கடைசி வீடியோவுக்கும் இந்த வீடியோவுக்கும் நிறைய வித்தியாசம் உள்ளது இந்த வேலை வேகமாக நடக்க வேண்டும் மக்கள் ரொம்ப துன்பப்படுகிறார்கள் எப்படியோ நம்பிக்கை பிறந்துவிட்டது உங்களுக்கும் நன்றி தொடர்ந்து இதை போல் வீடியோ போடுங்கள் நாங்கள் கண்டிப்பாக பார்ப்போம்
@NambiValavanАй бұрын
@@manis6418 நன்றி
@bennyj2359Ай бұрын
Ur Videos are meticulously explained at all times. Keep up the good work.👏🏻👍🏻
@NambiValavanАй бұрын
Thanks
@KS-yk2mhАй бұрын
Nice video Nambi. Very well explained. Looks like between Fort/Egmore and Beach, the 4th line would be the up line for both express trains and MRTS. so that the last line towards east would be the down line for MRTS. Fantastic planned by SR. We should really admire them in how they have planned in view of the RBI land not being available. 3rd line would be the down line, perhaps, from Beach to Egmore, for express trains.
@NambiValavanАй бұрын
@@KS-yk2mh Thanks. Yes if there is no train movement coming in opposite side means Express trains can be operated in 3rd line as down line
@karagis75Ай бұрын
@@KS-yk2mh no that will become worst for MRTS...it will become bottle neck for frequency....we need 10 min frequency during peak hours
@KS-yk2mhАй бұрын
@@NambiValavan No, it would be a permanent up line for both express and MRTS. Else, MRTS cannot operate smoothly. 3rd line would anyway be the down line for expresses. It is only for a short 1 km distance and hence shouldnt be a big problem for MRTS operations. Express trains are few and far between in this section.
@KS-yk2mhАй бұрын
@@karagis75 It wouldnt. Except when express trains come through (which would be few and far between), there should be no issue. Anyway, automatic signalling is going to be installed. Hence one train every 1 minute can pass through this section, at least theoritically. In practice, one train every 5 minutes can be allowed to run. So dont worry. MRTS operations wouldnt be compromised
@karagis75Ай бұрын
@@KS-yk2mh i am expecting lot of express trains post 4th line ... Better to have the option to short terminate at Fort MRTS ... otherwise this would become like Vyasarpadi Jeeva station bottle neck
@1970srinivasАй бұрын
Very neat and clean explanation. Easy to understand the working process. Excellent job brother 👏👏👏
@NambiValavanАй бұрын
@@1970srinivas Thanks
@somanathannagarajan6752Ай бұрын
Excellent presentation,Nambi. I like your video, and your comments. Thanks. வாழ்க, வளர்க, வெல்க. சோமு
@NambiValavanАй бұрын
நன்றி
@jokorah181Ай бұрын
Thanks for the excellent update. Appreciate your untiring efforts to provide all the passengers the correct position. Hope they will start the MRTS from November at least.
@NambiValavanАй бұрын
Thanks
@pg4832Ай бұрын
4th Line Work Update & MRTS Work Update Vera Level Capture & Information 🎉🎉
@NambiValavanАй бұрын
@@pg4832 Thanks
@rishvanthshriram9652Ай бұрын
Super update thanks 🙏your videos are really very nice and detail
@NambiValavanАй бұрын
Thanks
@RajeshtalkiesАй бұрын
Will they start from Fort to Velachery service atleast? chintathripet is terrible.
@NambiValavanАй бұрын
Mostly it will be from Chennai Beach only. My personal wish, if the work getting delayed means temporarily they should start from Chennai Fort, it be very useful for passengers
@sathishkumars6830Ай бұрын
Great video coverage with detail explaination - i think they will complete within 2 months fully. After park station towards egmore was platform only between 3 & 4 tracks but it looks like for EMU fast not for express trains! After park major realignment going to be done!
@NambiValavanАй бұрын
Thanks. May be your observation is correct. Let us see what will happen
@prasadjoshi7373Ай бұрын
Thanks for sharing
@NambiValavanАй бұрын
@@prasadjoshi7373 Thanks
@rayeesulislam5529Ай бұрын
Super coverage bro thanks for latest update about this project hope it will be completed soon...
@NambiValavanАй бұрын
@@rayeesulislam5529 Thanks
@thirumenithestormАй бұрын
Good Work Improvement
@SKEngineeringAnalyticsАй бұрын
Nice coverage and excellent update
@NambiValavanАй бұрын
Thanks
@natarajanramaswamy6191Ай бұрын
Good coverage and nice explanation 👍
@NambiValavanАй бұрын
Thanks
@chjsbabuАй бұрын
Thank you for update🙏
@NambiValavanАй бұрын
@@chjsbabu Thanks
@AruviVoyagerАй бұрын
MRTS Single Track - after RBI UNDERPASS -In the Near Future MRTS will be taken over by CMRL . - Remaining station after Chintadripet will also be Elevated Station ( PARK TOWN, FORT & BEACH )till BEACH guess so. - My Suggestion would be that the CMRL should be planned for further extending up to the PERUMBUR Train station. i.e BROWN LINE #Mount to #Kurukkupetta #Perumbur Via Existing MRTS ( mount to beach) with fully elevated Train station ( VEKACHERY , PATK TOWN, FORT , BEACH , WASHERMANPET JUNCTION , KURUKKUPET JUNCTION , PERUMBUR JUNCTION
not sure why RBi is not giving land, they are not like Military where there is threat of terrorist attack
@treatseaweedАй бұрын
On the contrary not giving land will give rise to such problem. Trains will slow down or stop near the RBI because of the missing 4th line. RBI is increasing the risk by not giving that small piece of land
@padmanabhanvaidisvaran5563Ай бұрын
RBI vaults security will be affected.
@sundaramviswanathan7893Ай бұрын
Nabi valavan sir look mumbai now the work are going for 5th snd 6th line from malad to virar approximately 50 kms with their space crunch too
@ThiruprakashcbАй бұрын
Nice coverage
@NambiValavanАй бұрын
@@Thiruprakashcb Thanks
@sundaramviswanathan7893Ай бұрын
Nice updates sir great effort and nice explanations no way railways should aquire land from RBI at any cost another think also railways should also go for tambaram to chengalpet 4 th line too as early as possible
@NambiValavanАй бұрын
Thanks
@anoopch7004Ай бұрын
Ahaa thank you.🎉
@NambiValavanАй бұрын
@@anoopch7004 Thanks
@karagis75Ай бұрын
Can mrts turn back from fort mrts instead of beach If required.... similar to Chepauk
@karagis75Ай бұрын
As of now 20 min frequency is bad for MRTS...will not be enough post reconnecting at Beach during peak hours
@NambiValavanАй бұрын
@@karagis75 In upcoming days we will know whether crossover facility will be available or not at Fort MRTS station
@karagis75Ай бұрын
@@NambiValavan thanks sir
@vasudevans4586Ай бұрын
Nenga vandale mass dan bro😊
@southindian1925Ай бұрын
Any plans for a shuttle train service between park to central station? That is the switching station for central right?
@NambiValavanАй бұрын
No . Foot Over Bridge will be connected to pathway to reach Chennai Central through existing pedestrian subway
@ramakrishnansethuraman2068Ай бұрын
Bro., Nambi Vallavan, very nice compilation.
@NambiValavanАй бұрын
@@ramakrishnansethuraman2068 Thanks
@saikrishnathiwakarrkАй бұрын
Nenga sooper bro 😂,thanks for the update
@NambiValavanАй бұрын
@@saikrishnathiwakarrk Thanks
@SivakumarN-kp5hwАй бұрын
Dear bro will express train will halt at beach and fort for the convenience of mrts train commuters and north madras public for a min halt once the new 4th line is finished and will st.thomas mount r.s mrts will be opened for traffic within 2 months time as flyover is completed there only Train tracks has to be installed pl kindly reply bro
@NambiValavanАй бұрын
@@SivakumarN-kp5hw Don't know may be in future they should consider Chennai Beach . St Thomas Mount MRTS train service can be operate by next year only ( likely by March 2025 is my prediction ) as Metro work has to be finished in integrated portion between St Thomas Mount - Thillaiganga nagar stretch.
@seyadpeer1868Ай бұрын
Tq ji Happy... Then velachry to parangimalai ennach... Athaiyum serthu podunga..
@NambiValavanАй бұрын
@@seyadpeer1868 Thanks. Work in progress. Girder work need to be complete at Thillaiganga nagar. Once it completed MRTS work will be finished
@swaminathanramesh5374Ай бұрын
Super coverage
@NambiValavanАй бұрын
Thanks
@venommvmlol6141Ай бұрын
Hi, Can you please make a video on the ECR widening from Thiruvanmiyur bus stand to Akkarai? Thanks.
@NambiValavanАй бұрын
@@venommvmlol6141 Will try
@sarath19in1Ай бұрын
Bro Chennai beach to triplicate parakum rail in operation ah? Please let me know
@NambiValavanАй бұрын
@@sarath19in1 No. Likely by this year end we can expect
@saravanan.msaran3387Ай бұрын
Super sir 👍
@NambiValavanАй бұрын
@@saravanan.msaran3387 Thanks
@arumugamb5844Ай бұрын
Super 🎉🎉😊😊
@NambiValavanАй бұрын
@@arumugamb5844 Thanks
@rathnaram96007 күн бұрын
Eagerly waiting for update after fdfs
@rathnaram96007 күн бұрын
Typical usual style
@amsterdampictures6726Ай бұрын
MRTS track is single line only for some distance
@lokesh40464Ай бұрын
0:46 What is meant by Spare rake? for what purpose Indian Railways use this Vande Bharat rake?
@NambiValavanАй бұрын
I think if main train has technical issue which cannot be resolved at specific time, this spare rake will be used as alternative
@ramachandrankrishnamoorthy9772Ай бұрын
If 4th line will be constructed on the existing stabling line would u please. Check it with the authorities concerned and reconfirm your existing msg.
@NambiValavanАй бұрын
@@ramachandrankrishnamoorthy9772 Will try
@rajanrgАй бұрын
thanks sir.
@NambiValavanАй бұрын
Thanks
@SaiponathGamesАй бұрын
What is the difference between stabling line and pit line?
@NambiValavanАй бұрын
@@SaiponathGames Stabling line used for parking empty rakes of train or Loco . Train coach maintenance done at pit line
@mbala8148Ай бұрын
At least they can speed the construction process up to Fort Station. People can interchange to Metro at Parktown Station as well. Thanks for the update👍👍
@saikrishnathiwakarrkАй бұрын
They are removing the foot over bridge in fort and assembling it to new fort over bridge. Same with park station and beach station. So that will take one week or 2 weeks. After that the over will be very fast .
@mbala8148Ай бұрын
@@saikrishnathiwakarrk ✌️✌️
@AruviVoyagerАй бұрын
All the Trains from NORTH & NE , Towards Egmore Tambaram Direction . CHENNAI stoppage ( mandatory) 1.Kurukkupetta Halt (North & West Chennai) Chennai Egmore Booking can board or deboard) 2.Park Halt ( Chennai Central / Central Metro) - Chennai Egmore Booking can board or deboard) 3 EGMORE ( Regular major stoppage) 4.TAMBARAM(Regular Major Stoppage)
@pumpkin7331Ай бұрын
7:43 Park Town station oda entry point change aana maari iruku.. Looks like entry will be from footover bridge instead of subway/road overpass. FOB oda approach point enga iruku nu any idea??
@NambiValavanАй бұрын
I think new FOB will be connected to existing footpath near Park station. But not sure. Will try to visit that spot and update soon
@ramprasathnarayanan9596Ай бұрын
I don't think this work will be complete in 2 month, minimum 5 to 6 month
@NambiValavanАй бұрын
May be . Let us wait and see what will happen
@treatseaweedАй бұрын
It will be miracle if they complete in 4 months even
@logukartheАй бұрын
It looks like Work completion next April or May potentially. Since during rain nothing much can be done.
@agsubmaniАй бұрын
It Will be Completed only by April 2025.
@arumugamb5844Ай бұрын
One yearla work nalla nadanthu irukkuthu bro jan25 train odumnu ninakiren oct nov dec over rai irukkum seekiram work mudinthal nallathu than bro
@NambiValavanАй бұрын
@@arumugamb5844Seekirama velaigal mudippanga nu yethir parkiren
@gmukundhanАй бұрын
Old foot over bridge completely removed
@sairaghu4411Ай бұрын
My opinion is they will start from may after all testing. Thanks for the update 🙏
@NambiValavanАй бұрын
@@sairaghu4411 Thanks
@stanleypremkumar5402Ай бұрын
If this pace of work is maintained we can expect inauguration on 1st April 2025
@nagababuairtelАй бұрын
Also MRTS platform 9 rake cars platform. Not running 12 cars rake train Pls two month extension mrts all railway station 12 cars rake platform
@prahladnatchuАй бұрын
இன்னும் மூன்று வருடம் ஆனாலும் கவலை இல்லை வேலையில் ஆமை வேகம் அவசியம்
@handriyav719Ай бұрын
pattabiram e depot to velachery emu trian started again
@rishvanthshriram965229 күн бұрын
illa bro 😅
@pavinrio3353Ай бұрын
Anna velacherry epo start panuvagha nu idea eruka ??
@NambiValavanАй бұрын
@@pavinrio3353 Velachery to St Thomas Mount ?
@pavinrio3353Ай бұрын
@@NambiValavan ella na , beach station to velacherry
@NambiValavanАй бұрын
@@pavinrio3353 My prediction this year
@rameshk8331Ай бұрын
Nice update. Pl provide latest position reg Mount MRTS Status and possible running of train till mount from beach station
@NambiValavanАй бұрын
@@rameshk8331 Thanks. Will do
@Aswinkumar7524Ай бұрын
Beach to Velachery service eppo start agum Anna
@NambiValavanАй бұрын
@@Aswinkumar7524 If everything goes well this year we can expect
@mahroofsm8305Ай бұрын
😊
@keshavharishАй бұрын
Bro when will mrts come to normal
@NambiValavanАй бұрын
@@keshavharish Likely this year
@vro667Ай бұрын
நீங்க சென்னை சுற்றி இருக்கிற Projects மட்டும். ஏன் மத்த மாவட்டங்களில் மாவட்டத்தில் எல்லாம் ஒண்ணுமே நடக்கலையா
@NambiValavanАй бұрын
@@vro667 காஞ்சிபுரம், திருவள்ளூர் மாவட்டத்தில் நடக்கும் ஒரு சில project's பற்றியும் வீடியோ உள்ளது