Queues across that bridge have always been a problem. That line was due to be taken under the control of the signalling centre at Gillingham in 2016 under Phase 2 of the East Kent re-signalling scheme. However that didn't happen due to a number of reasons, and it's not known now when that's likely to happen, but it doesn't look like it's going to be in the near future. As a result the crossing in its current form is likely to remain for some time.
@Nathan_A_RF6 жыл бұрын
I believe the crossing will be refurbished with barriers replacing the gates in the next couple of months
@MrBnsftrain7 жыл бұрын
I'm glad this crossing has these lights, especially with no alarms! Even though I like these old gates, new automatic barriers should be installed, with these old gates being preserved!
@sirvangorgun24017 жыл бұрын
MrBnsftrain
@UKLevelCrossingsChannel8 жыл бұрын
Same when I visited. The one-way bridge causes a complete mess of queues. They do need something like traffic signals which not only control the bridge but control the new upgraded level crossing too. Still, at least the crossings protected.
@timaamelinsios88628 жыл бұрын
UK Level Crossings, the-one way bridges don't cause a complete mess.
@johnlavery61163 жыл бұрын
Lived around the corner from it in 69,..lovely location.....Ireland
@freebrickproductions8 жыл бұрын
Sounds like how a lot of the projects that ALDOT funds go. Nice catches!
@sirvangorgun24017 жыл бұрын
Xygtz🌐🌍🌇🌇🌅🌋🌊🌌🎑🎑🌔🌔🌒 🌛🌗
@sirvangorgun24017 жыл бұрын
Schöne Grüße an bgddddsssssssassssssddssswfgtfggffffxfdddďddćdwfr