This just keeps getting better and better everyday can't wait to see the completion of our stadium continue to keep us up to date 💯💯💯💯
@DomenecSosValles3 күн бұрын
From an almost daily check of progresses and based on the build average speed observed during the last year (and also from being an engineer that has done some project management)... my educated guess for february - march 2025 is: - no problem with the pitch. Today 2 out of 4 remaining mobile cranes were being retired. Significantly less material remains stored on the ground. Excavation works for levelling have started. Adding the final layer of grass will take a couple of weeks. Not in the best weather of the year, but at 200K EUR cost it can be sacrificed and renewed in summer. - from some pictures taken by workers, the interiors of 1st and 2nd tier are almost finished. This was necessary for the last leg of seat installation, that will soon please all of us. People circulation to their seats is guaranteed insite these two original tiers from 1957 original Camp Nou. - the 3d tier will continue growing. For the feb/march date, the important thing is having the "0,5" floor of the VIP layer covered so that spectators can safely walk through and around the street level of this structure, as part of the general access. - circulation around the stadium will be guaranteed by both the aforementioned 3rd tier street level and the parkings having reached street level around all the stadium. With connections to the street both at south Travessera de Gràcia (already finished) and north Joan XXIII avenue (already connected and progressing faster than expected only a few weeks ago for a wider "contact" area). - street level of the parkings has reached a vast explanade at the west side between 3rd tier "tribuna" and th FC Botiga shop building. This covers the changing rooms and press room. The northern side keeps a little hole for machine entry (by crane lifting) and the south side is progressing towards meeting travessera at street level fully finished. It is totally expectable to have it completed in Q1 2025 thus allowing a 70% continuous walk around the stadium. - eastern side "lateral" is the ugly duckling with just a few areas having reached street level in the central part. North and south connections are still at -1 level. It is quite feasible to expect some circulation path finished at street level, complemented with the 3rd tier interior. To be noted, we are talking a 60% opening, so no need to have all the surroundings fully built. With only the 3rd tier street level and a ring around it at the same level above the parking there will be an area larger than the explanade around Lluis Companys stadium, just in order to compare.
@chhayasevale73262 күн бұрын
Hey man. I read the whole comment. Didnt get few things but thanks a ton for the info. Visca El Barca💙❤️
@EvaSan-l2u2 күн бұрын
Gracias ,si está bastante claro todo ,algo no entendemos los que no estamos materia obras ,pero muchas gracias por explicarnos como están obras , saludos eva
@spiritcrusher1309Күн бұрын
don't think any official would give permission for 60,000 people to enter the construction site with a lot of equipment around 🥴
@BaffourWilson-gm4er3 күн бұрын
Thanks for the update 🎉🎉❤
@Sarhelhndsa3 күн бұрын
Greetings from Egypt ❤❤
@antoniobis673 күн бұрын
Grandioso el campo 💯👍👍
@WillianRibeiro-m5q3 күн бұрын
estou doido pra ver esse novo estádio do Barcelona pronto meu time favorito
@nghibaocaopham3 күн бұрын
One of the constructing workers just had an accident yesterday. Hope he gets well soon.
@jmvaroi3 күн бұрын
Con 2.000 trabajadores en la obra, es normal que haya accidentes como torceduras en los pies y otros similares.
@garymoore60413 күн бұрын
I notice the tone has changed from matches will return before the end of 2024.
@manuelHernandez-qs1sy3 күн бұрын
No
@TizanJaw3 күн бұрын
Even in February this stadium will not be ready
@ffloversgaming50953 күн бұрын
The camp now is one of the biggest stadium in football history... So the 24×7 work is not enough for the 1Billon € cost huge project.....but excepted that Fc Bercelona will return in nou camp in late April or early July...but the stadium will be fully completed in 2026 march-April when the roof was attached
@ibrahimalzandani27722 күн бұрын
Feb 2026
@spiritcrusher1309Күн бұрын
don't think any official would give permission for 60,000 people to enter the construction site with a lot of equipment around 🥴
@daviddelaval66303 күн бұрын
They need to hurry VERY, VERY up Montjuic is not available anymore after May, 1st NB drainage layers + lawn rollers = 2 months
@DomenecSosValles3 күн бұрын
These works are already started since early december with the levelling of the pitch, retiring mobile cranes, shrinking amount of construction material storage...
@danirachman93283 күн бұрын
Capacity??
@ferranalbert53063 күн бұрын
105.000
@danirachman93283 күн бұрын
@ferranalbert5306 👍👍🔥🔥
@jmvaroi3 күн бұрын
55.000 /60.000 para Febrero 2025. 105.000 para Julio de 2026
@WillieSam2 күн бұрын
progressing but still a lot to be done.
@MaDFroG883 күн бұрын
No way March is ready 🤔
@HANGARRAVEКүн бұрын
why rush to enter the public when its not finished?
@هناءاليمنيه-ك6ش3 күн бұрын
رسالتي الى كل مسلم اخي في الله والله ما كتبت هذا الكلام الا من الضيق وقسوت الضروف اني طالبه من الله ثم منك لاتردني خايبه يا اخي احنا نساء ما نقدر نخرج نشتغل مثل الرجال ربي اكرمكم انكم رجال احنا نساء ما بنقدر نخرج ولا نشتغل مثلكم اخي وين الانسانيه اين الاخوه الايمانيه في قلوبكم''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' اخي اول كلامي انا اقسم بالله على كتاب الله اني لااكذب عليك ولا انصب ولا احتال اني بنت يمنيه من اليمن نازحين من انا واسرتي بيننا ایت الشهرب 20 الف يمني والان علينا 60 الف حق 3 شهور وصاحب البيت من الناس الي ماترحم والله يا اخي انه يجي كل يوم يبهدلنا ويتكلم علينا ويريد من البيت للشارع لانناماقدرنا ندفعله الأجار شافونا الجيران نبكي ورجعو تكلمو الجيران ومهلنالاخره الأسبوع معادفعنا له حلف يمين بالله هذا بيخرجنا إلى الشارع رحمه واحنا. بلادنا بسبب هذا الحرب ولانجد قوت يومنا وعايشين اناوامي واخوتي سفار والدنا متوفي الله يرحمه ومامعنا أحد في هذا الدنيا جاانبنا في هذه الظروف القاسيه اخوتي الصغار خرجو للشارع وشافو الجيران ياكلو واوقفو عند بابهم لجل يعطوهم ولو كسره خبز والله الذي له ملك السموات والارض انهم غلفو الباب وطردوهم ورجعو یبکو ایموتو من الجوع ما احد رحمهم وعطلة ردها لقمت عیش والان لوما احدنا ساعدنا في إيكيلو دقيق اقسم بالله انموت من الجوع فيا اخي انا دخيله على الله ثم عليك واريد منك المساعده لوجه الله انشدك بالله تحب الخير واتساعدني ولو ب 500 ريال يمني مع تراسلي واتساب على هذا الرقم 00967713342392 وتطلب اسم بطاقتي وترسلي ولاتتاخر وايعوضك الله بكل خير اخواني سغار شوف كيف حالتهم وساعدنا وأنقذنا قبل أن يطردونا في الشارع تتبهدل أو نموت من الجوع وانا واسرتي نسالك بالله لولك مقدره على مساعد لاتتاخر علينا وجزاك الله خيرا÷~π~÷~π~÷~ππ~π^ππ~π~π~π~√π
@CG688103 күн бұрын
It keeps getting pushed back. First it was late November 2024. Then it went to late December 2024. Then it was January 2025. Then it was February 2025. Now it is March 2025. They better hurry I think they ended their lease of Olympic stadium in May 2025!
@nanaorgen36053 күн бұрын
It's February or March next year. They're already working on the grass
@CG688103 күн бұрын
@nanaorgen3605 Yes that's what they already said.
@MaDFroG883 күн бұрын
It does look ready for March 🤔
@HANGARRAVEКүн бұрын
KEEP CALM they have time untill may 2025 so why the hurry for gods sake
@CG6881021 сағат бұрын
@@HANGARRAVE I don't care. I just saying that they were overly optimistic and anyone could see that there was still a TON of work that had to be done.