At this point, the Finch west LRT is gonna open before the Crosstown.
@mluna1898 Жыл бұрын
Of course it will
@Options96 Жыл бұрын
My guess is that it will open at the same time in December, 2023. That way they don’t have to print new transit maps twice
@Mcv5400 Жыл бұрын
😄
@Itsmytest Жыл бұрын
Here are the biggest differences between the Eglinton project and Finch West: the consortium building Finch West does not include SNC-Lavalin, and the vehicles came from Alstom, not Bombardier. Digging up the platform is not surprising: issues of potential derailments elsewhere on the line were highlighted by a former senior executive from the TTC who works on the Eglinton project (his quote was: "I wouldn't ride that thing, it'll derail in it's first year") and engineers raised concerns about potential flooding/snow accumulation on the "green" at-grade section, because there's no proper drainage. This was a big issue between Victoria Park and Leslie, where the line takes several dips. The "good news" is that taxpayers aren't immediately on the hook: it costs Crosslinx a monthly penalty in the millions to not have the line completed in time, and to fix its construction problems. The bad news is, SNC-Lavalin will again seek, and get, federal government support. The political groups that make up the organization that Crosslinx reports to (which include Metrolinx) are not doing enough to get the project completed faster, but it's also not entirely their fault. Crosslinx merely sees them as a bank account, for which they're rapidly losing interest on their future savings. So yeah: Finch West will open sooner, likely be safer, and without much future taxpayer liability.
@PWingert19667 ай бұрын
Righhhhhhhhtttttttttt.........I will be retired in 7 years and I bet it will still not be open.
@terrygelinas4593 Жыл бұрын
We need transparency on why this rework happened, on the line opening date, and what is being compromised elsewhere.
@kidsgames86998 ай бұрын
The money they’re using for this line they could have used to extend sheppard west and east 🤦🏾♂️
@nessa6859 Жыл бұрын
Honestly there's got be some major corruption in the fiasco or Canada has some of the worst construction workers globally. How come other countries can build a functional subway in a tenth of the time.
@nessa6859 Жыл бұрын
@@GH-mb4kd doesn't surprise me, my parents bought a condo, 3 years of delays and they finally got their condo and it's a joke, alert falling apart, no sound protection, hear every step. I couldn't believe it, I felt so bad for them. Is there a reason it's happening? Lack of Canadians in the industry or just cheaper ?
@my2iu Жыл бұрын
@@GH-mb4kd the crosstown is literally built by the main Canadian engineering giants. Those engineering firms thought the Crosstown was such a mess that they didn’t want to be involved in future projects, so the conservatives have outsourced future construction projects to various foreign firms and Iraq war contractors and assorted profiteers. But the Crosstown is a Canadian project. You’re just making up stuff if you suggest otherwise.
@crise1 Жыл бұрын
Big waste of tax payers money 11 effing years and countless businesses closed on eglington.
@philipkeeler9997 Жыл бұрын
I went half my life thinking Eglinton had a 'g' in it. It doesn't Eglinton - no 'g'
@o1ecypher Жыл бұрын
They got 3 years more money, they do it to stretch the contract and make more money. WAKE UP
@hhhhhh-vj2uc Жыл бұрын
capitalism and deception but the pandemic shut down also played apart. Couldn't work consistently for 2 years.
@my2iu Жыл бұрын
It’s a P3 project, so it should be a fixed cost project regardless of how long it takes. The contractors don’t get paid until it’s up and running.
@kiefershanks4172 Жыл бұрын
All these delays yet those in charge have been giving themselves big bonuses and pay raises ever since the pandemic began. I thought bonuses were supposed to be rewards for productivity and efficiency, not a lack of it. Corruption is afoot it seems.
@metrofilmer8894 Жыл бұрын
REM phase 1 about to open before line 5 eglinton phase 1 at this point
@bryankerr9174 Жыл бұрын
The NDP rep throws blame at "private contractors", but government employees didn't prevent the mistake being made in the construction. Also, it is on government to write contracts specifying quality standards and penalties to sub-contractors who don't meet these standards. Why didn't they do that?
@my2iu Жыл бұрын
The general idea is that the last few governments have worshipped private industry, thinking that every problem was best solved by just getting private industry to do it. People are now beginning to realize that if you outsource everything, then government no longer has the expertise to manage these projects any more, and the private industry consultants will rip you off big time to do the management for you. Even private industry is unhappy with this whole project too due to the poor profit margins. Unfortunately, the current government is doubling down on this approach of outsourcing construction with complicated contracts and complicated oversight, even though the emerging consensus is that the government should just build these sorts of things themselves instead of thinking that there’s some magical outsourcing solution.
@christianduval9067 Жыл бұрын
Here in Montreal it take 7 years and $500 millions to do similar project....was done last years ...surprise they have to close again for another 5 years for the metro line
@wence25games89 Жыл бұрын
Goodness! The channel tunnel was built quicker!
@jaygatz4335 Жыл бұрын
Why isn't this stop called Bermondsey/Sloane? Bermondsey is the better-known street.
@steveding2006 Жыл бұрын
OMG, it is still not open. I worked for crosslinx transit solutions in the IT area in 2021. basically, I did nothing valuable and learned nothing worthwhile in the 6 month period.
@mattjohnkearney Жыл бұрын
Metrolinx is an inept, unchecked car crash…drug ford ain’t up to stopping them either…too busy taking kickbacks from spa owners and developers
@satanspy Жыл бұрын
These guys are just building stuff in order to break it and build again! This is a shakedown! somebody needs to go to jail behind all this!!
@xmarxsthespot4844 Жыл бұрын
Well that was a waste of money 🤦🏿♂️ All of this, they could’ve just made a busway instead, it would’ve been way cheaper…
@greglovering9548 Жыл бұрын
OR--- rather than "cheaping-out" which they always do in Toronto.....the entire line should have been UNDERGROUND!!! These fools have NEVER learned over decades!! Yes---more $$$ up-front----but it WILL pay for itself in the long run. Case in point...ripping-up the stop at Sloane Ave. today!! WOW....just WOW!!!
@dalkskkskk Жыл бұрын
@@greglovering9548 hi yes, underground takes longer than overground
@dalkskkskk Жыл бұрын
ngl tho i think this is a joke commet
@xmarxsthespot4844 Жыл бұрын
@@dalkskkskk BRUTHER! It’s not, it’s been years, they shoulda been done with that line
@dalkskkskk Жыл бұрын
@@xmarxsthespot4844 i was talking about greglovering9548's commet lol
@jayflock7446 Жыл бұрын
Instead of destroying storefronts they coulda made those underground stair entrances on the sidewalk, nothing too fancy.
@cccowboy2576 Жыл бұрын
11 years on and still under construction, while all major Chinese cities finish new subway lines every 2 or 3 years…
@dalkskkskk Жыл бұрын
ok
@diab748 Жыл бұрын
I'm sure this project cost more than a subway at this point
@Tomthedrummer5 Жыл бұрын
Embarrassing. This feels like a giant money laundering operation.
@vuvuzela691 Жыл бұрын
Vancouver can build METRO lines for less money and in less time while Toronto can't even build light rail properly 😭
@ronberman8947 Жыл бұрын
In China this line would have been open in 5 years max. Another P3 boondoggle...
@Mcv5400 Жыл бұрын
I just hope this kind of failure would not happen on the Finch West LRT 🤞🤞🤞
@goylanddefree80 Жыл бұрын
Why isnt everyone in Transportation at the City and metrolinx fired already?
@TheTrolleyPole Жыл бұрын
City Transportation is not directing the Crosstown project and has no influence over its progress. You didn't mention the provincial Conservative government which has instructed Metrolinx not to publicly issue project status reports.
@MrAlen6e Жыл бұрын
There's definitely corruption happening, where is the rcmp and attorney General not investigating
@my2iu Жыл бұрын
The head of Metrolinx is a Conservative toady who gives Doug Ford political cover whenever something bad happens with transit, so the Conservatives like keeping him around.
@theroofer3181 Жыл бұрын
My favourite part was watching them cement in already badly rusted rebar. Workfare project.
@jccarriere3719 Жыл бұрын
How do you give business friends money peoples taxe money to your business friends, it's like this!
@funvideofan1625 Жыл бұрын
Yay more delays 🙄
@joecan Жыл бұрын
I love hearing from these armchair experts, sitting smugly at there computers, probably not even wearing pants.