Рет қаралды 362
Welcome to the Rusty Rotors trail build series. In this and the following episodes we will be hand building a trail in Kamloops, the free ride capitol of the world.
After weeks of flagging, then raking it out, we completed the the first pass of our trail Farmageddon, because if you ever get lost, the farms in the Thompson Valley below are to the east. And you can always see the farms. This section is lower Farmageddon, it runs 1.67 km or 1.03 miles, and drops about 240m or 787 feet. Next winter we will begin work on the upper trail, but for now, sit back, grab some beers and nachos, and watch this chump do back breaking physical labor.
Special thanks to my dad who has lent me his Polaris, his Yamaha XT 250, his tools, his thoughts and know how, and when he wasn't looking I raided his fridge and drank all his mini Pepsi's.
_____
This is space allotted for me to thank all our sponsors (crickets)...
_____
Music:
• Fractal of Light
_____
Animation:
Vecteezy Subscribe
Vecteezy Social Media
______
What we ride:
Len: 2023 Commencal SX V5
Graham: 2022 YT Capra Core 4 MX
===============
Follow us:
Len: / len_duro
Graham: / oth_mtb
===============
Support local!
Association:
www.bikekamloo...
Thanks for watching!
"Progression, not regression!"