Рет қаралды 7,272
Continuing on from Stage 1 of the new depot/shed area, the remainder of the incline is completed to the mainline entry point.
0:00 Introduction
0:36 Recap
1:13 Stage 2 area prep
2:57 Mini jigsaw cutter
9:12 Baseboard carnage
10:18 Elevated baseboard section
11:49 Lower half incline assembly
15:20 Viaduct plans change
19:26 Access lift-out section
22:55 Conclusion