I would like to thank you for taking the time to make these videos. Your channel is a treasure to me. No joke. Keep up the good work and thank you.i did learn a lot.
@NFPAJoeАй бұрын
Thank you !!! I have so much more videos I want to make so there is a lot more to come. 😎👍
@oje101Ай бұрын
@@NFPAJoe thank you.. please do.
@sebastianlealurquiola59056 ай бұрын
Buddy…. You're the man. You have been so helpful.
@NFPAJoe6 ай бұрын
Thank you!! I appreciate that and happy to hear 😎👍
@muhammadaleem18687 ай бұрын
Excellent explanation. thumbs up
@jamespoovathummoottil11832 ай бұрын
Hi Joe, I have GYM where one side of the GYM has I-beams @7'-6" (obstructed construction) apart and the other side of the GYM has I-beams @9ft apart (Unobstructed Construction). The I-beams are 21" deep. The question is, can we install standard spray sprinklers @ 22" below the deck in obstructed construction side of the GYM and within 1"-12" below the deck in the Unobstructed construction side of the GYM? Basically Can the obstructed and unobstructed sprinkler head location rules be used in the same room? Thanks
@NFPAJoe2 ай бұрын
Yes. In that situation you can 😎👍
@jetsgang52667 ай бұрын
A Joe wondering can you do video on above and below sprinkler heads when add when not?
@NFPAJoe7 ай бұрын
Hey! Yea that’s a good topic 👍.
@MartinKryekurti7 ай бұрын
@jetsgang It applies in wood structure ceiling ( or combustible insulation ) you got to protect both. Or when there is 2 sets of wood joists.
@NFPAJoe7 ай бұрын
Above and below coverage can have a lot of different situations. Definitely can be because of combustible construction above the ceiling like mentioned or could be for cloud ceilings, or slatted ceilings. Are you in any of these or putting heads above and below obstructions like duct work ?
@jetsgang52667 ай бұрын
@@NFPAJoe the duct takes up almost whole room it’s was a electrical room duct was tight to concrete deck so head is obstructed…it no Ceiling in room all uprights it didn’t make sense me cuz we only added 1 head above on one side of room meaning that head was blocked from deck it’s not going spray the other side of the room
@jetsgang52667 ай бұрын
@@NFPAJoe I wish I could just show u pic so you would understand more see it then we use 155 I thought electrical rooms normally 200
@austinhologroski6 ай бұрын
What's the rule when say there's only two steel beams affecting a line in obstructed construction? When can the sprinklers return to 1-12 below deck?
@NFPAJoe6 ай бұрын
You should go back to 1-12” below the deck as soon as the beams that are above the heads are spaced over 7’-6” on center. You could keep them at 1”-12” down even if it is obstructed construction as long as the spray pattern isn’t obstructed by the beams. You can figure that out using the beam rule. Going 1-6 inches below the structural members, max 22” is just an option. Let me know if this helps !
@austinhologroski6 ай бұрын
I only have two beams about 20" in depth and 5' apart that run horizontally across the center of the branch line. One head falls directly under the pocket of the beams and the rest of the heads on the line are spaced 8' spart. My question is what distance can I go back to 1-12 on the other side of the beams? The next head after the beam is 3'9 from the side if it. Can I run that head and the rest down the line at 1-12"?
@NFPAJoe6 ай бұрын
@@austinhologroski yes! Sounds like you can run that head and the rest down the line at 1”-12”.
@austinhologroski6 ай бұрын
@@NFPAJoe thanks 👍
@joenolan15744 ай бұрын
The melch
@NFPAJoe4 ай бұрын
@@joenolan1574 Joe!!!!! 😎🤙
@MartinKryekurti7 ай бұрын
Joe you a foremen , project manager.? . I worked in the field for about 11 years then another 8 design took a break for 3 years now I m back 6 months Are you on Instagram how can I contact you ?
@NFPAJoe7 ай бұрын
Heyyy. I am currently a foreman. I’ve been in the field since 2005 and I have been a trainer at local 550 training center for 5 years as a second job. You can email me at sprinklahfittah@yahoo.com
@MartinKryekurti7 ай бұрын
@@NFPAJoe I can tell from the tone of your voice . I started in the field 97 but I been taking time off few years here and there , however I was lucky to work with a good foreman like yourself in service. He had my hands on in every dry pipe that exist out there. Internal resets were fun back in the days.
@jetsgang52667 ай бұрын
A Joe was wondering can you do video on above and below sprinkler heads my foreman has me adding bunch heads just for nothing