Рет қаралды 22,868
▶ READ the article: bit.ly/2Zl3TrC
▶ SUBSCRIBE to the email: kimray.com/Subscribe
▶ SCHEDULE training: kimray.com/training
=============================
- PODCAST: anchor.fm/oilandgas
- FACEBOOK: / kimrayinc
- LINKEDIN: / kimray-inc
- PRODUCT & TECHNICAL SUPPORT: prodtechsupport@kimray.com or 405-525-4264
- CAREERS @ KIMRAY: kimray.com/Careers
---
In this oil and gas training video, we're going to follow the pipes on a well site and explain how each piece of production equipment works. From the rod pump, through the flow line and into a 2-Phase Vertical Separator. From there, we'll look at the meter run and explain the function of a Heater Treater. We'll also learn about the storage tanks and water processing before we look at the bypass lines across the site.
0:00 Production Introduction
0:13 Rod Pump and Flow Line
0:38 2-Phase Vertical Separator
1:11 Meter Run
1:55 Separator Operation
2:42 Heater Treater
Leave a comment below if you have any questions! Some question can be answered online, but for detailed technical support, email prodtechsupport@kimray.com and mention which video you're referencing.
Music by www.hooksounds.com