Festival is given more priority than the lives of people. Shows how our government cares for the lives of public .
@judaspriest51233 сағат бұрын
I don't think govt is doing this for the sake of festivals. The bridge is too old and some parts are already broken it's too dangerous for public.
@thungchanbemobemo4823 сағат бұрын
should give enough time to build,coz Hurry makes worry.
@Boombastic..3 сағат бұрын
Even if the project is completed on by November .... public should avoid plying this route till next year for safety reason , never trust this government , they will pay you 1lac if you are dead ....not worth dying 😅
@hof59432 сағат бұрын
Ok you don't ply
@gwayhonorengma84502 сағат бұрын
Really true. It's will be so risk.
@Genghiskhan007Сағат бұрын
bilkul risk nahi lene ka😂
@yourdadhere29824 сағат бұрын
From the first day, i know that Nagaland government will give pressure on them for hornbill festival 😢
@ifeed0074 сағат бұрын
Hopefully, the quality of the construction is not compromised due to time constraints.
@khiulam1443 сағат бұрын
Even a building needs two months to settle after pluster. They put water and keep it for months. Come on that’s a bridge.! If they don’t take proper precautions it will be another disaster like 4th mile bridge and nagarjan
@lancewyman47013 сағат бұрын
You can ask for reinforcement of workers and increase the workpace but please do not expect the cement to cure within 15 days.Proper curing of cement takes atleast 45 days to be ready for use.There are lots to be done and the govt orders the reparation to be ready before Dec 1 for a bridge thats gonne be in use for atleast 100 years.
@konyaknaga870546 минут бұрын
Hosa asey, house roof laka concrete tak pe 30days opor tey rakhe tu na. 😂😂😂
@schreedzz43112 сағат бұрын
This is a news that the news channel should frequently update about..
@bendangjamir26292 сағат бұрын
hope to update other projects like this way
@drakewalla28162 сағат бұрын
Please give this kind of projects to responsible and matured contractors since its not some colony roads or national highways aswell.
@walsjam55464 сағат бұрын
Morom laki.. company kan vi.... hurry makes disaster mr.minister don't give pressure to the contractor.....
@AlongJamir-d2n4 сағат бұрын
Aru pressure nadilea bei complain na
@Kiho-9538 минут бұрын
@@AlongJamir-d2n Etu kwa tho Naga manu khan pi ki ase nabuje😢blaaa blaaaa.
@rockywalls00743 сағат бұрын
Ministers are not concerned about the public inconvenience but their main priority is to make it complete before the 25th hornbill anniversary and the festivals. Actually they should concern more about quality and the safety of public instead of rushing on wrong pretext.
@Blacknight000072 сағат бұрын
I hope they will make it better, bigger and stronger😊.
@Caretech-fi8nyСағат бұрын
I don't think so because I think they will not touch the part where the rail line is going below or it will affect the railway operations of Dibrugarh - guwhati line
@lemdibasangtam8245Сағат бұрын
Plz common public... Don't be hurry burry... Becoz it's not for one time but life time ,, let them take time we need quality work... Quick finish..... Worry about collapse... No make sense of development for our City. 😊plz be patient.
@tudenjamir202831 минут бұрын
❤🎉🎉🎉🎉
@AchangImchen2 сағат бұрын
I wish public should know better for future..we public must know who makes the government ...public should voice out government atleast the over bridge must live 70yrs...if possible ....its for our future public....
@GiftYou-ho7ip3 сағат бұрын
Cement Slabs must be atleast kept for 20 days to completely dry. Not possible to be completed within the time frame
@ObedNagas-d7v3 сағат бұрын
Sir u r so smart good reporter
@a.shikatoswu54003 сағат бұрын
Investigative journalism should ask for safety rather than how fast they can build those roads....
@ZSt-m9e3 сағат бұрын
Before nature nothing would furnish enough I gureentee!!😁
@konyaknaga870537 минут бұрын
Yes, no need to force them either. Instead, the government should allow commercial vehicle movement on flyover. Yesterday, we took auto rickshaw hire from burma camp powerhouse to Nikos hospital at Rs.900. full-nagarjan thahekhu, dhobinala and nikos.... Public Khan laka grievances tu jani ley phal
@sanomanjiro93782 сағат бұрын
Its not for public greavances but the govt want before hornbill but the media should talk more on quality work and durability.
@linabosumi38013 сағат бұрын
Chumu town is development day by day power of Rio. Dimapur town he don't care. Christmas and hornbill festival season is approaching all travelers start to shop in chumu town. And idea can change your life. Said by Rio. To develop and income.
@etuase.5013 сағат бұрын
Ewwww eman sundur aro mun eman kala🤣🤣🤣🤣
@Goner053 сағат бұрын
Husa kuile mun kala naki?@@etuase.501
@hof59432 сағат бұрын
You are the last person who should be criticizing anyone else. Concentrate on your community.
@Goner052 сағат бұрын
@@hof5943 from which community are you from?
@hof59432 сағат бұрын
@@Goner05 The community that is not in the news every day for this and that crimes.
@Chube123.Teibambe-yf6xhСағат бұрын
global window reporter Mr. sungkum should highlight concern about hu
@ps386224812941 минут бұрын
Please more on potholes. Pressure ahould be given.
@Boss-vk4ty3 сағат бұрын
Today I saw u reporting at Duncan around 4 PM Sir
@PongsMali-zo8uj3 сағат бұрын
Hlo Nagas to construct oñe bridge within three months isn't the destructive ides.Coz it needß firm foundation it take time to set firmly with exact duration days.Why all the development are connected with Hornbill Festival only, rather than public welfare in the state in general as a whole!!!???
@bustingaСағат бұрын
The contractors are not going to make a concrete bridge, they are going to build using Re block, it's like Lego toys you know, just connecting block by block that's why it's gonna take only a few months, for Solid RCC bridge it will take years but will last centuries if built with good quality.
@NükenNlyzPhom4 сағат бұрын
Singham on the Mission 😊👍🤗
@alikichu73524 сағат бұрын
💪💪💪💪💪👍👍👍👍👍
@purplehead25213 сағат бұрын
And if completion gets delays for the next4-5 months..this people 👇 will still be complaining.
@avengersnewbie23483 сағат бұрын
i dont see any naga worker. only non locals
@avengersnewbie23483 сағат бұрын
btw i am hajira wala.
@blackpearl61672 сағат бұрын
@@avengersnewbie2348 don't you know that the dignity of labour doesn't exist among the Nagas ........Iman cheap lagiwo nahoi Naga manu inia chotu motu kam kurile toh......Ghor te aram pra buhina comments kuria hi naga manu ke mile
@SupportCorruptionInNagaland33 минут бұрын
You go and work, if no Naga what's a big deal?
@Bobby-rf2ec2 сағат бұрын
Is the new bridge gonna be big(wide)?
@thechange06043 сағат бұрын
The only way A1 which connects Manipur, Burma, Thailand and Malaysia should not humber the construction and compromise the quality of work due to festive seasons and pressure from the govt.
@vizoweneikha41233 сағат бұрын
Old Rob kwa 🫠
@leoyans4143 сағат бұрын
Sir 10 foot nahoi ami hotai tikhi thakke ami laka hisabte 7 to 8 foot hoponaki
@sanomanjiro93782 сағат бұрын
Yes it will b around 6 to 7 feet to mi assumption .correctly said.
@TheFact-code131 минут бұрын
Arey dimak nai naki Tumi Khan, dai Khan b Misa nakoile kikhabo.😂
@ShayengShiu2 сағат бұрын
The government is only focus on hornbill festival celebration not state development. Where do they think majority naga live.
@TalimoaWallingСағат бұрын
5:58 our Nagaland Best News reporter aslo takes Gudka 😂
@nagalima20233 сағат бұрын
If the minister house is completed within 45 days tn they wont be able to sleep ... let te contractor take tr time as much as they want ... we dont want another disaster
@ajiba8267Сағат бұрын
Misha mishi Work ase....still under 10% work done
@viralnaga91473 сағат бұрын
Fst slow nasavo lagaie quality savo lagie deh 🙏
@technomusic25513 сағат бұрын
Hornbill festival is more important to the GoN
@GiftYou-ho7ip2 сағат бұрын
Please interview Major Attri Singh 🙏
@_hello_dear_3 сағат бұрын
Destroy the whole fly over bridge can't trust the quality of the new bridge too better make a plan road with barricades when train comes. It will create a new job for train barricades controller.
@leoyans4143 сағат бұрын
6 months lagakam 2 months the kineka hopo?
@tajuangmeipu822 сағат бұрын
I saw only 2 or 3 labourers are working just for time pass every day
@kushiltorolnu89223 сағат бұрын
Planning future man made disaster.
@danielstephen810451 минут бұрын
It's very risky...
@bzzz60357 минут бұрын
It will collapse even if they able to complete in that time frame because even the tinest concrete dhalai takes 1 to 2 months for strong stability. It's incredible to hear such unprofessional time frame given to the contractor to build 100 years guarantee bridge within 3 months. Just my opinion
@Sting6992 сағат бұрын
After all under the bridge will open an illegal shop and the owner will be the contracter. Just see this happen in nagaland only.
@Mikekl57782 сағат бұрын
Has anymore notice the replies are not being shown. How comes😮😮
@aienlaozk-hj4dy2 сағат бұрын
Hornbill festival should be ban, land of festival, it's really shame for our Naga the poorest state but called land of festival, shame
@AoyapangYapangМинут бұрын
Nagaland government to tosora kum tibe enika montikina time tile peshiphal hobo hoi libe etia montia to tosora nemite nohoi hoilebe nagaland government to hornbill nemite joporjos kori aru bejite taratari bonai tekina kum to piahoile compani khan ki potnam tibo chor government nagaland highcourt aru dimapur stadium etc khan to 20 ,30 year to kotum nohoi lebi eto khan laka to eko awas nolai oh Rio government sorom korikina over bridge pona khan ki peshi to pressure netibe morom pora
@temjenwapang1743 сағат бұрын
Nah nah I dnt trust this ROB if it gets completed within 3 months...... Our life is timepass naki
@etuase.5013 сағат бұрын
Julti banai leh khushi nai, deri hoila aro hala nohobho naga manu🤣
@sixcloud366928 минут бұрын
Naaa 30 November tae nahobo..
@Kaks-wi3rm3 сағат бұрын
Ayoooo hooo🥹🥹😭😭😭😭😭😭 m running out of tears for my humble,hardworking and for public safety Government 😂😂😂