Great to see this work being done ready for the extension to Colo Vale and hopefully one day to Mittagong.
@lachlanjenkin165910 ай бұрын
I’m really excited for this let’s go 🎉
@lozzieelizadesigns0510 ай бұрын
Can’t wait to see a train visit Colo Vale again
@MrFordy9010 ай бұрын
That's so exciting, can't wait to visit again.
@robertcameron28086 ай бұрын
I thought the line would be reopened to Mittagong Jct i worked many trains on that track when it was open.
@JoelDavies-cl6nr10 ай бұрын
When will the Dombarton link be finished?
@andgate20005 ай бұрын
I hope the upgrade go farther....the loop line is bumpier than car road that run parallel to it.
@simonf890210 ай бұрын
When will the line open to Colo Vale.
@MSTV_202510 ай бұрын
Is there double track to Buxton now? Or just new double track at both ends?
@simonf890210 ай бұрын
It’s a single track. At both ends there a parallel lines to enable the locomotive to run round the train.
@johnnichol94124 ай бұрын
1:58 "restore the loop line in its entirety", that would be good if true. There will still be the missing link from Colo Vale to Braemar with Braemar to Mittagong Junction requiring an upgrade. Time for the State to stump up and do the job in its entirety, use some of the Metro money and give the country something. NSW is not Sydney.
@robertcoleman48615 ай бұрын
Why stop at Colo Vale it will be half a job go the distance to Mittagong.
@hayloft3834Ай бұрын
Couldn't have that, traffic might be forced to stop at Braemar level crossing.