Strange, why did It arrive on the "up" line then reverse into the "down line" and then head first into the sidings? Suppose once it's been loaded it would have to be backed out again onto the up/down line? Edit: Never mind, I can see now the cross section of rail doesn't allow access to the sidings from that line, hence the required movement.