Panelization of an Architecturally driven home

  Рет қаралды 13,876

NS Builders

NS Builders

13 күн бұрын

Nick Schiffer and Mark Henrichson from Cape Cod Panel discuss the panelization process for the 45 White Oak speculative project. They walk through CCP's facility and the design process of building the house before building the house.
Talk about your business,1 on 1 with Nick now. limited spots available.
www.nickschiffer.com/booking
NS Builders
www.nsbuilders.com/
INSTAGRAM
/ nsbuilders
/ nickschiffer
PRODUCED BY:
‪@Motifmediaco‬
/ motifmediaco
www.motifmedia.com/
VIDEO NOTES
Design Process and Challenges 0:04
Prefabrication Process 0:09
Benefits of Prefabrication 0:11
Framing Considerations 0:15
Window Detail 0:17
Roof Design and Fabrication 0:21
Installation Timeline 0:23
Key Word:
Panelization, prefabrication, framing, shop drawings, modeling, tolerances, layouts, details, roof, beams, installation
#45WO
#45WhiteOak
#NickSchiffer
#NSBuilders
#Building

Пікірлер: 36
@havaneseday
@havaneseday 5 күн бұрын
This is the future. No doubt. Excellent content!!
@RXQ003
@RXQ003 10 күн бұрын
Homeboy said “scary”, then proceeded to recall random dimensions at ease. Love witnessing people being excellent at their careers.
@jamesyork1004
@jamesyork1004 10 күн бұрын
Just finished a panel build, future of building for sure.
@giovannifiorentino8947
@giovannifiorentino8947 11 күн бұрын
Excellent service. Very useful to reduce site time expose to the elements.
@dngriffiths8105
@dngriffiths8105 9 күн бұрын
Prefab building is a clear winner, and one of the answers to building affordable homes going forward. There is tons of room for automation and systems, quality control, and delivering on spec and on time. If I were investing in the building sector, this is an area where I'd take a good hard look to identify the innovators and top companies. So much potential. Looking forward to seeing how this project unfolds.
@sparksmcgee6641
@sparksmcgee6641 6 күн бұрын
Weve been hearing exactly that from people outside the trades for 50 years now. Not one of them has shown that they can do it for the same cost. They have the same labor problems in the factories as we do in the field. There is a lot more to it than most people from the outside think.
@matthewbarbour2064
@matthewbarbour2064 10 күн бұрын
Architect from New Zealand here, very interesting to see how others put together high end residential. Attention to detail on this one will be next level. Great to see the collaboration involved. Looking forward to more videos.
@holland3g1
@holland3g1 8 күн бұрын
We've built a commercial building and our home with this method. Much quicker, and cheaper to get roofs and other aspects stamped for permits. We will be doing a third building with panels this winter. 100% recommend this approach.
@TheoneandonlyRAH
@TheoneandonlyRAH 11 күн бұрын
i am so bloody excited for this!
@ColeSpolaric
@ColeSpolaric 11 күн бұрын
I can't wait to see the framing video(s)
@paulgilliland2992
@paulgilliland2992 7 күн бұрын
We fabricate just about everything for commercial plumbing , industrial piping , hydronic systems, ductwork. Our shop labor fab rate is about 1/2 of the installing crew . We are a union shop in California and journeyman cost rate for a fitter or plumber is about $84/hr.
@richspence
@richspence 4 күн бұрын
I've seen multiple companies attempt prefab building, yet many seem to falter. While I'm not an expert, it appears that these companies often aim to bridge the gap between building affordable homes and scaling up quickly. In contrast, CCP seems to approach prefab building differently-not primarily focusing on budget or speed, though speed may be an added benefit. Instead, CCP appears to me as a company delivering a product that is precisely accurate and anticipates potential errors that might be missed in traditional architectural drawings. This method likely gives the customer a greater sense of confidence in both timelines and overall control of the project and I think it's as simple as that. I think this is a service that every 5+ person framing company, if they want to take their business slightly to the next level needs to do.
@jessegraham21
@jessegraham21 10 күн бұрын
amazing! what software does Mark Henrichson model in?!
@w2ttsy670
@w2ttsy670 10 күн бұрын
Wow, finally seeing pre-fab wall systems in the US. We’ve been using them for years now in australia and it really speeds up framing when you can erect a single storey dwelling in a day rather than a week. Two days for an additional storey. I’m surprised that more tract home builders aren’t using pre-fab framing systems already. Seems strange that this is only just starting with bespoke homes given the obvious cost savings on labour.
@sparksmcgee6641
@sparksmcgee6641 6 күн бұрын
Theyve been here for years also. Just finally getting to youtube.😊
@nenadpetrovic270
@nenadpetrovic270 10 күн бұрын
Can you share cost for this service?
@azengland100
@azengland100 11 күн бұрын
Cool video Nick. I'm excited to see the wall go up soon. FYI - I think you might have left chapter markings from a previous video in this one... No big deal obviously, but just wanted to let you know.
@NSBuilders
@NSBuilders 11 күн бұрын
Good catch! Thank you, just updated.
@ramarro-9104
@ramarro-9104 9 күн бұрын
yep
@Mike-dy8bq
@Mike-dy8bq 10 күн бұрын
In Michigan, any load over 8'-5" is a wide load.
@nickmanc86
@nickmanc86 10 күн бұрын
Will the skylight have any extra heating to help remove snow during large storms?
@NSBuilders
@NSBuilders 6 күн бұрын
I will not
@sparksmcgee6641
@sparksmcgee6641 6 күн бұрын
Its at the top of the thermal environment so itll be the warmest place on the roof.
@gmebritish
@gmebritish 10 күн бұрын
If your doing prefab walls why not go a step further and do SIP walls? Any projects utilizing SIP?
@sparksmcgee6641
@sparksmcgee6641 6 күн бұрын
Its a lower end product. It works and theyve fixed the problems. Its no different than a standard build because its all work in the field using trades that could be building a standard house. Some labor savings but there are a lot of little things that add up to them not matching standard homes. Panelized systems and floor cassettes are where its looks like its going. The drop in boxes being the larger version.
@Mike-dy8bq
@Mike-dy8bq 10 күн бұрын
Did they laser scan the foundation before they started building panels?
@NSBuilders
@NSBuilders 10 күн бұрын
Wasn't necessary since there is tolerance in the framing relationship, but we did survey it
@sparksmcgee6641
@sparksmcgee6641 6 күн бұрын
​@@NSBuilders what do they need as that tollerance? 1 inch????
@manfredvonrichthofen4738
@manfredvonrichthofen4738 10 күн бұрын
very economical way to save lumber down here we build one and throw one away..
@Tilethoughts
@Tilethoughts 10 күн бұрын
This method doesn't look any faster than site framed...same work just done off site.
@NSBuilders
@NSBuilders 10 күн бұрын
which allows you to effectively do 2 things at once, site/foundation and frame offsite at the same time, saving overall time
@CMCraftsman
@CMCraftsman 10 күн бұрын
It’s faster because you don’t need the floor framed to build walls on. You don’t need the foundation done to start building walls even. I always would start cutting first floor parts off the structural drawings when the foundation was being cast but I had no place to build walls until I had a floor on and decked
@Tilethoughts
@Tilethoughts 10 күн бұрын
@CMCraftsman yes it makes the overall job faster but far as framing the walls I see no time saved.
@Tilethoughts
@Tilethoughts 10 күн бұрын
@NSBuilders yes overall project can move faster ..but the actual framing looks equal in time off site vs on.
@aggiewoodie
@aggiewoodie 10 күн бұрын
Also, walls are framed in a climate controlled factory setting. They can use larger, factory level equipment.
Architectural walkthrough of custom residential home
30:59
NS Builders
Рет қаралды 11 М.
Structural engineer walkthrough of custom residential home
36:11
NS Builders
Рет қаралды 156 М.
I wish I could change THIS fast! 🤣
00:33
America's Got Talent
Рет қаралды 78 МЛН
ОСКАР ИСПОРТИЛ ДЖОНИ ЖИЗНЬ 😢 @lenta_com
01:01
БОЛЬШОЙ ПЕТУШОК #shorts
00:21
Паша Осадчий
Рет қаралды 3,5 МЛН
EXPERT TIPS| Continuous Insulation
35:25
AwesomeFramers
Рет қаралды 42 М.
Chairmaker
22:16
Appalshop
Рет қаралды 381 М.
CLT house in Viimsi - Client's story
6:21
Woodhouse Estonia
Рет қаралды 39 М.
Slab Foundations: Rebar vs Post Tension (my Engineer’s Opinions)
7:56
Family got unbuildable lot. They raised rustic-modern masterpiece.
18:22
Kirsten Dirksen
Рет қаралды 114 М.
New Build Design Hacks for Efficiency and Affordability
17:10
How to Build Your Own Home
Рет қаралды 14 М.
Abandoned Warehouse Renovation 💰💰 Full Cost Breakdown
29:48
Modustrial Maker
Рет қаралды 182 М.
Flush mounted outlets that are ALMOST invisible
10:39
NS Builders
Рет қаралды 110 М.
I wish I could change THIS fast! 🤣
00:33
America's Got Talent
Рет қаралды 78 МЛН