Parameters & Crank Handle Contact , IRS motor point part 02, Railway Signaling #14

  Рет қаралды 19,392

Railway Technical by CM Jha Academy

Railway Technical by CM Jha Academy

3 жыл бұрын

Link-
IRS Motor Point Basic-1- • IRS Motor Points Basic...
IRS Points Detection & Testing- Part- 2- • IRS point 01, Basic, D...
Parameters & Crank Handle Contact , IRS motor point part 3- • Parameters & Crank Han...
General Maintenance IRS motor point part 4- • General Maintenance IR...
IRS Motor Point Common Troubleshooting Part 02= • IRS Motor Point Common...
Monsoon Precautions IRS motor point part 5 • Monsoon Precautions -I...
Do & Don't with IRS Motor Point part 6- • Do & Don't with IRS Mo...
Joint inspection of IRS motor point & Crossing - Engg side- • Joint inspection of IR...
Joint Inspection of points and crossover, IRS motor point part -- • Joint Inspection of po...
Sequence of IRS motor point Operations Part 01= • Sequence of IRS motor ...
IRS Motor Point Common Troubleshooting Part 01= • IRS Motor Point Common...
What are requirements for electrical operation (Motor) of point?
Concrete OR wooden point layout with Two long sleeper
Complete Point zone shall be Track Circuited.
Relayed Or Software controlled circuit to operate the point to ensure safety so that it is not possible to
v take OFF a signal unless point it protecting is set & lock in required position (Route setting).
v operate point machine if point zone track circuit is occupied by any rail vehicle Track Locking).
v operate point machine electrically or manually if point is in the route OR overlap OR isolation of a signal which is in OFF condition (Route locking).
) Connect detection slide (which shall be nearer the toe) with the left hand tongue rail, irrespective of position of the point machine.
6.13) Connect the detector slides and adjust them in such a way that the roller falls inside the notches only when the point is fully set and housed. Simultaneously, the control disc must complete its rotation to ensure that the point is locked.
Test that the notch does not receive the roller when a 5 mm. obstruction piece is placed at 150 mm. from the toe of closed switch.
6.14) Connect the lock slides to he switch brackets through lock rods and adjust them such that the locking segment can enter the notches only when the point is correctly set. Test that locking segment does not get notch of locking slide when 5 mm. obstruction piece is placed at 150 mm. from the toe of the closed switch.
6.15) Tighten the nuts after adjustment.
6.16) Operate the machine several times with CH and ensure that the locking segment goes smoothly inside the angular notch of lock slide and with pressure in gear rack.
6.17) Make the electric connections & operate the machine several times. Ensure that the detection contacts make only at the end of the locking operation & both the control contacts make with the beginning of unlock rotation after detection breaks.
6.18) Check the correspondence between the point, point operating lever/point switch/point group and with the point indication.
6.19) Operate the machine electrically and note the working current by connecting Ammeter in series with the common terminal.
6.20) Conduct obstruction test with 5mm test piece.
6.21) Conduct the contact break test in the operation and detection circuit.

Пікірлер: 16
@umeshkumarprajapati2160
@umeshkumarprajapati2160 3 жыл бұрын
R/Sir, Bhaut He achha explain kiya hai normal se bolchal ke bhasha me .
@SunilTiwari-tw1jy
@SunilTiwari-tw1jy 2 жыл бұрын
Sir जी LC गेट के बारे में भी बताएं please
@rajadas6704
@rajadas6704 3 жыл бұрын
Great sir....
@SandeepKumar-xv1vo
@SandeepKumar-xv1vo 3 жыл бұрын
Super sir
@sugandhasingh1082
@sugandhasingh1082 2 жыл бұрын
Thank you sir
@RailwayTechnical
@RailwayTechnical 2 жыл бұрын
Welcome
@ankitdixit4677
@ankitdixit4677 Жыл бұрын
Sir motor ka current reverse or normal me lene ke liya 0 terminal se wire hata ke or motor ke terminal pe or wire pe meter ko touch current le sakte hai na.?
@RailwayTechnical
@RailwayTechnical Жыл бұрын
if interested please join visit www.chandramoleshwar.com for details
@kksinghrajpoot2995
@kksinghrajpoot2995 Жыл бұрын
Point relay sequence operation sir
@RailwayTechnical
@RailwayTechnical Жыл бұрын
please enroll online class visit www.chandramoleshwar.com
@VinodPatel-uw2eo
@VinodPatel-uw2eo Жыл бұрын
Sir how can I join your class , payment mode gpay or phonpay.not showing
@RailwayTechnical
@RailwayTechnical Жыл бұрын
visit www.chandramoleshwar.com
@yashwantkumar6489
@yashwantkumar6489 2 жыл бұрын
1ño per reverse feed rahega
@premnathsaw2100
@premnathsaw2100 11 ай бұрын
LDR ka full form
@bhaktidarpan_Official
@bhaktidarpan_Official 11 ай бұрын
Light depends resistance
@umeshkumarprajapati2160
@umeshkumarprajapati2160 3 жыл бұрын
R/Sir, Bhaut He achha explain kiya hai normal se bolchal ke bhasha me .
General Maintenance IRS motor point part 3, Railway Signaling #18
6:39
Railway Technical by CM Jha Academy
Рет қаралды 6 М.
IRS point 01, Basic, Detection and Testing, Railway Signaling #13
9:11
Railway Technical by CM Jha Academy
Рет қаралды 24 М.
Mama vs Son vs Daddy 😭🤣
00:13
DADDYSON SHOW
Рет қаралды 52 МЛН
这是王子儿子吗
00:27
落魄的王子
Рет қаралды 20 МЛН
TR/TPR KI WIRING/TRACK CIRCUIT/QTA2/RELAY WIRING OF TRACK CIRCUIT
8:36
Signal Engineering IR (SEIR)
Рет қаралды 3,3 М.
Datalogger Fault logic for Railway Signal Bobbing @RailwayTechShorts
7:33
Railway Technical by CM Jha Academy
Рет қаралды 917
IRS TYPE POINT MACHINE
10:07
STTC GZB
Рет қаралды 43 М.
Point machine. IRS type point machine. working of a point machine
6:16
Ускоряем ваш TV🚀
0:44
ARTEM_CHIBA
Рет қаралды 507 М.
КРАХ WINDOWS 19 ИЮЛЯ 2024 | ОБЪЯСНЯЕМ
10:04
Это iPhone 16
0:52
Wylsacom
Рет қаралды 1,4 МЛН
📱магазин техники в 2014 vs 2024
0:41
djetics
Рет қаралды 712 М.
تجربة أغرب توصيلة شحن ضد القطع تماما
0:56
صدام العزي
Рет қаралды 64 МЛН