Рет қаралды 5,251
Finishing up this drainage job, getting the insulation mounted and backfilled.
With the draining and insulating complete. Still left to do here is laying tiles on the driveway and also installing a 30+ meter long retaining wall in the property line and some tree felling.
Excavator Neuson 6003 rotortilt tiltrotator
Loader Lundberg 345ls