PennDOT Box Culverts

  Рет қаралды 3,260

Pennsylvania Department of Transportation

Pennsylvania Department of Transportation

Күн бұрын

Пікірлер: 2
@steveharkins279
@steveharkins279 Жыл бұрын
Penn Dot needs to raise all elevations by 25% across the board, Spring Mount Pa replacement bridge was completed. Then flooded a week later. Then flooded again from 16 feet to 21 feet above normal flow. (3 feet over the bridge). The biggest flaw of Spring Mount bridge replacement was not removing a 125 years of sediment after the bridge to open up Percuoman river flow rate. That sediments settled after the bridge. For the last 125 years. As engineers or construction trades, this Spring mount bridge replacement is a good lesson to go look at, at how we as Pennsylvania got this design wrong. If the bridge was 7 to 12 feet higher in elevation then we would not drive down then back up to the stop sign. The bridge would be level to the stop sign and at least 5 feet out of “natures” harms way. One woman died, in her car in 2019 after this bridge was replaced June 10 2019. Washed off it. All, go look at the design. It is a text book example of what not to do.
@NjJfjr
@NjJfjr Жыл бұрын
This is EXACTLY WHAT I NEED IN WOODLYNNE NJ . I NEED TO REBUILD THE UNDERSIZED UNDER ROAD CULVERT TO CREATE A BIGGER CHANNEL SO NEWTON CREEK ISN'T @ A CHOCK POINT AT INTERSECTION WOODLYNNE AVE & CYPRESS/LAUREL AVE & FOURTH ST CONNECTION OF THE CREEK. I WILL SAVE THIS FOR WHEN I DESIGN THE TOWNS original lake and widen creek bed to eliminate flooding. Once I get in as Mayor, I will get working with engineers to get everything going. What I want to do should have been done 48 YRS AGO! 💥BADA BING BADA BOOM 💥 I APPROVE THIS MESSAGE 🙌 Nj'sJfJr 👍🏼💪🏼❤️🇺🇸
Kerns Drive Box Culvert Install
10:54
Holtmeier Construction, Inc.
Рет қаралды 196 М.
Gasketed Box Culvert Installation Procedures
18:27
Hamilton Kent
Рет қаралды 1,8 М.
Une nouvelle voiture pour Noël 🥹
00:28
Nicocapone
Рет қаралды 9 МЛН
Что-что Мурсдей говорит? 💭 #симбочка #симба #мурсдей
00:19
人是不能做到吗?#火影忍者 #家人  #佐助
00:20
火影忍者一家
Рет қаралды 20 МЛН
“Don’t stop the chances.”
00:44
ISSEI / いっせい
Рет қаралды 62 МЛН
State Route 30 A25 Rapid Bridge Replacement Timelapse
6:40
Pennsylvania Department of Transportation
Рет қаралды 2,2 МЛН
1.5 Years of Heavy Construction in 1.5 Hours
1:36:35
Practical Engineering
Рет қаралды 696 М.
Why Buildings Need Foundations
14:51
Practical Engineering
Рет қаралды 3,5 МЛН
Putting in two huge culverts
9:19
Colton Lenderman
Рет қаралды 46 М.
concrete box culvert machine and mold
8:32
Dingli Construction Machinery
Рет қаралды 79 М.
Unblocking Lake Drain Makes a Waterfall
15:22
afreakinninja
Рет қаралды 1,6 МЛН
Footings | Why are they used?
5:57
Sabins Civil Engineering
Рет қаралды 5 МЛН
Precast Concrete Box Culvert Installation
9:51
Mark McManus
Рет қаралды 105 М.
Une nouvelle voiture pour Noël 🥹
00:28
Nicocapone
Рет қаралды 9 МЛН