Permanent Canal Closures and Pumps parts hauled off for repairs at 17th Street PCCP

  Рет қаралды 517

USACE NOLA

USACE NOLA

Күн бұрын

In early February 2024, parts for the Permanent Canal Closures and Pumps (PCCP) station at the 17th Street Canal were hauled to an off-site location for repairs while other equipment was being fixed on-site. The newly-repaired parts will be returned for reassembly once on-site repairs are completed at the 17th Street PCCP.

Пікірлер
The Hidden Engineering of Landfills
17:04
Practical Engineering
Рет қаралды 3,2 МЛН
АЗАРТНИК 4 |СЕЗОН 2 Серия
31:45
Inter Production
Рет қаралды 969 М.
Will A Guitar Boat Hold My Weight?
00:20
MrBeast
Рет қаралды 163 МЛН
The CUTEST flower girl on YouTube (2019-2024)
00:10
Hungry FAM
Рет қаралды 45 МЛН
Every Construction Machine Explained in 15 Minutes
17:21
Practical Engineering
Рет қаралды 3,5 МЛН
Electromagnetic Aircraft Launcher
15:09
Tom Stanton
Рет қаралды 1,3 МЛН
Downloading Images From US Military Satellites
26:51
saveitforparts
Рет қаралды 602 М.
Vertical Shaft Sinking Machine (VSM)
9:20
Herrenknecht AG
Рет қаралды 871 М.
How French Drains Work
16:41
Practical Engineering
Рет қаралды 2,1 МЛН
I Built The First LAMINAR FLOW ROCKET ENGINE
15:51
Integza
Рет қаралды 1,6 МЛН
How 3 Phase Power works: why 3 phases?
14:41
The Engineering Mindset
Рет қаралды 785 М.
Port Allen Lock update
6:17
USACE NOLA
Рет қаралды 191
АЗАРТНИК 4 |СЕЗОН 2 Серия
31:45
Inter Production
Рет қаралды 969 М.