Рет қаралды 65,443
Piling Rig Operation - How to operate a Piling Rig
In this Piling Video, Luciano Baffetti - Service Manager for IMT Piling Rigs will show how to operate a Piling Rig or Drilling Rig. The Piling machine used in this situation is the IMT A215 Hydraulic Piling Rig specially designed for Bored Pile Method.
Luciano has 30 years experience in Piling and anyone looking to get an idea about How to Operate a Piling Rig can benefit from his Piling knowledge.
The operational side of things on a Piling Rig is not extremely difficult to learn, such as the controls of the Piling Machine, or the functions of the Drilling Rig. However, the Piling Experience takes years and years of hard Piling work to be built.
Experienced Piling Operators with thousands of Piling Hours, claim they still learn new things about Drilling everyday, because soil can be different to drill from case to case.
Therefore, please ensure you are undergoing official required Piling Training, before drilling and piling, and please take this Piling video, simply as a guide to learn the Piling Machine controls.
For more information, please contact:
I.M.T. S.R.L.
Industria Meccanica Trivelle
via D’Ancona, 39 - 60027 Osimo (AN) Italy
P. Iva 02630450423
T. +39 071 723 341 - F. +39 0717 133 352
imt@imtspa.com