Рет қаралды 520
Video shows the process I took do the initial cleco’ing of the skin on the horizontal stabilizer along with the match drilling of the inboard ribs.
If you're enjoying watching my build process and it's helped you to decide to start one of your own, consider listing me as your referral when you place your order with Van’s. Just give them my builder number; 74901. They’ll send me a thank you of $100 towards my purchases and it doesn’t cost you a thing. Thanks so much and I hope you start your own dream of building a plane soon.
List of tools used on the horizontal stabilizer this far:
Qty. Tool
4 3/16" Cleco
4 5/32" Cleco
102 1/8" Cleco
322 3/32" Cleco
1 Drill Driver (Right Angle Drill used by not required)
1 #30 Drill
1 #40 Drill
1 #40 Long Drill
1 #21 Drill
20 Cleco Clamps
1 Rotodrive Countersink
1 Bench Grinder with Scotchbrite Wheel
1 Hand Squeezer
1 Numatx Compression Squeezer
1 1/8" Universal Head Die Set
1 1/8" Dimple Die Set
1 Bench Grinder with Scotchbrite Wheel
1 Drill Press with Scotchbrite Wheel
1 Bandsaw with metal blade & wood blade
1 Ruler
1 Sharpie Pen
1 Mallet
4 Irwin Clamps
1 Rib Flange Straightening Jig
Build time - 26 Hours
Total Project Time - 35 Hours (includes cleaning & organization)
Project Time including Video Editing - 53 Hours
Music by FREDJI / fredjimusic
Music by Joakim Karud / joakimkarud