Sir, this is by far the best and simplest explanation! You are brilliant!
@izenbridge4 жыл бұрын
Glad it was helpful!, Saket does many trainings apart from PMP, he is the lead trainer for ICP-ACC, ICP-APM, ICP-BAF, SAFe, and many more. In case you need more details, please visit www.izenbridge.com/
@krishnadasnair69574 жыл бұрын
Hi Sir, today I had my PMP exam and had cleared it in my first attempt. I must say your videos helped me more than any other study materials.Your way of teaching and clearing the fundamentals made things easier for me while preparing for the exam. Wish you and your team all the success and please continue your good guidance.
@izenbridge4 жыл бұрын
Congratulations Krishnadas!! It is encouraging that you found value in our videos. Keep exploring iZenBridge KZbin channel.
@jabsbabson52995 ай бұрын
I like the 'last man to finish eating' analogy in explaining the critical path. Great explanation, thank you
@izenbridge5 ай бұрын
Glad it was helpful!
@tonyrich44333 жыл бұрын
I'm only 1/2 way through but am fully entertained and getting the lesson. Love the energy, and the eating example. We came together, we leave together, that's it (waving my hands like he did) LOL Thank you for making this!
@izenbridge3 жыл бұрын
Glad you enjoyed it! You can explore iZenBridge complete program here - www.izenbridge.com/pmp/online-course/ This is complete and comes with an end to end support.
@sateeshreddy5549Ай бұрын
Very much simplified explanation sir. Thank you
@izenbridgeАй бұрын
Thank you for checking this out.
@naveensonkar871410 ай бұрын
sir.! Really very simple and lucid explanation for easy comprehension of this concept.! Wonderful
@izenbridge10 ай бұрын
Thanks for liking
@prakashlavania35434 жыл бұрын
I am at 4:07 and could not stop my self from writing AWESOME for till now explanation....will go further..
@izenbridge4 жыл бұрын
Thanks, Prakash for your kind words!! Keep exploring.
@sahithiginne3843 жыл бұрын
I did the same too. This is by far the best example of critical path and cleared up my confusion just as he mentioned about longest path being earliest to finish project.
@mrozabuthelezi65473 жыл бұрын
I've encountered the easiest explanation and my confusion is now gone and I'm at ease , I'll keep on practicing,thank you 🙏🏽🙏🏽🙏🏽🙏🏽May God bless you brother brother
@izenbridge3 жыл бұрын
Happy you found this useful.
@RupanagudiRaviShankar2 жыл бұрын
wonderful teaching sir .. many thanks for such a simple explanation of CPM
@izenbridge2 жыл бұрын
You are most welcome
@bigm23742 жыл бұрын
Thank you so much. Very explicit training.
@izenbridge2 жыл бұрын
Glad it was helpful!
@ArdhianFahmiSabani3 жыл бұрын
Thankyou man, Indian men still better as a tutor then my lecturer
@izenbridge3 жыл бұрын
Glad you liked it. To know PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@jpmaya72842 жыл бұрын
So well explained - thank you for sharing
@izenbridge Жыл бұрын
Thank you.
@taruncoolgemini3 жыл бұрын
Sir gone thru many vedios and this one explains the concept the best. Wonderful example of dinner makes the understanding best.👍
@izenbridge3 жыл бұрын
So nice of you. We do have complete program on PMP preparation, you may want to check it out here : www.izenbridge.com/pmp/online-course/
@vikassharma76642 жыл бұрын
Sir, you are simply the best. Thanks for amazing videos.
@joeuno35644 жыл бұрын
Best explanation of CPM in just 15 minutes!
@izenbridge4 жыл бұрын
Thanks for your kind words!! To know more about Saket training program, please visit - www.izenbridge.com/pmp/online-course/
@hahmed733 Жыл бұрын
Thank you so much your such a good teacher
@izenbridge Жыл бұрын
Glad you think so!
@teekaiwi41254 жыл бұрын
THANK YOU for simplifying this. I think it was very important for you to call out the misconception/confusion between the longest duration and the minimum project duration! Well done!
@izenbridge4 жыл бұрын
Glad it was helpful! You can explore complete PMP program here - www.izenbridge.com/pmp/online-course/\ It comes with end to end support.
@angeliaday86423 жыл бұрын
Fantastic teaching!
@izenbridge3 жыл бұрын
Glad it was helpful! To know more iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support
@vijaybaskarr824 жыл бұрын
Excellent explanation. I came here after i had some confusion reading PMBOK and all are clearly explained.
@izenbridge4 жыл бұрын
Glad it was helpful! To know more our PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@saurabhambekar52753 жыл бұрын
Very nice explanation. Thank you.
@izenbridge3 жыл бұрын
Glad you liked the video!! Keep exploring iZenBridge KZbin Channel. To know more iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@tahirhanif96692 жыл бұрын
Brilliant presentation
@kingofkings01014 жыл бұрын
Sir you should really do a full PMP tutorial course here. You are amazingly talented in teaching. Thank you
@izenbridge4 жыл бұрын
Yes, Pratap we have. You can explore it here - www.izenbridge.com/pmp/online-course/
@kimberlysamuel1310 Жыл бұрын
I concur! There's another video with this critical path example, but he was just rushing through the video. You're taking the time to example how each number comes into a block. Once I saw that I continued watching the video. Your explanation was very clear and concise. I hope you do teach a full video course.
@rajeevbr78603 жыл бұрын
You are just brilliant sir, You are a born teacher,
@izenbridge3 жыл бұрын
Thank you for your kind words
@Leedog4155 жыл бұрын
Thank you! Some of the other videos were going over to fast and not providing information so I finally got it after watching your video!! If I have other questions regarding other Project Management methods for my exam I'll look for more of your videos.
@izenbridge5 жыл бұрын
Thank you!! Kevahra for exploring and liking our content. Good to know that our videos are helping you in your preparation. To watch all the videos and complete program you can explore our online course here www.izenbridge.com/pmp/online-course/ You can also explore our following blog on "How To Calculate Total & Free Float?" www.izenbridge.com/blog/what-is-float-calculate-total-free-float/
@pratikpurohit24953 жыл бұрын
Thank you. Best explanation.
@izenbridge3 жыл бұрын
Glad it was helpful!
@gotliebkafidi93662 жыл бұрын
Have a test today and this might have just saved my semester! Thank you for clear explanation
@izenbridge2 жыл бұрын
great
@thereeb21412 жыл бұрын
This was so helpful
@cirit1012 жыл бұрын
Sir. Thank you 🏆. U are my hero.
@izenbridge2 жыл бұрын
So nice of you
@myhappinessseeker2 жыл бұрын
You are amazing! I understand CRM very well now! Thank you so much!
@izenbridge2 жыл бұрын
Great to hear!
@sunilm2947 Жыл бұрын
Dear - Good explanation. some confusion is cleared
@izenbridge Жыл бұрын
Glad to hear that
@sridharpantula Жыл бұрын
Really nice explanation. Very good
@puja96893 жыл бұрын
Wow ...great teaching !,,
@izenbridge3 жыл бұрын
Thanks for your kind words. Keep exploring iZenBridge KZbin Channel. To know more iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/
@rajsamuel55863 жыл бұрын
Wow this is so nicely explained. Really clear! Thank you!
@izenbridge3 жыл бұрын
Glad you enjoyed it!
@srikanths154 жыл бұрын
good one, excellent narration.
@izenbridge4 жыл бұрын
Glad it was helpful. To know more iZenBridge PMP program, please visit - www.izenbridge.com/ it is complete and comes with an end to end support.
@tylerdyrden12 жыл бұрын
I really appreciate you. Thank you
@izenbridge2 жыл бұрын
Thank you
@andypsc98444 жыл бұрын
Really amazing ! Clearly explain on the topic. Thumb up for you.
@izenbridge4 жыл бұрын
Thanks for liking, Saket does many trainings apart from PMP, he is the lead trainer for ICP-ACC, ICP-APM, ICP-BAF, SAFe, and many more. In case you need more details, please visit www.izenbridge.com/
@milesray20603 жыл бұрын
This was perfect! Great explanation and very entertaining! keep up the great work and Thank You for your help!!!!
@izenbridge3 жыл бұрын
Glad it helped!
@sanketjain45923 жыл бұрын
Very useful Sir, you explained in simplest form possible, thank you
@izenbridge3 жыл бұрын
Glad you liked it !! we do have online PMP Support program in case you want to check it out : www.izenbridge.com/pmp/online-course/
@wc42012 жыл бұрын
Sir, you are doing God’s work! Thank you for this!
@izenbridge2 жыл бұрын
Thank you for your kind words
@ayandaharmonytravel4 жыл бұрын
Best PMP teacher ever!!!
@izenbridge4 жыл бұрын
Great to hear! You can explore details of complete PMP program here - www.izenbridge.com/pmp/online-course/
@subramanyas86023 жыл бұрын
Very simple, clear and understandable explanation.. Keep it up!!
@izenbridge3 жыл бұрын
Glad you liked it!! Keep watching!! To know more iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@arts.maimounah3 жыл бұрын
Thank you so much
@izenbridge2 жыл бұрын
Thank you for watching.
@ferozkhan80113 жыл бұрын
Amazing explanation !!!
@izenbridge3 жыл бұрын
Glad you liked it!! Keep exploring!! To know more about iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@vivekpaul76374 жыл бұрын
Instead of 1 if you starts from Zero, that will be bit easier. Rest this is really informative and easy to learn..
@izenbridge4 жыл бұрын
Thanks for the feedback Vivek, to know more about Saket training courses, please visit- www.izenbridge.com/landing/youtube/Saket-Bansal/
@Debsahab3 жыл бұрын
very efficient and easy explanation. great job
@izenbridge3 жыл бұрын
Glad you liked it
@i3bdallah4 жыл бұрын
Thank you for the nice/clear explanation!
@izenbridge4 жыл бұрын
Gald you liked it!! To know more about Saket training programs, please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
@shayw54502 жыл бұрын
The best explanation so far!!
@izenbridge2 жыл бұрын
Glad it was helpful!
@cassiechimbini70553 жыл бұрын
You are really great its amazing you are gifted in your professional as I have been taught by the claimed PhD came out nil
@izenbridge3 жыл бұрын
Glad you liked video!! To know more about PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@leonardcunje75403 жыл бұрын
Thank you, this was great and very simply.
@izenbridge3 жыл бұрын
Glad it was helpful!
@Rohit-fh8pw2 жыл бұрын
awesome .. nicely explained sir
@izenbridge2 жыл бұрын
Thanks for liking
@malappuramkaka659 ай бұрын
excellent explanation
@gihurdler343 жыл бұрын
Fantastic explanation, especially the "shortest path" part
@izenbridge3 жыл бұрын
Glad it was helpful! To know more about PMP program please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support
@Supermama88w4 жыл бұрын
Thank you very much! You explained the things so clearly!
@izenbridge4 жыл бұрын
Thanks for your kind words!!
@shuchi95343 жыл бұрын
Thank god … I came across this one 🙏
@izenbridge3 жыл бұрын
Happy to know you found this useful.
@ketangarg51913 жыл бұрын
Very nicely explained
@izenbridge3 жыл бұрын
Keep watching!! To know more about iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@renjinimohan18302 жыл бұрын
This was simple and superb !
@izenbridge Жыл бұрын
Thank you.
@0612Devil2 жыл бұрын
Very well explained - thank you!
@andrewleong86433 жыл бұрын
Fantastic explanation
@izenbridge3 жыл бұрын
Glad you liked it!! keep exploring iZenBridge YoutTube Channel. To know more iZenBridge training programs, please visit - www.izenbridge.com/
@indirab5764 жыл бұрын
Brilliant and detailed explanation !
@izenbridge4 жыл бұрын
Glad it was helpful. To know more iZenBridge PMP program, please visit - www.izenbridge.com/ it is complete and comes with an end to end support.
@engr.shahabshah69225 жыл бұрын
really impressive way of teaching.
@izenbridge5 жыл бұрын
Thank you!! Shahab for exploring and liking our content. You can also explore our following blog on "How To Calculate Total & Free Float?" www.izenbridge.com/blog/what-is-float-calculate-total-free-float/
@chio31125 жыл бұрын
Great video. Helps me a lot to complete my project !
@saajkmk3 ай бұрын
Great Video Sir..
@izenbridge3 ай бұрын
Thanks
@zealvert4 жыл бұрын
Excellent explaination, Saket!
@izenbridge4 жыл бұрын
Glad you think so! To know more Saket training program please visit- www.izenbridge.com/landing/youtube/Saket-Bansal/
@davidrodda31984 жыл бұрын
You are phenomenal my man!
@izenbridge4 жыл бұрын
Thanks for your kind words!! To know what all Saket coach, please visit- www.izenbridge.com/landing/youtube/Saket-Bansal/
@PramodRaiK4 жыл бұрын
Great explanation !! Thank you!
@izenbridge4 жыл бұрын
Thanks Pramod for your kind words. Happy to know that you liked the video.
@adam158154 жыл бұрын
Awesome video - thank you for your time
@izenbridge4 жыл бұрын
Glad you enjoyed it! To know more about Saket training programs, please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
@animeshbasak4484 жыл бұрын
Explained well.... thanks for the video
@izenbridge4 жыл бұрын
Glad it was helpful! Keep exploring iZenBridge KZbin Channel.
@swapnilchoughule59435 жыл бұрын
Very clear and perfect explanation.
@izenbridge5 жыл бұрын
Thank you!! Swapnil for exploring and liking our content. In continuation, you can also watch the following video "Difference between Total Float & Free Float" kzbin.info/www/bejne/pGe8eoujiqqij6M
@DirkvanV4 жыл бұрын
This is just great content. Have a nice day.
@izenbridge4 жыл бұрын
Thanks, Dirk van V for your kind words!! Keep exploring our channel for quality content.
@chantalswartz44412 жыл бұрын
Thank you very clear
@izenbridge2 жыл бұрын
Thank you.
@crimemastertoto4 жыл бұрын
Excellent explanation, couldn;t be better
@izenbridge4 жыл бұрын
Glad you think so! To know what all Saket coach, please visit- www.izenbridge.com/landing/youtube/Saket-Bansal/
@shishirmishra57452 жыл бұрын
Great video, just 1 question can there be more than one critical path if yes then how to proceed?
@izenbridge2 жыл бұрын
Yes you can have more than one critical path and that makes many activities critical, mean risk of delay is increases since any of these activity not completing on time can delay the project. If you are preparing for PMP exam, may check our program details here: www.izenbridge.com/pmp/online-course/
@muhammadsani80795 жыл бұрын
very clear and concise explanation. Thanks!!!
@izenbridge5 жыл бұрын
Thanks, Muhammad for exploring and liking our PMP content. In continuation to it, you can also explore our video on Difference between Total Float & Free Float kzbin.info/www/bejne/pGe8eoujiqqij6M
@sankarmohapatra96884 жыл бұрын
Best Lecture
@izenbridge4 жыл бұрын
Thanks for your kind words Sankar!! To know more about iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@DeviAdyanIbrahim2 жыл бұрын
Easy explain. Like it
@izenbridge2 жыл бұрын
Thanks for liking
@RahmanFansClub4 жыл бұрын
Very clear explanation!
@izenbridge4 жыл бұрын
Glad you liked it!! To know more Saket training programs, please visit - to know more about Saket training program please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
@bishangafred55043 жыл бұрын
You're just nice.
@ankeetshah88334 жыл бұрын
thanks a lot . This was of great help
@izenbridge4 жыл бұрын
Thanks Ankeet, happy to know that you lied video. Keep watching them.
@PriyaPatel-du9sk3 жыл бұрын
this guy loves teaching
@izenbridge3 жыл бұрын
Glad you like it! To know more about iZenBridge PMP program please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@zaxmedov4 жыл бұрын
thanks for explanation. but it's interesting why source Rita Mulcahy 9th edition gives calculation a bit different ? As per RITA it's > ES + D = EF but as per your explanation it is (which is as per PMBOK6) ES + D -1 = EF.
@izenbridge4 жыл бұрын
Hi, Thank you for your comment, we wrote post on this matter sometime back, you may want to check this out : www.izenbridge.com/blog/comparison-between-early-start-as-0-or-1-in-network-diagram/
@saimehrar62534 жыл бұрын
Thanks a lot sir
@izenbridge4 жыл бұрын
Thank you! Cheers! To know more about PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@dirkdiggler71573 жыл бұрын
I’m still confused on Day 1 of work. Just kidding! The best explanation by far.
@izenbridge3 жыл бұрын
Glad you liked it!! Keep exploring. To know more iZenBridge PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@dingbatztv6332 жыл бұрын
How do i calculate when activities overlap for example; 4 activities: - activity 1 takes 12 weeks - activity 2 takes 7 weeks but can start 4 weeks early in parallel to activity 1 - activity 3 takes 7 weeks but can start 1 week early in parallel to activity 2 - activity 4 takes 7 weeks but can start 3 weeks early in parallel to activity 3 i'm struggling to find the late start, float and late end as i keep getting minus?
@izenbridge2 жыл бұрын
You may want to share your calculation pic at forum.izenbridge.com , we will also work on same
@AnkitSharma-oh3ix4 жыл бұрын
Great explanation, cheers
@izenbridge4 жыл бұрын
Happy to know you liked it. To know more about complete PMP program, please visit -www.izenbridge.com/pmp/online-course/
@omarmdsaleem4 жыл бұрын
Brilliantly explained.
@izenbridge4 жыл бұрын
Thanks Omar for your kind words!! Keep exploring iZenBridge KZbin Channel.
@reneewilde32674 жыл бұрын
Amazing best lesson Thank you
@izenbridge4 жыл бұрын
Glad it helped! You can also explore complete PMP program here - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@rivagoga45525 жыл бұрын
thank you so much fir the clear explanations
@izenbridge5 жыл бұрын
Thank you!! Riva for exploring and liking our content. You can also explore our following blog on "How To Calculate Total & Free Float?" www.izenbridge.com/blog/what-is-float-calculate-total-free-float/
@evanadavevisuals26684 жыл бұрын
Best and useful
@izenbridge4 жыл бұрын
Glad you liked it!! To know more about complete PMP program, please visit - www.izenbridge.com/pmp/online-course/
@edwardwatson89374 жыл бұрын
Holy crap, this was excellent!
@izenbridge4 жыл бұрын
Thank you! Cheers! To know more about PMP program, please visit - www.izenbridge.com/pmp/online-course/ It is complete and comes with an end to end support.
@shankerm39593 жыл бұрын
This is taught more in-depth than my paid course.
@izenbridge3 жыл бұрын
Happy to know that you found this useful.
@elac12565 жыл бұрын
Very clear explanation. Thank you. Did not see a course for the CAPM on your site. Do you have any plans to offer such training?
@izenbridge5 жыл бұрын
Thank you !! El for exploring and liking our content. We don't have an online course for CAPM, but the course content is the same for PMP and CAPM, you can consider enrolling to it. www.izenbridge.com/pmp/online-course/
@mhammedoukina6717 Жыл бұрын
Hello sir , could you please explain to us how to reduce the total float in primavera p6. Thank you in advance
@michaelbampoe91875 жыл бұрын
best explanation so far
@izenbridge5 жыл бұрын
Thanks for tour kind words!! Keep an eye to see more PMBOK6 videos, we publish them on regular basis.
@syedraafeuddinahmed62754 жыл бұрын
Best explanation sir, love you
@izenbridge4 жыл бұрын
Thanks and welcome!! To know more Saket Bansal training programs, please visit - www.izenbridge.com/landing/youtube/Saket-Bansal/
@richaaggarwal85523 жыл бұрын
Amazing
@izenbridge3 жыл бұрын
Thank you! Cheers!
@okechukwunwaiwu-odus5811 Жыл бұрын
For the critical path? What if we try to reduce the time by deploying more resources (material and personnel) or say from your example have someone else join the guy to finish the food on time? Is that possible?
@izenbridge Жыл бұрын
That is called crashing , its a schedule compression technique , where we allocate more people to a task to reduce its duration. This video gives some insight on same : kzbin.info/www/bejne/hYa8YYWcfLJ_qq8
@wajidsaleem73114 жыл бұрын
Best explanation ever sir❤❤❤
@izenbridge4 жыл бұрын
Thanks Wajid for your kind words!! Keep exploring iZenBridge KZbin Channel.
@ridhdhipatel21365 жыл бұрын
Good video... Helped me a lot
@izenbridge5 жыл бұрын
Thank you!! Ridhdhi for exploring and liking our content. In continuation, you can also explore the following video on "Funding Limit Reconciliation & S-Curve" kzbin.info/www/bejne/poGnnIiJYrqprNk
@kamalqmp4 жыл бұрын
Great
@izenbridge4 жыл бұрын
Happy to know you liked video. To know more about complete PMP program, please visit - www.izenbridge.com/pmp/online-course/
@ramr29515 жыл бұрын
Very nice explanation👍👍👌
@izenbridge5 жыл бұрын
Thank you !! Ram for exploring and appreciating our content. You can also explore our PMP content on "Earned Value Management" kzbin.info/www/bejne/g4CZdoKDmZJ2oaM