Рет қаралды 14,859
Hi,
In the video you will see how I made the foundations of my Polish house and their damp proofing. I used tar paper, mineral waterproofing and KMB compound for this purpose. The entire foundation, starting from the bottom of the footing, is protected from the ingress of moisture from the ground. This is a different approach than, for example, pouring a footing into the ground with W8 concrete. It is good to know that there are alternatives, although not necessarily cheaper and faster, but more solid.
In terms of additions: in the column sections, as well as under the concrete block walls, a rigid mineral waterproofing was laid - characterized by high resistance to pressure.
In the plinth zone, a flexible mineral waterproofing was laid (bridges cracks), and bituminous waterproofing (KMB) was pulled over it with an overlap of about 10cm.
The pipes embedded in the foundations are casing pipes. The actual pipes of the installation will pass through the casing pipes.
Visible waterproofing will be extended to the walls of the first floor (which will be bricked up before the floor on the ground is made) so as to connect them with the waterproofing on the base concrete (skim).
Enjoy watching :)