thats easy method....perfect solution for me. Thank you
@PrimeProjectControl3 жыл бұрын
Welcome Kiran, Please subscribe
@limtaolong27653 жыл бұрын
This is very useful yet fastest way to obtain the S curve...Thanks for the tutorial video
@PrimeProjectControl3 жыл бұрын
Thank you, please subscribe
@ronju04 Жыл бұрын
Learned a lot 😇
@venkatesans8698 Жыл бұрын
Will you able to two session class I will pay the money
@PrimeProjectControl Жыл бұрын
I will quickly, send me google invitation link at info@primeprojectcontrol.com
@aikdrw98202 жыл бұрын
Hello, thank you for your excellent tutorial, but i have a question, how to generate a progress curve in EXCEL like your video that the x axis is year and month, but the y axis is the progress of every month
@SufianLau3 жыл бұрын
Thank you for making this video available. I find the background music very annoying and unnecessary. Less is more. :)
@trovis85273 жыл бұрын
In the excel ssheet you used please advise what type of chart *(as what excel application calls it) was used to create the graphic tracking the 2 series of actual vs estimated progress, thanks
@daguanghui78953 жыл бұрын
Thanks for your training, it is very useful. But could you advise how to add forecast in S curve. Compare baseline VS actual +forecast, it will be more better to see the overall status against baseline
@venkatesans8698 Жыл бұрын
Sir, I have seen your video, but last three minutes I m unable to understand. Could u able to teach to me.
@PrimeProjectControl Жыл бұрын
Dear Venkatesan Please update 100 % in Microsoft Project Save as or Export or Copy the data into Excel Use S chart function and generate the curve
@fafafafafarrr3 жыл бұрын
Hi. What is the problem if my cumulative % complete in scurve doesnt get 100% at end project? It only reach 90%
@ravindrankrishnan29642 жыл бұрын
Pls put video for cost loading and cash flow generation. Where BOQ is available with Qty and Rates are also available. The Rates are on per Cum, per Sqm basis ( Post Civil works on item Rate contracts )...
@PrimeProjectControl2 жыл бұрын
Dear Ravindran Sir, Noted the Cash Flow Generation will be made available soon!
@ravindrankrishnan29642 жыл бұрын
@@PrimeProjectControl Thank you.
@harristamsi96822 жыл бұрын
How to automatically display cumulative % complete with decimal points?like 50.45% instead of 50%?
@PrimeProjectControl2 жыл бұрын
which version MSP you are using
@Jaffanajafdaeddilove4 жыл бұрын
Hi I have obtained actual work S curve. But how to obtain Planned S curve?
@PrimeProjectControl4 жыл бұрын
its very simple, save it as separate file (or baseline), open it and make it 100% complete, then follow as per the video to extract values. To your notice we also have a hot course on Microsoft Project on discount the link is >>>www.udemy.com/course/microsoft-project-2019-course-for-beginners-to-adavnced/?referralCode=F3D0137408624B581FC4
@Jaffanajafdaeddilove4 жыл бұрын
@@PrimeProjectControl Thanks
@ahmadhaziq14114 жыл бұрын
May i know the excel formula that you created for s curve? Thank you in advance
@PrimeProjectControl4 жыл бұрын
Dear Ahmad, U no need to create any formula in Excel. Step (1) Create a table showing month/Week rows, similar to the setting as shown in Microsoft Project, than copy the Planned Values from MSP and Paste it in the table of excel, and click to generate graph. I hope answered your query please feel free to write me at info@primeprojectcontrol.com
@adampeter22704 жыл бұрын
Can u show how to implement project extension of time due to covid in the program and s curve?
@PrimeProjectControl3 жыл бұрын
Dear Adam Peter yes, am going prepare the course on it will be released in a months time :) personally if you have a further query kindly write to us at info@primeprojectcontrol.com
@ildefonsooffemaria45873 жыл бұрын
Too loud background music..can also reduced next time😊😊
@fabricemcromeo124 жыл бұрын
Hi, Thanks for the video. How do this s-curve with the data dates instead of %? because some actual tasks will start late or even ahead of the planned/baseline dates.
@PrimeProjectControl4 жыл бұрын
hi Maxwell, i believe you want to know how to add actual progress S curve ? if that is your requirement - you can create a row below and insert actual %, also can create an early and late curves.
@hanawafis7553 жыл бұрын
@@PrimeProjectControl how do you want to show early and late curves?
@PrimeProjectControl3 жыл бұрын
@@hanawafis755 Dear Hana, To show early and late curves, firstly once you saved as a baseline changes; change the column for early dates (start & finish) copy the data and paste in excel to generate early curve and the same way do it for late. Thanks :) @hana wafis
@stannctstantalent33964 жыл бұрын
How about cummulative cost? How do i change?
@PrimeProjectControl4 жыл бұрын
Once cost loading is done, you can get cumulative cost curve, Please free to contact me at info@primeprojectcontrol.com if you have trouble to carry out..
@PrimeProjectControl4 жыл бұрын
i can advise based on which version of Microsoft Project you are using!
@thepresentcoach53277 ай бұрын
great but quite low definition man
@venkatesans8698 Жыл бұрын
In excel it was not come
@PrimeProjectControl Жыл бұрын
Did you follow the steps I have explained and you can copy into excel!
@venkatesans8698 Жыл бұрын
Sir, will you able to connect 20 minutes online session for me? I have try so many times but it won't come excel where did I mistake I don't know I would like requested to you.
@PrimeProjectControl Жыл бұрын
@@venkatesans8698 Please send google invitation link to the email